Prepared By:
exp Services Inc.
1595 Clark Boulevard
Brampton, Ontario L6T 4V1
T: +1.905.793.9800
F: +1.905.793.0641
www.exp.com
Date Submitted
May 30th, 2012
Client: City Of Orillia
Project: Preliminary Building Condition Survey Report – Brian Orser Arena, 433 Gill Street, Orillia, Ontario
Project Number: BRM-00063168-B0
Date Issued: May 30th, 2012
Table of Contents
Executive Summary i
1. Introduction 1
1.1 Objectives and Background ....................................................................... 3
1.2 Terms of Reference ................................................................................... 4
1.3 Site Observations ...................................................................................... 5
1.4 Life Cycle Forecasting and Funding .......................................................... 5
1.5 Building Codes........................................................................................... 6
i
Client: City Of Orillia
Project: Preliminary Building Condition Survey Report – Brian Orser Arena, 433 Gill Street, Orillia, Ontario
Project Number: BRM-00063168-B0
Date Issued: May 30th, 2012
ii
Client: City Of Orillia
Project: Preliminary Building Condition Survey Report – Brian Orser Arena, 433 Gill Street, Orillia, Ontario
Project Number: BRM-00063168-B0
Date Issued: May 30th, 2012
Executive Summary
exp Services Inc. (exp) has completed a Preliminary Building Condition Survey Report for
the site known as the Brian Orser Arena located at 433 Gill Street, Orillia, Ontario.
The information presented in this report provides a general overall assessment of the current
condition of the building and operating systems, based on our proposal and within the terms
of reference as well as limitations outlined herein. In this report we have provided some
typical examples of deficiencies and/or deterioration which we noted during our site review.
These examples are not intended to be a complete listing of all the areas affected, but rather
to provide an indication as to the types of deficiencies and/or conditions present on site.
We have been asked to make recommendations and opinions based solely on a visual
sampling of existing components. Test cuts, coring, design review, quantity surveys,
destructive testing, or instrument testing was not carried out. Consequently, further
investigation or additional testing may change our current recommendations and opinions.
i
Client: City Of Orillia
Project: Preliminary Building Condition Survey Report – Brian Orser Arena, 433 Gill Street, Orillia, Ontario
Project Number: BRM-00063168-B0
Date Issued: May 30th, 2012
1. Introduction
exp Services Inc. was retained by the City of Orillia to conduct a Preliminary Building
Condition Survey for the building known as the Brian Orser Arena located at 433 Gill Street,
Orillia, Ontario.
The site is located on the west side of Gill Street, just south of Oxford Street in the City of
Orillia, Ontario. The subject building consists predominantly of an ice rink facility with
some meeting rooms added after original construction. The building was originally
constructed circa 1973/74, with an 1981 addition consisting of two meeting rooms plus two
barrier-free washrooms. The front (east) elevation of the building is shown in Photograph
No. 1-1 below.
The structural framing of the ice rink consists of a prefabricated system comprised of large
prefabricated girders which span the entire width of the ice rink area in a north to south
direction. Although not visible due to the installation of insulation blankets on the underside,
the sloped metal roof of the ice rink is likely supported on steel purlins which also provide
lateral support for the girders. The girders are supported by tapered steel columns at the side
of the building.
The building is predominantly clad with a combination of plain block masonry and
prefinished metal siding. Areas of ribbed-face block masonry also form part of the exterior
cladding of the building. The roofing system of the building is comprised of a sloped
standing seam metal roof (over the ice rink) and ‘flat’ lower roof areas. The ‘flat’ roof areas
are constructed using a “Conventional Built-up Membrane Roof Assembly”.
1
Client: City Of Orillia
Project: Preliminary Building Condition Survey Report – Brian Orser Arena, 433 Gill Street, Orillia, Ontario
Project Number: BRM-00063168-B0
Date Issued: May 30th, 2012
The structural framing of the ‘flat’ roof area portions of the building is comprised of a
corrugated metal roof deck supported on either steel beams on the older original lower roof
portions or open-web steel joists on the newer addition. In both cases, the steel beams or
open-web steel joists are supported on load-bearing block masonry walls.
The incoming Hydro service is supplied into the facility from an underground distribution
system. The main switchgear consists of one wall mounted disconnect switch located in the
main electrical room on the south side of the building.
During our review, electrical distribution sections were found in the main electrical room and
in a closet within the newer meeting room addition. We noted fused disconnect switches,
splitters and circuit panelboards.
The main lobby, change rooms, common corridors, kitchen are illuminated with fluorescent
lighting fixtures with protective cages. The fluorescent lighting within the rooms of the
meeting room addition contained prismatic lenses. Lighting for the skating rink is
accomplished by a combination of fluorescent lighting and ceiling mounted HPS lighting
fixtures.
Exterior perimeter lighting is accomplished by wall and pole mounted HID lighting fixtures.
The parking area is illuminated by lighting standards. The main entrance and north entrance
canopies contain recessed soffit lighting fixtures.
Exit signs and emergency lights are provided in the exit paths. Emergency lighting consists
of battery packs and remote heads. The battery packs tested were operable.
The major equipment serving the skating rink consists of a refrigeration system which
utilizes one (1) chiller, one (1) evaporative condenser, two (2) compressors and several
pumps.
The chiller is located in the mechanical room and is manufactured by “Henry Technologies”.
Circulation of the refrigerant is accomplished by a circulation pump. The evaporative
condenser is located on the rooftop and is manufactured by “BAC”. Circulation for the
evaporative condenser is accomplished by a pump. The system is provided with two (2)
compressors. These two compressors are from original installation.
The system utilizes ammonia as a refrigerant to chill brine water. The skating surface is
maintained through the use of a series of piping that are found under the ice bearing concrete
slab and are fed from an header in an accessible trench on the east end of the ice arena.
The skating rink contains a refrigerant detection system. The system is manufactured by
“QEL” and contains three sensors.
Conditioned air serving the meeting room addition is provided by one (1) “Lennox” rooftop
HVAC unit. Heating of the facility corridors, change rooms, and various other common
areas is accomplished by hot water baseboard heaters. Hot water for the heating system is
2
Client: City Of Orillia
Project: Preliminary Building Condition Survey Report – Brian Orser Arena, 433 Gill Street, Orillia, Ontario
Project Number: BRM-00063168-B0
Date Issued: May 30th, 2012
accomplished by one (1) “American Standard” boiler located in the mechanical room
adjacent to the domestic heaters. Heating of the skating rink spectator area is accomplished
by two (2) “Solar Ray” radiant tube heaters suspended from the ceiling.
The skating rink contained two (2) dehumidification units manufactured by “Bassai” and
“Thermoplus Air”.
There are two (2) exhaust fans located on the east side of the roof. Each change room
contained a wall mounted exhaust fan which discharges air through the east wall. .
Ventilation for the washrooms in the meeting room addition is accomplished by ceiling
mounted exhaust fans. Ventilation for the skating rink is provided by one wall mounted
exhaust fan on the east side, and two louvers on the west side.
Water enters the facility in the mechanical room adjacent to the domestic water heaters, is
metered, and then distributed to the various plumbing fixtures throughout the facility.
Domestic hot water heating for the facility is accomplished by two (2) “A.O. Smith” water
heaters located in the mechanical room. There is also one (1) “GSW” electric water heater
located in a closet in the meeting room addition.
There is a washroom and shower located within each change room consisting of a
combination of older and newer plumbing fixtures. The main lobby and meeting room
corridor also contained a men’s and ladies washroom. Mop service basins are provided
throughout several service rooms. The kitchen contained a stainless steel sink.
This report provides an overview of the existing condition of the building, as well as a
professional opinion on corrective work recommended. This report has been divided into
sections according to major building components. Each section has been prepared by the
relevant exp discipline and presents observations, and comments on specific remedial work
required on deficient items observed. A master replacement cost summary table is provided
at the end of the report and summarized in the executive summary.
Exp was provided with a ground floor plan of the original building, prepared by Con-Dign
Limited, dated July 9th, 1973 as well as a floor plan/room finish schedule of the addition
prepared by Malcolm and Boyko Architects (drawing no. A-1), dated September 1981.
Furthermore, exp was provided with a five year inspection report of the building structure
prepared by Meades Engineering Limited dated May 1st, 2003 as well as a structural review
report prepared by Tacoma Engineers dated May 27th, 2009.
This report follows in part an older report entitled City of Orillia Multi-Use
Recreation/Leisure Facility Feasibility Study Sub-Consultant’s Background Report which
was prepared by Trow Consulting Engineers Ltd dated February 21, 2002. The older report
dealt with both expansion/planning type facility objectives on this and other location as well
as reporting on the basic physical condition of the facility and associated costs. This report
3
Client: City Of Orillia
Project: Preliminary Building Condition Survey Report – Brian Orser Arena, 433 Gill Street, Orillia, Ontario
Project Number: BRM-00063168-B0
Date Issued: May 30th, 2012
primarily focuses on the later (physical condition of the facility) and changes to the facility
since that time.
