The invoice is from CV. Prima Daya Cipta Komputer to SMKN 1 Sungai Raya for IT networking equipment and installation. It includes items like access points, cables, fiber optic cables, converters, switches, and connectors. The total amount due is Rp 9,542,500.00.
The invoice is from CV. Prima Daya Cipta Komputer to SMKN 1 Sungai Raya for IT networking equipment and installation. It includes items like access points, cables, fiber optic cables, converters, switches, and connectors. The total amount due is Rp 9,542,500.00.
The invoice is from CV. Prima Daya Cipta Komputer to SMKN 1 Sungai Raya for IT networking equipment and installation. It includes items like access points, cables, fiber optic cables, converters, switches, and connectors. The total amount due is Rp 9,542,500.00.
SMKN 1 SUNGAI RAYA Invoice Date : 16 Apr, 2021 Jl. SOEHARTO , RASAU JAYA
Sl. Description Qty Rate Amount
1 Akses Point ( Indor ) 4 Rp 550,000.00 Rp 2,200,000.00 2 Cable Lan Cat 6 100 Rp 15,000.00 Rp 1,500,000.00 3 Drop core Cable Fiber Optic 300 Rp 7,000.00 Rp 2,100,000.00 4 Converter Fiber Optic 1 Rp 350,000.00 Rp 350,000.00 5 Hub Switch 8 port 1 Rp 250,000.00 Rp 250,000.00 6 Konektor RJ 45 cat 6 10 Rp 5,000.00 Rp 50,000.00 7 POE Spliter 5 Rp 25,000.00 Rp 125,000.00 Equipment seting instalasi IT 8 6 Rp 350,000.00 Rp 2,100,000.00 Networking
Payment Instructions Subtotal Rp 8,675,000.00
Pay Cheque to PPN (10%) Rp 867,500.00 NPWP 03.141.447.7-701.000 Total Rp 9,542,500.00 Send to bank CV. PRIMA DAYA CIPTA NETWORKING Paid Rp 0.00 Balance Due Rp 9,542,500.00