PROYECTO ESTUDIO CARRETERA ALFAMAYO - QUILLABAMBA

RELACION DE MUROS DE CONTENCION

TIPOS DE MURO VOLUMEN CORTE (m3) VOLUMEN RELLENO (m3)


Nº PROGRESIVA LONG.
M4 M5 M6 M7 M8 M4 M5 M6 M7 M8 M4 M5 M6 M7 M8
De A h=2.50 m h=3.00 m h=3.50 m h=4.00 m h=4.50 m (m) h=2.50 m h=3.00 m h=3.50 m h=4.00 m h=4.50 m h=2.50 m h=3.00 m h=3.50 m h=4.00 m h=4.50 m
1 86+430 86+445 15.00 15.00 87.30 87.30 41.25
2 87+415 87+425 10.00 10.00 38.80 38.80 24.30
3 87+425 87+435 10.00 10.00 80.4 80.40 51.3
4 87+775 87+785 10.00 10.00 48.20 48.20 27.80
5 87+845 87+855 10.00 10.00 50.50 50.50 40.80
6 88+060 88+085 7.50 7.50 10.00 25.00 43.88 76.28 173.20 293.35 7.28 30.30 98.70
7 89+150 89+170 20.00 20.00 318.80 318.80 179.40
8 89+930 89+950 20.00 20.00 139.20 139.20 74.00
9 90+635 90+655 20.00 20.00 127.80 127.80 67.40
10 90+655 90+665 10.00 10.00 74.60 74.60 38.60
11 90+775 90+785 10.00 10.00 34.80 34.80 17.90
12 90+815 90+855 10.00 30.00 40.00 77.30 336.75 414.05 53.90 282.90
13 91+195 91+205 10.00 10.00 78.70 78.70 37.80
14 91+810 91+830 20.00 20.00 223.60 223.60 190.00
15 94+610 94+635 25.00 25.00 370.75 370.75 242.75
16 95+555 95+565 10.00 10.00 107.80 107.80 52.30
17 95+670 95+705 15.00 20.00 35.00 45.60 222.60 268.20 33.15 192.80
18 100+675 100+685 10.00 10.00 129.80 129.80 101.90
19 100+875 100+885 10.00 10.00 38.20 38.20 18.40
20 101+415 101+425 10.00 10.00 49.40 49.40 27.70
21 103+385 103+410 25.00 25.00 0.00
22 103+485 103+495 10.00 10.00 53.80 53.80 26.40
23 103+890 103+410 20.00 20.00 0.00
24 105+295 105+350 20.00 35.00 55.00 89.40 274.40 363.80 56.00 347.55
25 106+795 106+805 10.00 10.00 88.60 88.60 49.50
26 106+835 106+845 10.00 10.00 68.80 68.80 36.70
27 107+595 107+615 20.00 20.00 112.80 112.80 60.40
28 107+600 107+610 10.00 10.00 0.00
29 107+755 107+765 10.00 10.00 53.60 53.60 25.90
30 108+155 108+165 10.00 10.00 66.00 66.00 36.50
31 110+605 110+615 10.00 10.00 58.00 58.00 31.60
32 115+350 115+370 20.00 20.00 181.80 181.80 105.40
33 115+915 115+925 10.00 10.00 58.80 58.80 36.70
34 115+925 115+930 5.00 5.00 57.20 57.20 44.35
35 115+930 115+970 40.00 40.00 680.00 680.00 562.80
36 115+970 115+990 20.00 20.00 260.00 260.00 175.40
37 115+990 116+005 15.00 15.00 108.00 108.00 68.40
38 116+005 116+040 15.00 20.00 35.00 58.80 150.30 209.10 41.10 101.40
39 116+695 116+715 20.00 20.00 180.40 180.40 102.20
40 118+245 118+270 10.00 15.00 25.00 39.60 95.25 134.85 18.00 57.15
41 123+575 123+585 10.00 10.00 34.60 34.60 16.40
42 123+585 123+595 10.00 10.00 45.50 45.50 27.40
43 132+675 132+685 10.00 10.00 56.60 56.60 302.25
44 132+750 132+770 20.00 20.00 153.00 153.00 118.40
45 135+275 135+285 10.00 10.00 146.40 146.40 100.50
46 135+345 135+370 25.00 25.00 355.88 355.88 250.13
47 136+505 136+525 20.00 20.00 447.40 447.40 264.60
48 137+005 137+015 10.00 10.00 141.90 141.90 92.10
49 138+835 138+845 10.00 10.00 134.30 134.30 97.10
50 139+005 139+030 10.00 15.00 25.00 110.70 228.75 339.45 54.10 151.50
Total LONGITUD 187.50 125.00 97.50 150.00 300.00 860.00 620.38 663.10 706.53 1,390.30 4,184.53 327.33 648.40 396.20 863.90 3,154.73
Area Material gravoso 0.6 0.75 0.9 1.05 1.2
AREA /MURO 2.10 2.80 3.47 4.37 2.68
VOLUMEN TOTAL 393.75 350.00 338.33 655.50 804.00 Nota : Para el caso del calculo de rellenos se ha considerado el descuento del Volumen del Material gravoso de 30cm de ancho por
VOL. TOTAL C°Ciclopeo (m3) 1737.58 la respectiva altura (Ver plano sistemicos) y ver Formulas en casillero respectivo
VOL. TOTAL C°Armado (m3) 804.00
ancho de Solado (m) 1.65 1.90 2.20 2.50 2.80 La formula de los casilleros de relleno indican lo sgte:
Area solado e=0.10m (m2) 309.38 237.50 214.50 375.00 840.00 area de relleno por longitud de muro menos area del material gravoso por longitud de muro.
Total solado e=0.10m (m2) 1976.38
Perimetro Encofrado (m) 4.99 6.01 7.01 8.04 9.00 7,564.83 5,390.55
Area de Encofrado (m2) 935.63 751.25 683.48 1206.00 2,700.00
Total Area de Encofrado (m2) 6276.35
Total Acero de refuerzo (Kg) 1763.00
TIPOS DE MURO

M1 - M7 Muros Tipo Ciclopeo


M8 Concreto Armado