No detailed review of fixtures and fittings or other improvements was undertaken. Life-cycle
forecasting is based on a visual review of components, industry standards and consideration
of the information supplied by the client and site representative.
The scope of work was conducted using standard engineering practice and considering the
age and use of the building. We have recommended corrective work that we feel is necessary
and reasonably consistent with current practice.
The main components/systems reviewed include the following:
• Roofing Systems;
• Exterior Walls;
• Exterior Windows and Doors;
• Structural and Interior Building Components;
• Electrical Systems;
• Mechanical Systems, and
• Pavements and Exterior Site Features.
4
Client: City Of Orillia
Project: Preliminary Building Condition Survey Report – Brian Orser Arena, 433 Gill Street, Orillia, Ontario
Project Number: BRM-00063168-B0
Date Issued: May 30th, 2012
The following individuals conducted the field review and prepared the report.
Mauro Caschera, P.Eng. Project Management and Report Review
Unless otherwise specified, the total replacement cost identified for each component will
reflect the cost to remove and replace the existing component with the same type of
component.
The costs presented in the capital forecast table presented below are minimal allowance cost
estimates. Furthermore, cost estimates provided in this report are intended only as an
indication of the order of magnitude of the remedial work. More precise cost estimates
would require additional effort, possibly including more detailed investigation to better
define the scope of work, this additional effort was not approved by the client. The most
reliable cost of a repair or replacement is provided by qualified contractors quoting
competitively on an accurately defined scope of work as well as drawings and specifications.
All costs identified herein are in 2012 dollars.
The cost estimates provided herein do not include consulting costs to prepare specifications
or drawings for remedial work, tendering, contract administration or field
review/testing/inspection as well as do not include any permit fees, hazardous materials
surveying or abatement, contract management, contingencies, performance bonds, insurance
5
Client: City Of Orillia
Project: Preliminary Building Condition Survey Report – Brian Orser Arena, 433 Gill Street, Orillia, Ontario
Project Number: BRM-00063168-B0
Date Issued: May 30th, 2012
or loss of use costs. In addition any costs that are less than $5,000 have been deemed to be
covered as part of ongoing routine maintenance and not included in this report.
This report provides our opinion of probable costs for material physical deficiencies which
are evident at the time of our review and not for repairs or improvements that could be
classified as cosmetic or decorative. Our report does not include any loose furniture, office
furniture or equipment, computer/phone systems or network related operational equipment.
Existing buildings are often at variance with current building codes but, in general, there are
no legal requirements to upgrade components or systems to the standards set by these codes.
This is usually not the case with major renovations where compliance with applicable codes
and by-laws may be mandatory. In this report we have differentiated items that are definitely
code violations, and that must be corrected at this time, from those violations that may be
required to be corrected or for which we have recommended corrective action.
Building permit(s) may be required for some remedial work and approval(s) should be
obtained from the authorities having jurisdiction prior to implementing some of the
recommendations made in this report.
6
Client: City Of Orillia
Project: Preliminary Building Condition Survey Report – Brian Orser Arena, 433 Gill Street, Orillia, Ontario
Project Number: BRM-00063168-B0
Date Issued: May 30th, 2012
2. Roofing Systems
2.1 Description
The roofing systems of the building are comprised of a sloped standing seam metal roof over
the ice rink area and ‘flat’ roof areas at the lower roof areas present at the front of the
building and over the newer meeting room addition. Standing-seam metal roofs consist of
metal panels running vertically on the roof. Each panel has two seams that stand up
vertically and can be snapped or crimped together to seal the vertical seams. The most
popular anti-corrosive coating for steel panel roofing are based on metallurgically bonded
zinc, aluminum or a combination of the two. In this case, the sloped roof panels are smooth
finished without any striations or bent stiffening beads/ridges. The lower ‘flat’ roof areas are
constructed using a “Conventional Built-up Membrane Roof Assembly”.
Drainage for the sloped metal roof is provided by metal eavestroughs along the base of both
of the slopes with metal downspouts generally draining to an underground drainage system.
Drainage for the ‘flat’ roof areas is provided by several internal roof drains, however
historically scupper type drains may have been utilized but have since been abandoned.
We were able to gain access to the lower flat roof areas via a temporary portable on-site
extension ladder. However, the upper sloped metal roof was reviewed from the roof edge
from the ladder and was not accessed for safety reasons. The installation of a permanent roof
access ladder and/or roof hatch system should be considered as part of the plan going
forward.
The objective of our investigation was to evaluate the current condition of the roofing
systems based on a visual review. Test cuts into the roofing systems were not performed for
this investigation to confirm specific material within the roof assemblies. Therefore we
cannot fully comment on the condition of the concealed materials nor on the effects of future
7
Client: City Of Orillia
Project: Preliminary Building Condition Survey Report – Brian Orser Arena, 433 Gill Street, Orillia, Ontario
Project Number: BRM-00063168-B0
Date Issued: May 30th, 2012
serviceability and life expectancy of the roofs. Consequently, further investigation and/or
additional testing may change our current recommendations and opinions.
The following specific observations were made with regard to the roofing systems.
The built-up roof areas generally consist of a north roof area (i.e. over the meeting room
addition of the building), east roof area (i.e. over the front end of the building) as well as a
south roof area (i.e. at evaporative condenser rooftop unit).
8
Client: City Of Orillia
Project: Preliminary Building Condition Survey Report – Brian Orser Arena, 433 Gill Street, Orillia, Ontario
Project Number: BRM-00063168-B0
Date Issued: May 30th, 2012
9
Client: City Of Orillia
Project: Preliminary Building Condition Survey Report – Brian Orser Arena, 433 Gill Street, Orillia, Ontario
Project Number: BRM-00063168-B0
Date Issued: May 30th, 2012
10
Client: City Of Orillia
Project: Preliminary Building Condition Survey Report – Brian Orser Arena, 433 Gill Street, Orillia, Ontario
Project Number: BRM-00063168-B0
Date Issued: May 30th, 2012
11
Client: City Of Orillia
Project: Preliminary Building Condition Survey Report – Brian Orser Arena, 433 Gill Street, Orillia, Ontario
Project Number: BRM-00063168-B0
Date Issued: May 30th, 2012
According to information provided, the majority of the lower ‘flat’ roof areas were removed
and replaced approximately five (5) years ago. The exact age of the older south portion ‘flat’
roof area located around the evaporative condenser is unconfirmed at this time, however
based on our visual observations this roof area appears to be much older. Overall, the
majority of the ‘flat’ roof areas can be considered functional at this time, however several
deficiencies were noted, some of which can be considered maintenance related. These
deficiencies should be properly addressed to ensure these ‘flat’ roof areas can achieve a
maximum life expectancy. The older south portion ‘flat’ roof area around the evaporative
condenser appears to be approaching the end of its effective normal expected service life.
Based on our visual observations drainage of the ‘flat’ roof areas may be inadequate, despite
the evidence of more than usually expected amount of internal roof drains, as was evident by
the organic/vegetation growth on the roof surface. The ‘flat’ roof areas do not appear to be
well sloped. We could not confirm the original drainage characteristics of the ‘flat’ roof
areas, however, during our visual review we noted that the original building may have been
equipped with scupper drains along the front(east) roof edge which have been roofed over.
We noted interior roof drains which appear to have been installed after original construction
of the ‘flat’ roof areas of the original building. Painted ABS drain piping as well as a service
trench is evident at the south end of the building to facilitate discharge of these roof drains
added sometime after original construction. Our visual review of the beams on the underside
of the flat roofs of the original portion of the building did not identify any obvious
discernible slope. Proper drainage of a ‘flat’ roofing system is critical towards achieving a
maximum life expectancy and poor drainage typically shortens the service life and typically
increases the frequency of roof related leaks. The drainage characteristics of the ‘flat’ roof
areas should be properly reviewed and properly addressed as may be required and form part
of future considerations for planning going forward.
12
Client: City Of Orillia
Project: Preliminary Building Condition Survey Report – Brian Orser Arena, 433 Gill Street, Orillia, Ontario
Project Number: BRM-00063168-B0
Date Issued: May 30th, 2012
13
Client: City Of Orillia
Project: Preliminary Building Condition Survey Report – Brian Orser Arena, 433 Gill Street, Orillia, Ontario
Project Number: BRM-00063168-B0
Date Issued: May 30th, 2012
The sloped metal roof area appears to be in functional condition at this time. According to
information provided, the sloped metal roof was refurbished/resurfaced since original
construction, including the installation of a new layer of insulation on the top side and new
standing seam metal panels. Work on the metal eavestroughs at the base of the slope roofs
and downspouts was also reported.
