MOVILIZACION 254,000.

00
INCIDENCIA UND COSTO
OFICINAS 100% 3.00 8,000.00 24,000.00
ALMACEN 100% 2.00 8,000.00 16,000.00
CASETA 50% 1.00 8,000.00 4,000.00
VESTUARIOS 50% 3.00 8,000.00 12,000.00
COMEDOR 100% 1.00 8,000.00 8,000.00
DUCHAS 10% 1.00 8,000.00 800.00
STAFF H 10% 1.00 8,000.00 800.00
STAFF M 10% 1.00 8,000.00 800.00
OBREROS 10% 1.00 8,000.00 800.00
URINARIOS 10% 1.00 8,000.00 800.00
GRUPO ELECT 100% 1.00 8,000.00 8,000.00
COMBUSTIBLE 0% 3.00 8,000.00 -
TABLEROS 20% 4.00 8,000.00 6,400.00
CABLE 10% 1.00 8,000.00 800.00
MO 0% 8,000.00 -
BOMBA 10% 1.00 8,000.00 800.00
TANQUE 25% 5.00 8,000.00 10,000.00
CISTERNA 0% 8,000.00 -
RED AGUA 0% 8,000.00 -
RED DESAGUE 0% 8,000.00 -
MO 0% 8,000.00 -
MAQUINARIA EXC 100% 3.00 8,000.00 24,000.00
ENCOFRADO 100% 5.00 8,000.00 40,000.00
CONCRETO 100% 5.00 8,000.00 40,000.00
LADRILLO TECHO 50% 10.00 8,000.00 40,000.00
ANDAMIOS NORMADOS 100% 2.00 8,000.00 16,000.00

OFICINAS 21,700.00
UND TIEMPO COSTO
OFICINAS 4.00 3.50 1,000.00 14,000.00
ALMACEN 2.00 3.50 850.00 5,950.00
CASETA 1.00 3.50 500.00 1,750.00

VESTUARIOS 10,500.00
UND TIEMPO COSTO
VESTUARIOS 2.00 1.00 500.00 1,000.00
DUCHAS 8.00 1.00 500.00 4,000.00
lavatorio 10.00 1.00 350.00 3,500.00
COMEDOR 2.00 1.00 1,000.00 2,000.00

SERVICIOS HIGIENICOS UND TIEMPO COSTO 10,900.00


STAFF H 2.00 1.00 800.00 1,600.00
STAFF M 1.00 1.00 800.00 800.00
OBREROS 10.00 1.00 500.00 5,000.00
URINARIOS 10.00 1.00 350.00 3,500.00

ENERGIA ELECTRICA 105,912.00


UND TIEMPO COSTO
GRUPO ELECTRO 1.00 3.00 12,000.00 36,000.00
COMBUSTIBLE 1,500.00 3.00 10.00 45,000.00
TABLEROS 6.00 1.00 1,500.00 9,000.00
CABLE 10.00 1.00 900.00 9,000.00
MO 128.00 3.00 18.00 6,912.00

AGUA POTABLE 40,312.00


UND TIEMPO COSTO
BOMBA 5.00 1.00 1,000.00 5,000.00
TANQUE 5.00 1.00 2,000.00 10,000.00
CISTERNA 12.00 3.00 400.00 14,400.00
RED AGUA 1.00 1.00 2,000.00 2,000.00
RED DESAGUE 1.00 1.00 2,000.00 2,000.00
MO 128.00 3.00 18.00 6,912.00

TRANSPORTE V + H 90,720.00
UND TIEMPO COSTO
VERTI 960.00 3.00 18.00 51,840.00
HORIZ 720.00 3.00 18.00 38,880.00

TRAZO ORDEN MES 20,500.00


82,000.00 4.00 20,500.00

LIMPIEZA PERM 9,140.00


UND TIEMPO COSTO
LIMP 480.00 1.00 18.00 8,640.00
MATERIA 1.00 1.00 500.00 500.00

LIMPIEZA FINAL 23,100.00


UND TIEMPO COSTO
LIMP 1,200.00 1.00 18.00 21,600.00
MATERIA 1.00 1.00 1,500.00 1,500.00
SEÑALIZACION SEGURIDAD 12,000.00
UND TIEMPO COSTO
SEÑAL 1.00 2.00 6,000.00 12,000.00

IMPLEMENTACION SEG 60,600.00


UND TIEMPO COSTO
EPPS STAFF 8.00 2.00 350.00 5,600.00
EPPS OBRERO 100.00 2.00 200.00 40,000.00
EPPPS ESPEC 50.00 2.00 150.00 15,000.00

Partida 02.07 ACARREO DE MATERIAL EXCEDENTE CON MAQUINA


Código Descripción Insumo Unidad Cuadrilla Cantidad
Mano de Obra
00 00009 CAPATAZ H-H 0.100 0.0024
00 00127 OPERADOR DE EQUIPO PESADO H-H 2.000 0.0486

