1.

M
o
Project Name: d
Checklist No. ………… e
l
Make: Checklist :
for Equipment Hired
Inspec on
Contractor
Project Code: Date:

Equipment Name &


Number:

Note: Please write Yes or No in the given box and if some comments write in remarks column.
Descrip on Yes/No Remarks

Physical condi on of compressor tank should be good #


and cer fied by TPI.
Piston should be in good condi on. #

● Motor should be in good and working condi on. #

Inspec on date and due date should be clearly #


marked.
Pressure gauge should be in working state and free #
from defects.
Safety valve should be calibrated at regular interval. #

Any other valve should be free from defects and in #


working condi on.
Rota ng part should be covered with fixed guard. #

All joints should be properly ghten. #

Compressor should be grounded as per IS 3043:1987. #

Power cable should be free from defects and #


connec on taken through industrial plug.

Whip arrestor is in good condi on. #

FIT PARTIALLY FIT UNFIT


Inspected By Reviewed By
Name: SOUMITRI JHALLI Name:
Signature with date: Signature with date:
'