No active roof leaks were reported with regard to the sloped metal roof area at the time of our
site visit. However, significant deficiencies were noted, particularly with the eavestroughs
and downspouts. In addition, several of the metal fasteners securing the metal eavestroughs
were noted to be corroded. Based on our visual observations, major repairs and/or complete
refurbishment of the eavestroughs and downspouts is required. Some repairs to the
protective covers and/or provision of additional protection is also required. At the same time
other localized issues with the corroded fasteners and minor maintenance can be carried out.
14
Client: City Of Orillia
Project: Preliminary Building Condition Survey Report – Brian Orser Arena, 433 Gill Street, Orillia, Ontario
Project Number: BRM-00063168-B0
Date Issued: May 30th, 2012
The drainage characteristics of the ‘flat’ roof areas will pose a longer term serviceability
issue. Remedial methods to address poor drainage by the installation of additional roof
drains do not appear to be very effective. More intrusive long term strategy may be the
installation of sloped insulation or tapered to drain insulation system however this is only
possible or at least cost effective when carrying out complete roof replacement.
The sloped metal roof should remain serviceable for many more years. Some attention is
required, such as properly addressing all damaged roof drainage components (i.e. metal
eavestroughs and downspouts/downspout protective barriers) including potentially complete
removal and replacement. In addition corroded metal fasteners and other maintenance
repairs can be carried out as part of this work. The layout of the downspouts should also be
reviewed to help minimize the need for draining of the upper sloped roof down to the lower
flat roof areas. Eavestroughs should also be properly sized.
The visual examination of the roofing systems has identified several items which will require
immediate repairs. The immediate repairs would include the following:
1. All vegetation and organic debris should be cleared from the ‘flat’ roof areas
including from the roof drains and metal eavestroughs.
2. All moisture stained ceiling tiles should be removed and replaced. Furthermore, all
active roof leaks should be properly rectified as may be required.
3. All poorly detailed metal drip flashing present on the ‘flat’ roof areas should be
properly addressed and/or adequately detailed.
15
Client: City Of Orillia
Project: Preliminary Building Condition Survey Report – Brian Orser Arena, 433 Gill Street, Orillia, Ontario
Project Number: BRM-00063168-B0
Date Issued: May 30th, 2012
5. All discarded materials/debris should be cleared from the ‘flat’ roof areas.
6. All deficiencies related to the south roof area should be addressed/rectified as part of
the removal and replacement of this roof area including the removal and replacement
of the perimeter flashings, addressing open roof penetrations, replacing membrane
flashings etc..
7. Insulation pedestals should be provided beneath all materials resting on the bare roof
membrane.
Proper and regular routine maintenance of the roofing systems and periodic professional
review of the roofing systems should be continued and form part of the maintenance budget.
16
Client: City Of Orillia
Project: Preliminary Building Condition Survey Report – Brian Orser Arena, 433 Gill Street, Orillia, Ontario
Project Number: BRM-00063168-B0
Date Issued: May 30th, 2012
The building is predominantly clad with a combination of plain block masonry and
prefinished metal siding. Areas of ribbed-face block masonry also form part of the exterior
cladding of the building. Exterior sealant is generally present around the doorway perimeters
as well as at joints between dissimilar cladding materials.
3.3 Observations
Based on our visual observations, the exterior wall systems appear to be in fair condition at
this time. However, some repairs/refurbishment of the exterior wall systems is required and
should be carried out within the next several years. The following specific observations were
made with regard to the exterior wall systems of the building:
17
Client: City Of Orillia
Project: Preliminary Building Condition Survey Report – Brian Orser Arena, 433 Gill Street, Orillia, Ontario
Project Number: BRM-00063168-B0
Date Issued: May 30th, 2012
18
Client: City Of Orillia
Project: Preliminary Building Condition Survey Report – Brian Orser Arena, 433 Gill Street, Orillia, Ontario
Project Number: BRM-00063168-B0
Date Issued: May 30th, 2012
19
Client: City Of Orillia
Project: Preliminary Building Condition Survey Report – Brian Orser Arena, 433 Gill Street, Orillia, Ontario
Project Number: BRM-00063168-B0
Date Issued: May 30th, 2012
20
Client: City Of Orillia
Project: Preliminary Building Condition Survey Report – Brian Orser Arena, 433 Gill Street, Orillia, Ontario
Project Number: BRM-00063168-B0
Date Issued: May 30th, 2012
21
Client: City Of Orillia
Project: Preliminary Building Condition Survey Report – Brian Orser Arena, 433 Gill Street, Orillia, Ontario
Project Number: BRM-00063168-B0
Date Issued: May 30th, 2012
The normal expected service life of good quality exterior sealants is in the order of 13 to 15
years. The deteriorated exterior sealants are a potential source of moisture ingress as well as
air leakage through the exterior wall assemblies. Therefore based on our visual observations,
the removal and replacement of all deteriorated exterior sealants should be carried out.
Exterior sealant should also be provided where missing. Some of this work would be
covered with the exterior doorway replacement activities described elsewhere in this report.
Further, more detailed study and design of appropriate repair strategies is required and
recommended prior to undertaking repairs to the exterior wall systems.
22
Client: City Of Orillia
Project: Preliminary Building Condition Survey Report – Brian Orser Arena, 433 Gill Street, Orillia, Ontario
Project Number: BRM-00063168-B0
Date Issued: May 30th, 2012
The exterior doorways of the building generally consist of commercial grade metal framed
metal (hollow core) swing doors set in metal frames. Some of the entrance doorways contain
glass inserts (i.e. main entrance and north end entrance doorways). Metal overhead garage
doorways are also present at the building.
Our review of the exterior doors was carried out during our cursory exterior review of the
complex and from within the building.
23
Client: City Of Orillia
Project: Preliminary Building Condition Survey Report – Brian Orser Arena, 433 Gill Street, Orillia, Ontario
Project Number: BRM-00063168-B0
Date Issued: May 30th, 2012
24
Client: City Of Orillia
Project: Preliminary Building Condition Survey Report – Brian Orser Arena, 433 Gill Street, Orillia, Ontario
Project Number: BRM-00063168-B0
Date Issued: May 30th, 2012
25
Client: City Of Orillia
Project: Preliminary Building Condition Survey Report – Brian Orser Arena, 433 Gill Street, Orillia, Ontario
Project Number: BRM-00063168-B0
Date Issued: May 30th, 2012
26
Client: City Of Orillia
Project: Preliminary Building Condition Survey Report – Brian Orser Arena, 433 Gill Street, Orillia, Ontario
Project Number: BRM-00063168-B0
Date Issued: May 30th, 2012
5. Structural Components
5.1 Description
The structural framing of the ice rink consists of a prefabricated system comprised of large
prefabricated girders which span the entire width of the ice rink area in a north to south
direction. Although not visible due to the installation of insulation blankets on the underside,
the sloped metal roof of the ice rink is likely supported on steel purlins which also provide
lateral support for the girders. The girders are supported by tapered steel columns at the side
of the building. Metal rod cross bracing is present and visible below the insulation blankets
on the underside of the roof at alternating bays.
The structural framing of the ‘flat’ roof area portions of the building is comprised of a
corrugated metal roof deck supported on either steel beams on the older original lower roof
portions or open-web steel joists on the newer addition. In both cases, the steel beams or
open-web steel joists are supported on load-bearing block masonry walls.
The exposed portions of the foundation walls of the building consist of concrete block
masonry. The foundations below are cast-in-place concrete.
Our site review consisted of a visual survey of readily accessible structural system
components to identify symptoms of structural distress (e.g., cracks or displacement) and, as
such, we could not identify any hidden or latent defects. Structural analysis, a review of the
design and physical testing of structural components was not part of the scope of work.
As part of our scope of work we reviewed the interior finishes for general damage which may
be the result of problems or issues with other building systems (i.e. damage ceiling tiles from
roof leaks or damaged walls from water penetration).
The exposed structural framing of the building appears to be in generally good condition.
There was no visible misalignment or deformations of the structural components. The
structural components of the building are expected to last the full service life of the building.
We did not observe any deficiencies which may have appeared to have impacted on the
structural integrity of the building.
The structural reports prepared by Meades Engineering Limited dated May 1st, 2003 as well
as a structural review report prepared by Tacoma Engineers dated May 27th, 2009, identified
some items which have been for the most part addressed. The latest report, prepared by
Tacoma Engineers, highlighted rusting of the exposed steel columns (particularly at the base)
27
Client: City Of Orillia
Project: Preliminary Building Condition Survey Report – Brian Orser Arena, 433 Gill Street, Orillia, Ontario
Project Number: BRM-00063168-B0
Date Issued: May 30th, 2012
located at the north and west sides of the building. Our visual review of these columns did
indicate evidence of rust/corrosion, which may have occurred since the last structural review
was carried out by Tacoma. These areas should be properly cleaned, primed and repainted
with a corrosion resistant coating, as recommended below.