Equipo
00 01127 (Servicio) SC ALQUILER DE CAMION 20M h-m 1.000 0.0243
00 01122 (Servicio) SC ALQUILER DE CARGADOR h-m 1.000 0.0243
37 00008 HERRAMIENTAS MANUALES %MO 2.0000

Partida 02.09 ELIMINACION MATERIAL EXCEDENTE PROVENIENTE DE EXCAVACION


Código Descripción Insumo Unidad Cuadrilla Cantidad
Mano de Obra
00 00009 CAPATAZ H-H 0.200 0.0080
00 00127 OPERADOR DE EQUIPO PESADO H-H 3.000 0.1200

Equipo
00 01127 (Servicio) SC ALQUILER DE CAMION 20M h-m 2.000 0.0800
00 01122 (Servicio) SC ALQUILER DE CARGADOR h-m 1.000 0.0400
37 00008 HERRAMIENTAS MANUALES %MO 5.0000

LIMPIEZA DE CONCRETO

5.00 SOLES

OTROS
PLAN COVID 79,950.00
UND TIEMPO COSTO
-
pruebas covid 150.00 1.00 100.00 15,000.00
enfermera 2.00 3.00 3,500.00 21,000.00
alcohol 20.00 12.00 15.00 3,600.00
mascarillas 150.00 180.00 0.25 6,750.00
lavamano 4.00 1.00 1,500.00 6,000.00
jabon 20.00 12.00 5.00 1,200.00
lejia 20.00 12.00 5.00 1,200.00
trap 150.00 12.00 5.00 9,000.00
banners 10.00 3.00 60.00 1,800.00
bandeja 4.00 2.00 80.00 640.00
termometro 2.00 1.00 300.00 600.00
oximetro 2.00 1.00 100.00 200.00
limpieza desinfect 480.00 1.50 18.00 12,960.00

TOPICO Y ESTACIONES DE EMERGENCIA 5,800.00


UND TIEMPO COSTO
TOPICO 2.00 3.00 500.00 3,000.00
ESTACION EMERGENCIA 4.00 2.00 350.00 2,800.00

PARARAYOS 10,000.00
UND TIEMPO COSTO
PARARRAYO 1.00 2.00 5,000.00 10,000.00

SISTEMA DE CAMARAS DE CINCO PUNTOS 11,000.00


UND TIEMPO COSTO
SISTEMA 1.00 2.00 4,000.00 8,000.00
INSTALACION 1.00 1.00 3,000.00 3,000.00

AMBIENTES PARA MATERIALES PELIGROSOS E HIDROCARBUROS 7,500.00


UND TIEMPO COSTO
MATERIALES PELIGROS METALICO 1.00 1.00 3,500.00 3,500.00
HIDROCARBUROS METALICO 1.00 1.00 4,000.00 4,000.00

CERCO PERIMÉTRICO
PROTECCIONES COLECTIVAS 68,890.00
UND TIEMPO COSTO
CINTA SEGURIDAD 40.00 12.00 45.00 21,600.00
MALLA SEGURIDAD 30.00 12.00 40.00 14,400.00
POSTES SEÑALIZACION 150.00 1.00 15.00 2,250.00
ALARMA AUDIBLE CON PULSADOR 4.00 1.00 60.00 240.00
LINEA DE VIDA CABLE ACERADO 20.00 1.00 80.00 1,600.00
PUENTE METALICO PARA ZANJAS 8.00 1.00 600.00 4,800.00
ESCALINATA METALICA ESCAPE 10.00 1.00 300.00 3,000.00
PARANTES ACERO PERIMETROS 600.00 1.00 15.00 9,000.00
SOLERA HORIZONTAL PERIMETRO 1,200.00 1/3 30.00 12,000.00

ANDAMIOS NORMADOS 135,000.00


UND TIEMPO COSTO
ANDAMIOS 15.00 3.00 3,000.00 135,000.00

VIATICOS DE PERSONAL 135,000.00


UND TIEMPO COSTO
PERSONAL 50.00 3.00 500.00 75,000.00
STAFF 10.00 3.00 2,000.00 60,000.00

VIGILANCIA 24H 9,000.00


UND TIEMPO COSTO
SERVICIO 1.00 1.00 9,000.00 9,000.00 POR MES
por mes
por mes

por mes
Rend: 329.0000 M3/DIA
Precio Parcial

25.00 0.06
22.85 1.11
1.17

150.00 3.65
391.60 9.52
1.17 0.02
13.19
Costo Unitario por M3 : 14.36

Rend: 200.0000 m3/DIA


Precio Parcial

25.00 0.20
22.85 2.74
2.94

150.00 12.00
391.60 15.66
2.94 0.15
27.81
Costo Unitario por m3 : 30.75