28
Client: City Of Orillia
Project: Preliminary Building Condition Survey Report – Brian Orser Arena, 433 Gill Street, Orillia, Ontario
Project Number: BRM-00063168-B0
Date Issued: May 30th, 2012
29
Client: City Of Orillia
Project: Preliminary Building Condition Survey Report – Brian Orser Arena, 433 Gill Street, Orillia, Ontario
Project Number: BRM-00063168-B0
Date Issued: May 30th, 2012
30
Client: City Of Orillia
Project: Preliminary Building Condition Survey Report – Brian Orser Arena, 433 Gill Street, Orillia, Ontario
Project Number: BRM-00063168-B0
Date Issued: May 30th, 2012
31
Client: City Of Orillia
Project: Preliminary Building Condition Survey Report – Brian Orser Arena, 433 Gill Street, Orillia, Ontario
Project Number: BRM-00063168-B0
Date Issued: May 30th, 2012
32
Client: City Of Orillia
Project: Preliminary Building Condition Survey Report – Brian Orser Arena, 433 Gill Street, Orillia, Ontario
Project Number: BRM-00063168-B0
Date Issued: May 30th, 2012
The building is generally comprised of an ice rink, six (6) team change rooms, a referee’s
room, a main lobby/viewing area, a snack bar, men’s and women’s washrooms, two (2)
meeting rooms, three additional washrooms as well as various small storage/miscellaneous
rooms. The floor finishes throughout the building predominantly consist of a combination of
rubber flooring and vinyl flooring with localized areas of carpeting. The wall finishes
generally consist of painted block masonry with areas of painted gypsum board. The ceiling
finishes are generally comprised of exposed painted metal roof deck as well as suspended
acoustic ceiling tiles in the meeting rooms.
As part of our scope of work we reviewed the interior finishes for general damage which may
be the result of problems or issues with other building systems (i.e. damage ceiling tiles from
roof leaks or damaged walls from water penetration). We have carried out a basic review of
the interior finishes from an upgrading perspective, however the requirements and ultimately
costs would be driven by the future desired use and needs as well as aesthetic standard
required. This is beyond the scope for this report.
The following specific observations were made with regard to the interior components of the
building:
33
Client: City Of Orillia
Project: Preliminary Building Condition Survey Report – Brian Orser Arena, 433 Gill Street, Orillia, Ontario
Project Number: BRM-00063168-B0
Date Issued: May 30th, 2012
34
Client: City Of Orillia
Project: Preliminary Building Condition Survey Report – Brian Orser Arena, 433 Gill Street, Orillia, Ontario
Project Number: BRM-00063168-B0
Date Issued: May 30th, 2012
35
Client: City Of Orillia
Project: Preliminary Building Condition Survey Report – Brian Orser Arena, 433 Gill Street, Orillia, Ontario
Project Number: BRM-00063168-B0
Date Issued: May 30th, 2012
36
Client: City Of Orillia
Project: Preliminary Building Condition Survey Report – Brian Orser Arena, 433 Gill Street, Orillia, Ontario
Project Number: BRM-00063168-B0
Date Issued: May 30th, 2012
37
Client: City Of Orillia
Project: Preliminary Building Condition Survey Report – Brian Orser Arena, 433 Gill Street, Orillia, Ontario
Project Number: BRM-00063168-B0
Date Issued: May 30th, 2012
Although the majority of the interior finishes within the building can be considered
serviceable at this time, the majority of the interior spaces including but not limited to the
team change rooms, older/original washrooms as well as the referee change room are
undersized and are not to current/modern facility standards. Extensive demolition and
restoration work would be required to update these interior spaces to current/modern facility
38
Client: City Of Orillia
Project: Preliminary Building Condition Survey Report – Brian Orser Arena, 433 Gill Street, Orillia, Ontario
Project Number: BRM-00063168-B0
Date Issued: May 30th, 2012
standards. This work may include but not limited to improved layout for achieving a higher
level of efficiency based on space usage, installation of additional as well as comfortable
seating for spectators, modernization of the team change rooms (i.e. lockers, expanded more
private washrooms) as well as addressing overall handicap accessibility within the facility.
The budget numbers included in this report have assumed the complete demolition of all
current interior fit-outs, the restoration of new, updated building systems, and a new fit-out of
all interior spaces. Also included is the complete re-work of the older/original base building
washrooms both in terms of barrier-free compliance, energy efficient fixtures, and finishes.
This is a pure mathematical analysis based on the building area provided and has been
considered an upgrade capital expenditure in the cost table presented. Consideration may be
given to minimizing the environmental impact of the facility and ensuring the facility is as
self-sustainable as possible, which all have cost implications. There are many other factors
that will affect the ultimate costs depending on the final design and intended use of the
facility.
Based on the ground floor plan drawing provided, the ice rink surface is 85 feet in width and
185 feet in length (professional rinks are typically 85 feet x 200 feet). Consideration could
be given to expanding the ice rink, however this would require major capital costs as the
existing building structure would have to be expanded as the existing building structure is not
designed for a 200 foot ice rink length. This is beyond the scope of this report.
39
Client: City Of Orillia
Project: Preliminary Building Condition Survey Report – Brian Orser Arena, 433 Gill Street, Orillia, Ontario
Project Number: BRM-00063168-B0
Date Issued: May 30th, 2012
7. Electrical Systems
7.1 Description
The incoming Hydro service is supplied into the facility from an underground distribution
system. The main switchgear consists of one wall mounted disconnect switch located in the
main electrical room on the south side of the building. The main switch is rated at 400 Amps
and manufactured by “Square D”.
During our review, electrical distribution sections were found in the main electrical room and
in a closet within the newer meeting room addition. We noted fused disconnect switches,
splitters and circuit panelboards that serve the refrigeration equipment, evaporative
condenser, boiler, domestic hot water heater, exhaust fans, dehumidifiers and pumps.
Furthermore, the main electrical room distribution section contained one (1) transformer
which is used to step down the power.
The main lobby, change rooms, common corridors, kitchen are illuminated with fluorescent
lighting fixtures with protective cages. The fluorescent lighting within the rooms of the
meeting room addition contained prismatic lenses. Lighting for the skating rink is
accomplished by a combination of fluorescent lighting and ceiling mounted HPS lighting
fixtures.
Exterior perimeter lighting is accomplished by wall and pole mounted HID lighting fixtures.
The parking area is illuminated by lighting standards. The main entrance and north entrance
canopies contain recessed soffit lighting fixtures.
The facility does not contain an emergency generator. Exit signs and emergency lights are
provided in the exit paths. Emergency lighting consists of battery packs and remote heads.
The battery packs tested were operable.
There is one (1) “Mircom” fire alarm control unit located by the main entrance. The fire
alarm is serviced by “OFS Fire Prevention” and the last inspection date is June 9th, 2011.
The facility is provided with a security system. The system is manufactured by “GIT
Security” and the main panel is located in an office adjacent to the corridor.
40
Client: City Of Orillia
Project: Preliminary Building Condition Survey Report – Brian Orser Arena, 433 Gill Street, Orillia, Ontario
Project Number: BRM-00063168-B0
Date Issued: May 30th, 2012
41
Client: City Of Orillia
Project: Preliminary Building Condition Survey Report – Brian Orser Arena, 433 Gill Street, Orillia, Ontario
Project Number: BRM-00063168-B0
Date Issued: May 30th, 2012
42
Client: City Of Orillia
Project: Preliminary Building Condition Survey Report – Brian Orser Arena, 433 Gill Street, Orillia, Ontario
Project Number: BRM-00063168-B0
Date Issued: May 30th, 2012
43
Client: City Of Orillia
Project: Preliminary Building Condition Survey Report – Brian Orser Arena, 433 Gill Street, Orillia, Ontario
Project Number: BRM-00063168-B0
Date Issued: May 30th, 2012
44
Client: City Of Orillia
Project: Preliminary Building Condition Survey Report – Brian Orser Arena, 433 Gill Street, Orillia, Ontario
Project Number: BRM-00063168-B0
Date Issued: May 30th, 2012
Photograph 7-10
Based on our visual observations, we expect the main switch to remain serviceable for a few
more years if continually maintained and serviced as part of an ongoing preventative
maintenance program. The main switch is an original installation and due to its age we must
point out that components have deteriorated and replacement should be planned for. As this
is one of the single most important pieces of electrical equipment in the facility,
consideration should be given to replace the unit as it is nearing the end of its expected useful
life.
From our cursory review, most of the distribution equipment within the main electrical room
appears to be from original installation however several disconnect switches appear to have
been replaced within the last several years. The distribution section within the closet of the
newer meeting room addition appears to be from original construction of the addition.
Based on our observations, the distribution equipment appears to be in operable condition
however a majority of the equipment within the main electrical room appears to be
approaching the end of its normal expected service life and consideration should be given for
replacement.
Based on our observations, the lighting fixtures appear to be in operable condition however
they are older T12 type, non-energy efficient type lamps. We recommend upgrading the
lighting with energy efficient bulbs and ballasts.
45
Client: City Of Orillia
Project: Preliminary Building Condition Survey Report – Brian Orser Arena, 433 Gill Street, Orillia, Ontario
Project Number: BRM-00063168-B0
Date Issued: May 30th, 2012
Based on our observations, the emergency battery packs appear to be from a variety of
vintages and manufacturers. The battery packs tested were operable however consideration
should be given to replace the older units within the next several years.
The fire alarm panel and all associated devices throughout the facility appear to be in
operable condition as they are not from original construction and may remain serviceable for
several more years provided they are well maintained and serviced.
46
Client: City Of Orillia
Project: Preliminary Building Condition Survey Report – Brian Orser Arena, 433 Gill Street, Orillia, Ontario
Project Number: BRM-00063168-B0
Date Issued: May 30th, 2012
8. Mechanical Systems
8.1 Description
The major equipment serving the skating rink consists of a refrigeration system which
utilizes one (1) chiller, one (1) evaporative condenser, two (2) compressors and several
pumps.
The chiller is located in the mechanical room and is manufactured by “Henry Technologies”.
Circulation of the refrigerant is accomplished by a circulation pump. The pump is rated at 25
HP and 1775 rpm. According to a site representative, the chiller was replaced in 2002. The
evaporative condenser is located on the rooftop, is manufactured by “BAC” and is a model
VC1-110. Circulation for the evaporative condenser is accomplished by a pump rated at 3
HP and 1800 rpm. According to a site representative the evaporative condenser was replaced
in 2003. The system is provided with two (2) compressors. These two compressors are from
original installation.
The system utilizes ammonia as a refrigerant to chill brine water. The skating surface is
maintained through the use of a series of piping that are found under the ice bearing concrete
slab and are fed from an header in an accessible trench on the east end of the ice arena.
The skating rink contains a refrigerant detection system. The system is manufactured by
“QEL” and contains three sensors located at strategic places with one sensor detecting
Carbon Monoxide, Ammonia or Propane.
Conditioned air serving the meeting room addition is provided by one (1) “Lennox” rooftop
HVAC unit. The unit provides natural gas heating and electric cooling and was replaced
within the last several years. Distribution of conditioned air is accomplished by systems of
ducting and square cone diffusers. Return air is accomplished by air plenum spaces created
by the drop down ceiling tiles. The unit is controlled by a wall mounted thermostat located
within one of the rooms. As most of the ducting is located in the suspended ceiling, the
condition could not be easily assessed.
Heating of the facility corridors, change rooms, and various other common areas is
accomplished by hot water baseboard heaters. Additional heating of the entrances and main
lobby is accomplished by wall mounted electric cabinet heaters. Hot water for the heating
system is accomplished by one (1) “American Standard” boiler located in the mechanical
room adjacent to the domestic heaters. The boiler is a model G-409W and contains a heating
input of 600 MBH.
Heating of the skating rink spectator area is accomplished by two (2) “Solar Ray” radiant
tube heaters suspended from the ceiling. The heaters appear to have been installed within the
last several years.
47
Client: City Of Orillia
Project: Preliminary Building Condition Survey Report – Brian Orser Arena, 433 Gill Street, Orillia, Ontario
Project Number: BRM-00063168-B0
Date Issued: May 30th, 2012
The south side of the skating rink contains an abandoned heating boiler. According to a site
representative, the heating boiler was used to heat the skating rink for figure skating but has
been abandoned for many years.
The skating rink contained two (2) dehumidification units manufactured by “Bassai” and
“Thermoplus Air”. According to a site representative, the “Bassai” unit was taken from
another skating rink and was installed many years ago. The “Thermoplus Air” unit was
reportedly installed several years ago.
There are two (2) exhaust fans located on the east side of the roof. According to a site
representative, one serves the kitchen area and was installed within the last few years while
the second has been abandoned.
Each change room contained a wall mounted exhaust fan which discharges air trough the east
wall. All change room exhaust fans were in operation during our review. Ventilation for the
washrooms in the meeting room addition is accomplished by ceiling mounted exhaust fans.
From our visual review, the washroom exhaust fans were in operation.
Ventilation for the skating rink is provided by one wall mounted exhaust fan on the east side,
and two louvers on the west side. When needed, the exhaust fan will operate and the louvers
will open to bring in fresh air. During our review, this exhaust fan was not in operation.
Water enters the facility in the mechanical room adjacent to the domestic water heaters, is
metered, and then distributed to the various plumbing fixtures throughout the facility.
Domestic hot water heating for the facility is accomplished by two (2) “A.O. Smith” natural
gas fired water heaters located in the mechanical room. The heaters are a model BT270-
860S and have a heating capacity of 270 MBH each. There is also one (1) “GSW” electric
water heater located in a closet in the meeting room addition. This heater is a model
6E2175SC and has a volumetric capacity if 175 Liters.
There is a washroom and shower located within each change room consisting of a
combination of older and newer plumbing fixtures. The main lobby and meeting room
corridor also contained a men’s and ladies washroom. Typical plumbing fixtures include
flush tank water closets, countertop sinks and urinals. Mop service basins are provided
throughout several service rooms. The kitchen contained a stainless steel sink.
Sanitary water is collected and discharged into the sanitary sewer. Storm water collected
from roof drains is discharged to the City storm sewer via a system of storm water pipes but
also to grade level to a drainage swale/ditch along the south side of the site.
The facility is equipped with a fire protection system. According to a site representative,
when fire is detected, a valve is manually opened within the mechanical room which allows
water to reach various fire hose cabinets located throughout the facility and the Siamese
connection on the northeast side of the facility.
48
Client: City Of Orillia
Project: Preliminary Building Condition Survey Report – Brian Orser Arena, 433 Gill Street, Orillia, Ontario
Project Number: BRM-00063168-B0
Date Issued: May 30th, 2012
The kitchen also contains a wet chemical fire suppression system. According to a site
representative, the system was installed within the last few years. The system is
manufactured by “Range Guard” and is located adjacent to the kitchen door.
The facility contains a garbage container which is located on the south side of the faciltiy.
The compactor contains pneumatic connections for lifting.
49
Client: City Of Orillia
Project: Preliminary Building Condition Survey Report – Brian Orser Arena, 433 Gill Street, Orillia, Ontario
Project Number: BRM-00063168-B0
Date Issued: May 30th, 2012
50
Client: City Of Orillia
Project: Preliminary Building Condition Survey Report – Brian Orser Arena, 433 Gill Street, Orillia, Ontario
Project Number: BRM-00063168-B0
Date Issued: May 30th, 2012
A photograph of one
dehumidification unit located on the
northeast side of the skating rink.
Several years old but operational.
51
Client: City Of Orillia
Project: Preliminary Building Condition Survey Report – Brian Orser Arena, 433 Gill Street, Orillia, Ontario
Project Number: BRM-00063168-B0
Date Issued: May 30th, 2012
52
Client: City Of Orillia
Project: Preliminary Building Condition Survey Report – Brian Orser Arena, 433 Gill Street, Orillia, Ontario
Project Number: BRM-00063168-B0
Date Issued: May 30th, 2012
53
Client: City Of Orillia
Project: Preliminary Building Condition Survey Report – Brian Orser Arena, 433 Gill Street, Orillia, Ontario
Project Number: BRM-00063168-B0
Date Issued: May 30th, 2012
55
Client: City Of Orillia
Project: Preliminary Building Condition Survey Report – Brian Orser Arena, 433 Gill Street, Orillia, Ontario
Project Number: BRM-00063168-B0
Date Issued: May 30th, 2012
The various pumps such as the evaporative condenser and chiller pumps appear to be in
operable condition. It is uncertain how long ago these pumps were installed however we
expect them to remain serviceable for several more years provided they are well maintained
and serviced. We recommend refurbishment and/or replacement of these pumps be planned
for in the next several years. Most of the refrigerant system piping within the mechanical
room was insulated during our review. Furthermore, the piping within the ice bearing
concrete slab was fully concealed and was not assessed. Due to the age of the facility, we
recommend refurbishment and/or replacement of piping within the mechanical room. Also,
we recommend refurbishment and/or replacement of the piping within the ice bearing
concrete slab and header and supply components. This can be done in conjunction with the
concrete slab rehabilitation.
According to a site representative, the refrigerant detection system has been installed many
years ago. Based on our visual observations, the refrigerant detection system appears to be
approaching the end of its normal expected service life and we recommend replacement of
the system.
The rooftop HVAC unit appears to be in operable condition and may remain serviceable for
many more years provided it is well maintained and serviced. HVAC units of this type have
an expected useful life of 20 years therefore eventual replacement will be needed in the long
term forecast.
With regards to the heating system, the hot water radiators appear to be from original
installation however some piping may not be from original installation. The units may
remain serviceable for several more years however they are approaching the end of their
normal expected service life and consideration should be given for replacement. The heating
boiler serving the radiators is from original installation and has exceeded its normal expected
service life. Consideration should be given for replacement and according to a site
representative; the boiler is being replaced within the next year.
The heating system distribution piping consists of insulated piping and fittings. Expected
service life of heating system piping is in the order of 35 to 40 years. Due to the age of the
facility, we recommend refurbishment and/or replacement of the piping in the future.
56
Client: City Of Orillia
Project: Preliminary Building Condition Survey Report – Brian Orser Arena, 433 Gill Street, Orillia, Ontario
Project Number: BRM-00063168-B0
Date Issued: May 30th, 2012
Since the dehumidification units were located well above ground level, a full assessment was
not completed. However, according to information provided the “Bassai” unit is no longer
functional and despite the other unit may be sufficient consideration should be given for
replacement. The “Thermoplus Air” unit appears to be in operable condition and may remain
serviceable for several more years.
Based on our observations, the newly installed kitchen exhaust fan on the roof is in operable
condition. We recommend removing the decommissioned and abandoned exhaust fan.
The change room exhaust fans are in operable condition however considering the age of the
exhaust fans, it is recommended that full replacement be undertaken in the near future.
Based on our visual observations, there is no proper makeup air introduction to the main
washrooms, change rooms and various other common areas. We recommend that fresh air
requirements be brought up to present day standards.
From our visual review, the domestic water heaters within the mechanical room were
installed many years ago and consideration should be given for replacement. According to a
site representative, the heaters will be replaced within the next year. Based on our cursory
observations; the plumbing fixtures in the facility generally appear to be old and several
fixtures were chipped and/cracked. We recommend refurbishment of all fixtures which can
be done in conjunction with the renovations of the change rooms.
As a portion of the domestic hot and cold piping is concealed within the walls and ceiling,
the condition of all piping could not be assessed. Based on our observations, the piping
appears to be in operable condition. Expected service life of domestic piping is in the order
of 35 to 40 years. Due to the age of the facility, we recommend refurbishment and/or
replacement of the piping in the future.
Based on our observations, the storm and sanitary systems appear to be in operable condition
however due to the age of the facility, we recommend refurbishment and/or replacement of
piping in the future. As a minimum they should be reviewed by remote inspection to ensure
they are satisfactory. We noted a man hole at the northeast end of the property that appeared
to be full of water. We recommend further investigation to determine the problem.
Based on our observations, the sprinkler system consisting of piping, fire hose cabinets and
Siamese connection, appear to be in satisfactory condition. It is uncertain whether this fire
suppression system is in accordance with all codes and standards therefore we recommend
investigating whether the system should be upgraded.
The wet chemical fire suppression system located within the kitchen appears to be in
operable condition and may remain serviceable for several more years provided it is well
maintained and serviced.
According to a site representative, the garbage container was recently installed within the last
few years. Based on our observations, the garbage container is in operable condition and
may remain serviceable for several more years provided it is well maintained and serviced.
57
Client: City Of Orillia
Project: Preliminary Building Condition Survey Report – Brian Orser Arena, 433 Gill Street, Orillia, Ontario
Project Number: BRM-00063168-B0
Date Issued: May 30th, 2012
During our site visit we noted that sections of the pipe insulation are suspected to contain
asbestos. All suspect materials should be sampled and tested as part of a designated
substance survey that should be completed. We recommend that hazardous materials be
sample tested, removed, handled and/or managed in accordance with all governing
regulations.
58
Client: City Of Orillia
Project: Preliminary Building Condition Survey Report – Brian Orser Arena, 433 Gill Street, Orillia, Ontario
Project Number: BRM-00063168-B0
Date Issued: May 30th, 2012
Asphalt paved driveways are generally present along the perimeter of the building. Asphalt
paved surface parking areas are present at the front (east) end of the site. Cast-in-place
concrete curbs are present along portions of the perimeter of the asphalt pavements present
on the property, particularly at the main entrance, at the north end of the building (basketball
court areas) and along the front of building around the unit pavers. Unit paver walkways are
present along the east end of the building. Limited metal chain-link fencing is present along
some of the property limits. Limited landscaping consisting primarily of sod areas with trees
is also present on the property.
The fieldwork comprised a visual cursory survey. No probeholes were drilled at this time
and a complete set of drawings with regard to the pavement design and/or requirements were
not made available for our review.
The following lists some typical examples of deficiencies and/or deterioration which we
noted during our site review with regard to the pavements and exterior site features. These
examples are not intended to be a complete listing of all the areas affected, but rather to
provide an indication as to the types of deficiencies and/or conditions present on site.
59
Client: City Of Orillia
Project: Preliminary Building Condition Survey Report – Brian Orser Arena, 433 Gill Street, Orillia, Ontario
Project Number: BRM-00063168-B0
Date Issued: May 30th, 2012
60
Client: City Of Orillia
Project: Preliminary Building Condition Survey Report – Brian Orser Arena, 433 Gill Street, Orillia, Ontario
Project Number: BRM-00063168-B0
Date Issued: May 30th, 2012
61
Client: City Of Orillia
Project: Preliminary Building Condition Survey Report – Brian Orser Arena, 433 Gill Street, Orillia, Ontario
Project Number: BRM-00063168-B0
Date Issued: May 30th, 2012
62
Client: City Of Orillia
Project: Preliminary Building Condition Survey Report – Brian Orser Arena, 433 Gill Street, Orillia, Ontario
Project Number: BRM-00063168-B0
Date Issued: May 30th, 2012
The normal service life of asphalt pavement is in the order of 15 to 20 years. The exact age
of the asphalt pavements present on the property is unconfirmed at this time, however based
on our visual observations major rehabilitation of the asphalt pavements should be carried out
in the near future. Many areas of deterioration in the form of cracking, pot holes, poorly
patched trenches and mild settlement were noted within the asphalt pavements. In addition,
as evident by water ponding at several locations, storm-water runoff drainage of the asphalt
pavements appears to be inadequate at this time. As part of the major rehabilitation of the
asphalt pavements, a proper drainage plan of the asphalt pavements should be developed.
This plan should be carried out to ensure the asphalt pavements are adequately sloped to
drain as well as to ensure there are a sufficient amount of storm sewers to facilitate proper
drainage of the asphalt pavements present on the property. Furthermore, our visual review
of the asphalt pavements revealed possible failure/deterioration of the sub-grade material
present along the north end of the building, as mentioned in the body of the report. Localized
sub-grade repairs to the asphalt pavements should be carried out in conjunction with the
major rehabilitation of the asphalt pavements. Furthermore, the man-hole located at the
northeast corner of the property should be further reviewed and any issues properly addressed
as may be required.
Other repairs to the pavements and exterior site features include localized repairs to
deteriorated sections of concrete curbs, refurbishment of damaged sections of metal chain-
link fencing, properly addressing the all shifted/displaced unit pavers as well as
refurbishment of the basketball hoops/goals.
63
Client: City Of Orillia
Project: Preliminary Building Condition Survey Report – Brian Orser Arena, 433 Gill Street, Orillia, Ontario
Project Number: BRM-00063168-B0
Date Issued: May 30th, 2012
The following schedule is an opinion of probable costs for the repair, restoration, and
replacement of the capital items discussed herein. The probable cost values herein have been
arrived at by determining a representative quantity where possible from the visual
observations made at the time of the condition survey and applying current, retail market-
value unit costs to the given quantity. The costs have not been adjusted annually to include
for inflation or other cost increases. In addition, costs related to design modifications to
match the architectural design features for future use would be subject to adjustments based
on the actual design.
The requirements for the rehabilitation and repairs outlined below will be driven by the
owners and/or future occupant needs and use of the building. This work recommended may
not be all that is required depending on the intended use of the facility and the desired level
of serviceability desired by the owner and/or future occupancy. In addition, to the
refurbishment of the main building elements described herein, refurbishment of the interior
finishes to suit the intended future use and well as refurbishment, modification and upgrades
to the exterior site features immediately surrounding the facility would be required to match
the intended future use.
We would recommend that the cost estimates provided herein be reviewed by a professional
cost consultant to help ensure budgets match the actual planed projects.
64
Client: City Of Orillia
Project: Preliminary Building Condition Survey Report – Brian Orser Arena, 433 Gill Street, Orillia, Ontario
Project Number: BRM-00063168-B0
Date Issued: May 30th, 2012
65
Client: City Of Orillia
Project: Preliminary Building Condition Survey Report – Brian Orser Arena, 433 Gill Street, Orillia, Ontario
Project Number: BRM-00063168-B0
Date Issued: May 30th, 2012
66
Client: City Of Orillia
Project: Preliminary Building Condition Survey Report – Brian Orser Arena, 433 Gill Street, Orillia, Ontario
Project Number: BRM-00063168-B0
Date Issued: May 30th, 2012
67
Client: City Of Orillia
Project: Preliminary Building Condition Survey Report – Brian Orser Arena, 433 Gill Street, Orillia, Ontario
Project Number: BRM-00063168-B0
Date Issued: May 30th, 2012
68
Client: City Of Orillia
Project: Preliminary Building Condition Survey Report – Brian Orser Arena, 433 Gill Street, Orillia, Ontario
Project Number: BRM-00063168-B0
Date Issued: May 30th, 2012
We have allowed for an extra 25% for Consulting and Design Fees, Testing $281,250 $223,750 $167,500
and Inspection, Permits, Contingency, Interior Furnishings, Operations
Equipment and/or Other Miscellaneous Project Costs
Grand Totals $1,406,250 $1,118,750 $837,500
Other Options
Major Renovation - Arena Common Areas/Multi-Purpose Space
An estimated minimal allowance for complete demolition of existing arena common area
$2,900,000
and multi-purpose space and reconstruction of modern common areas/multi-purpose space
adjacent to the existing single pad arena to remain. Allowance for approximately up to
10,000 square feet.
69
Client: City Of Orillia
Project: Preliminary Building Condition Survey Report – Brian Orser Arena, 433 Gill Street, Orillia, Ontario
Project Number: BRM-00063168-B0
Date Issued: May 30th, 2012
11. Limitation
The information presented in this report provides an assessment of the current conditions at
the site, within the terms of reference and limitations outlined in section 1. We have been
asked to make recommendations and opinions based solely on a visual sampling of existing
components. Test cuts, coring, design review, quantity surveys, destructive testing, or
instrument testing was not carried out. Consequently, further investigation or additional
testing may change our current recommendations and opinions.
This building condition survey report was prepared by exp for the exclusive use of the City
of Orillia and may not be reproduced in whole or in part, without the prior written consent of
exp, or used or relied upon in whole or in part by a party other than the City of Orillia.
Any use which a third party makes of this report, or any reliance on or decision made based
upon it, are the sole responsibility of such third party and exp accepts no responsibility of any
damages of any kind or nature whatsoever, suffered by any third party as a result of decisions
made or actions based upon this report.
In order to achieve the objectives outlined in Section 1.1 we arrived at conclusions based
upon the best information presently known to us. No investigative method can completely
eliminate the possibility of obtaining partially imprecise or incomplete information; it can
only reduce the possibility to an acceptable level. Professional judgment was exercised in
gathering and analyzing the information obtained and in the formulation of the conclusions.
Like all professional persons rendering advice, we do not act as absolute insurers of the
conclusions we reach, but we commit ourselves to care and competence in reaching those
conclusions.
exp Services Inc.
70
Client: City Of Orillia
Project: Preliminary Building Condition Survey Report – Brian Orser Arena, 433 Gill Street, Orillia, Ontario
Project Number: BRM-00063168-B0
Date Issued: May 30th, 2012
Appendix A:
Executive Summary Report
1
Client: City Of Orillia
Project: Preliminary Building Condition Survey Report – Brian Orser Arena, 433 Gill Street, Orillia, Ontario
Project Number: BRM-00063168-B0
Date Issued: May 30th, 2012
1
Client: City Of Orillia
Project: Preliminary Building Condition Survey Report – Brian Orser Arena, 433 Gill Street, Orillia, Ontario
Project Number: BRM-00063168-B0
Date Issued: May 30th, 2012
exp Services Inc. (exp) has completed a Preliminary Building Condition Survey Report for
the site known as the Brian Orser Arena which opened in 1974 (38 years old) located at
433 Gill Street, Orillia, Ontario.
The information presented in this executive summary report provides a general overall
assessment of the current condition of the building and operating systems, based on our
proposal and within the terms of reference as well as limitations outlined herein. In this
report we have provided some typical examples of deficiencies and/or deterioration which we
noted during our site review. These examples are not intended to be a complete listing of all
the areas affected, but rather to provide an indication as to the types of deficiencies and/or
conditions present on site.
We have been asked to make recommendations and opinions based solely on a visual
sampling of existing components. Test cuts, coring, design review, quantity surveys,
destructive testing, or instrument testing was not carried out. Consequently, further
investigation or additional testing may change our current recommendations and opinions.
Roofing Systems
The roofing systems of the building are comprised of a sloped standing seam metal roof over
the ice rink area and ‘flat’ roof areas at the lower roof areas present at the front of the
building and over the newer meeting room addition. The lower ‘flat’ roof areas are
constructed using a “Conventional Built-up Membrane Roof Assembly”.
The normal life expectancy of a conventional built-up roofing system, assuming proper
original installation, as well as adequate annual maintenance and repairs, is approximately 18
to 20 years. Based on our limited visual observations, we would anticipate some
repairs/replacement be carried out to the roofing system within the next five (5) years. This
work will generally include but not limited to properly rectifying all roof deficiencies noted
at the time of our site visit, as aforementioned. Furthermore, this allowance includes removal
and replacement of the older ‘flat’ roof area present at the south end of the building (i.e. at
evaporative condenser area). It is difficult to ascertain the effective remaining life of the
roofing system without properly reviewing the concealed components of the roofing system
(i.e. waterproofing membrane and insulation) as well as the topside of the roof deck. The
extent of any wet roofing insulation is unknown at this time. Furthermore, the condition of
the structural roof deck on the topside and concealed areas is unknown at this time. It should
be noted that, with time, any moisture present within the roofing membrane and insulation
typically results in deterioration of the structural deck.
The sloped metal roof should remain serviceable for many more years. Some attention is
required, such as properly addressing all damaged roof drainage components (i.e. metal
eavestroughs and downspouts/downspout protective barriers) including potentially complete
removal and replacement. In addition corroded metal fasteners and other maintenance
2
Client: City Of Orillia
Project: Preliminary Building Condition Survey Report – Brian Orser Arena, 433 Gill Street, Orillia, Ontario
Project Number: BRM-00063168-B0
Date Issued: May 30th, 2012
repairs can be carried out as part of this work. The layout of the downspouts should also be
reviewed to help minimize the need for draining of the upper sloped roof down to the lower
flat roof areas. Eavestroughs should also be properly sized.
Exterior Walls
The building is predominantly clad with a combination of plain block masonry and
prefinished metal siding. Areas of ribbed-face block masonry also form part of the exterior
cladding of the building. Exterior sealant is generally present around the doorway perimeters
as well as at joints between dissimilar cladding materials.
Overall, these wall systems were found to be aged but generally in serviceable condition at
this time, with the exception of localized areas of damage and deterioration. These wall
systems are expected to last the life of the useful lifetime of the building, however some
repairs are periodically required. Based on our visual observations, some immediate repairs
to the exterior block masonry and metal siding is required and should be carried out in the
near future. In general, this work should include repairs to all areas of damage at the exterior
metal siding as well as exterior block masonry. Exterior work should also include
refurbishment of the wood soffits. We recommend that repairs be carried out as a
preventative measure against further and more serious deterioration, address water
penetration problems as well as to maintain the overall appearance of the building.
Additional long term repairs to the exterior wall systems of the building should also be
expected.
The normal expected service life of good quality exterior sealants is in the order of 13 to 15
years. Based on our visual observations, the removal and replacement of all deteriorated
exterior sealants should be carried out. Exterior sealant should also be provided where
missing.
The exterior doorways of the building generally consist of commercial grade metal framed
metal (hollow core) swing doors set in metal frames. Some of the entrance doorways contain
glass inserts (i.e. main entrance and north end entrance doorways). Metal overhead garage
doorways are also present at the building.
Based on our visual observations, the majority of the exterior doorways present at the
building are in fair to poor condition at this time. Some doorways are visibly
deformed/damaged and do not engage properly. Furthermore, many areas of
weathered/deteriorated weather-stripping were noted along the perimeter of these doorways.
Based on our visual observations, major refurbishment of the exterior doorways should be
carried out in the near future. In general, this work should include removal and replacement
of all deformed/damaged doorways, cleaning, priming and repainting all areas of surface
corrosion with a corrosion resistant coating, as well as the removal and replacement of all
deteriorated weather-stripping. With exception of areas of damage/dents, the overhead
doorways present at the building are in serviceable condition at this time. Replacement of
3
Client: City Of Orillia
Project: Preliminary Building Condition Survey Report – Brian Orser Arena, 433 Gill Street, Orillia, Ontario
Project Number: BRM-00063168-B0
Date Issued: May 30th, 2012
these doorways should not be required in the near future. However, replacement and/or
refurbishment of these overhead doors will be required as they approach the end of their
normal expected service life.
Structural Components
The structural framing of the ice rink consists of a prefabricated system comprised of large
prefabricated girders which span the entire width of the ice rink area in a north to south
direction. Although not visible due to the installation of insulation blankets on the underside,
the sloped metal roof of the ice rink is likely supported on steel purlins which also provide
lateral support for the girders. The girders are supported by tapered steel columns at the side
of the building. Metal rod cross bracing is present and visible below the insulation blankets
on the underside of the roof at alternating bays.
The structural framing of the ‘flat’ roof area portions of the building is comprised of a
corrugated metal roof deck supported on either steel beams on the older original lower roof
portions or open-web steel joists on the newer addition. In both cases, the steel beams or
open-web steel joists are supported on load-bearing block masonry walls.
The exposed portions of the foundation walls of the building consist of concrete block
masonry. The foundations below are cast-in-place concrete.
Based on our visual observations, refurbishment and repairs to some of the structural
components of the building is required at this time. In general, this work should include
properly cleaning, priming and repainting all areas of surface corrosion on the exposed
structural steel framework of the building with a corrosion resistant coating both on the
interior as well as exterior. Also, this work includes repairs to the exterior foundation walls
of the building, repairs to all areas of cracking present within the interior block masonry
walls as well as repairs to all areas of cracking and surface delaminations present within the
exposed floor slab located within the building. However, a further more detailed review
should be carried out (particularly with ice rink floor slab) to determine the full scope and
costs of any rehabilitation activities required. In addition, based on the age of the ice rink
floor slab, major rehabilitation of the ice rink floor slab should be anticipated, particularly
this rehabilitation work should be carried out in conjunction with the refurbishment of the
refrigeration system. We have provided a minimal allowance for this work.
The building is generally comprised of an ice rink, six (6) team change rooms, a referee’s
room, a main lobby/viewing area, a snack bar, men’s and women’s washrooms, two (2)
meeting rooms, three additional washrooms as well as various small storage/miscellaneous
rooms. Based on the ground floor plan drawing provided, the ice rink surface is 85 feet in
width and 185 feet in length.
The floor finishes throughout the building predominantly consist of a combination of rubber
flooring and vinyl flooring with localized areas of carpeting. The wall finishes generally
4
Client: City Of Orillia
Project: Preliminary Building Condition Survey Report – Brian Orser Arena, 433 Gill Street, Orillia, Ontario
Project Number: BRM-00063168-B0
Date Issued: May 30th, 2012
consist of painted block masonry with areas of painted gypsum board. The ceiling finishes
are generally comprised of exposed painted metal roof deck as well as suspended acoustic
ceiling tiles in the meeting rooms.
Although the majority of the interior finishes within the building can be considered
serviceable at this time, the majority of the interior spaces including but not limited to the
team change rooms, older/original washrooms as well as the referee change room are
undersized and are not to current/modern facility standards. Extensive demolition and
restoration work would be required to update these interior spaces to current/modern facility
standards. This work may include but not limited to improved layout for achieving a higher
level of efficiency based on space usage, installation of additional as well as comfortable
seating for spectators, modernization of the team change rooms (i.e. lockers, expanded more
private washrooms) as well as addressing overall handicap accessibility within the facility.
The budget numbers included in this report have assumed the complete demolition of all
current interior fit-outs, the restoration of new, updated building systems, and a new fit-out of
all interior spaces. Also included is the complete re-work of the older/original base building
washrooms both in terms of barrier-free compliance, energy efficient fixtures, and finishes.
This is a pure mathematical analysis based on the building area provided and has been
considered an upgrade capital expenditure in the cost table presented. Consideration may be
given to minimizing the environmental impact of the facility and ensuring the facility is as
self-sustainable as possible, which all have cost implications. There are many other factors
that will affect the ultimate costs depending on the final design and intended use of the
facility.
Electrical Systems
Mechanical Systems
In our opinion, the mechanical systems in this facility have been adequately maintained in the
past years. In general, a majority of the equipment in the facility appears to be approaching
or is beyond its normal expected service life. There still exists equipment from original
installation and in the future the equipment may not be relied upon to provide dependable
service. Due to the age of facility (38 years old), replacement of some mechanical
components as well as several corrective measures as outlined in the report should be carried
out in the near future.
5
Client: City Of Orillia
Project: Preliminary Building Condition Survey Report – Brian Orser Arena, 433 Gill Street, Orillia, Ontario
Project Number: BRM-00063168-B0
Date Issued: May 30th, 2012
In addition to the above we have presented a budget for complete refurbishment of the
mechanical systems, piping and equipment that is in need of replacement.
Asphalt paved driveways are generally present along the perimeter of the building. Asphalt
paved surface parking areas are present at the front (east) end of the site. Cast-in-place
concrete curbs are present along portions of the perimeter of the asphalt pavements present
on the property, particularly at the main entrance, at the north end of the building (basketball
court areas) and along the front of building around the unit pavers. Unit paver walkways are
present along the east end of the building. Limited metal chain-link fencing is present along
some of the property limits. Limited landscaping consisting primarily of sod areas with trees
is also present on the property.
The normal service life of asphalt pavement is in the order of 15 to 20 years. The exact age
of the asphalt pavements present on the property is unconfirmed at this time, however based
on our visual observations major rehabilitation of the asphalt pavements should be carried out
in the near future. Many areas of deterioration in the form of cracking, pot holes, poorly
patched trenches and mild settlement were noted within the asphalt pavements. In addition,
as evident by water ponding at several locations, storm-water runoff drainage of the asphalt
pavements appears to be inadequate at this time. As part of the major rehabilitation of the
asphalt pavements, a proper drainage plan of the asphalt pavements should be developed.
This plan should be carried out to ensure the asphalt pavements are adequately sloped to
drain as well as to ensure there are a sufficient amount of storm sewers to facilitate proper
drainage of the asphalt pavements present on the property. Furthermore, our visual review
of the asphalt pavements revealed possible failure/deterioration of the sub-grade material
present along the north end of the building, as mentioned in the body of the report. Localized
sub-grade repairs to the asphalt pavements should be carried out in conjunction with the
major rehabilitation of the asphalt pavements. Furthermore, the man-hole located at the
northeast corner of the property should be further reviewed and any issues properly addressed
as may be required.
Opinion of Budget Repair/Replacement Cost Estimates
In general, the building appears to be in a state where some capital type renewal activities as
well as regular maintenance actions have helped maintain this ageing facility in functional
condition. The building has been constructed in essentially two phases for purpose type
usage as a municipal ice skating facility with some meeting room space. Our assessment did
not reveal evidence of extensive structural failure, however it did reveal areas of extensive
deterioration as well as aged building systems and components. As the building is ageing,
the findings of the report present a snap shot summary at the time of our visit. It is possible
that further more serious deterioration may occur and progress quickly.
The following schedule is an opinion of probable costs for the repair, restoration, and
replacement of the capital items discussed herein. The probable cost values herein have been
arrived at by determining a representative quantity where possible from the visual
6
Client: City Of Orillia
Project: Preliminary Building Condition Survey Report – Brian Orser Arena, 433 Gill Street, Orillia, Ontario
Project Number: BRM-00063168-B0
Date Issued: May 30th, 2012
observations made at the time of the condition survey and applying current, retail market-
value unit costs to the given quantity. The costs have not been adjusted annually to include
for inflation or other cost increases. In addition, costs related to design modifications to
match the architectural design features for future use would be subject to adjustments based
on the actual design.
The requirements for the rehabilitation and repairs outlined below will be driven by the
owners and/or future occupant needs and use of the building. This work recommended may
not be all that is required depending on the intended use of the facility and the desired level
of serviceability desired by the owner and/or future occupancy. In addition, to the
refurbishment of the main building elements described herein, refurbishment of the interior
finishes to suit the intended future use and well as refurbishment, modification and upgrades
to the exterior site features immediately surrounding the facility would be required to match
the intended future use.
7
Client: City Of Orillia
Project: Preliminary Building Condition Survey Report – Brian Orser Arena, 433 Gill Street, Orillia, Ontario
Project Number: BRM-00063168-B0
Date Issued: May 30th, 2012
Item Brian Orser Arena – 433 Gill Street, Orillia Short-Term Capital Longer-Term
Building Element Capital Expenditure Summary Work (<5 years) Capital Work
plus (10-15 years)
Facility Upgrades (in 2012 $’s)
(in 2012 $’s)
2.0 Roofing Systems
Sub-Totals $85,000 $20,000
3.0 Exterior Walls
Sub-Totals $85,000 $50,000
4.0 Exterior Windows and Doors
Sub-Totals $30,000 $20,000
5.0 Structural Components
Sub-Totals $150,000 $300,000
6.0 Interior Building Components
Sub-Totals $725,000
7.0 Electrical Systems
Sub-Totals $160,000 $90,000
8.0 Mechanical Systems
Sub-Totals $270,000 $415,000
9.0 Pavements and Exterior Site Features
Sub-Totals $290,000
Opinion of Capital Budget Cost Estimate Sub-Totals $1,795,000 $895,000
We have allowed for an extra 25% for Consulting and Design $448,750 $223,750
Fees, Testing and Inspection, Permits, Contingency, Interior
Furnishings, Operations Equipment and/or Other Miscellaneous
Project Costs
Grand Totals $2,243,750 $1,118,750
Other Options
Major Renovation - Arena Common Areas/Multi-Purpose Space
An estimated minimal allowance for complete demolition of existing arena
$2,900,000
common area and multi-purpose space and reconstruction of modern common
areas/multi-purpose space adjacent to the existing single pad arena to remain.
Allowance for approximately up to 10,000 square feet.