No. Reference/Page No. Purchaser's Comment VENDOR Response or Concusion Purchaser's Comment VENDOR Response or Concusion
6 Page 3 of 14 Refer to datasheet this shold be H4000CC, DAIKIN to clarify Noted, follow datasheet
8 Page 3 of 14 in Mechanical data & datasheet the SA 11.006 L/s The value of AHU blower
ACCU doesn't have to be mirrored installation. Please apply same pipe dirrection to both unit
9 Page 3 of 14 Follow layout drawing OCR, The location of piping connection ACCU to AHU right side from LCP => Noted
A & B (view from LCP: Left side
Rearrange the equipment and prevent clashes or problem maintenance, refer to process
10 Page 3 of 14 The position component have a distance => Ensure the space during maintenance or overhaul is enough Ensure the space during maintenance or overhaul is enough Noted
area arrangement is completely different
Refer to 26071-203-H6C-341-37012 the cooling capacity should be 260kW, DAIKIN to explain Noted. Already revised. => put the correct data, data that mentioned at GA drawing is for maximal cooling put the correct data, data that mentioned at GA drawing is for maximal cooling capacity, please
11 Page 3 of 14 Noted
the selection criteria capacity, please revise accordingly revise accordingly
As per Datasheet and Mechanical Data dimention suction pipe Ø2 1/8" and liquid pipe connection Ø7/8" =>
12 Page 3 of 14 Refer to P&ID this should be 1 1/8", Daikin check datasheet and relevant drawings
Noted
What does by field mean? Foundation will be prepared by main contractor as per required
13 Page 8 of 14 Drawing already provided, Please check again. => Noted
dimention and minimum height provided in this drawing.
Provide notes, how big and size of the maintenance equipment required. The availability if
Noted.
14 Page 5 of 14 space in this building shall refer to the operation manual by VENDOR. 3000mm clearance is
Minimum clearence for access maintenance area is width unit. => Noted
the conservative approach. Clarify the unit of equipment required on the maintenance area.
Add provide the lifting gear (crane assembly into the lifting lug) illustration, including the size
15 Page 7 of 14 Noted, location of the padeyes to be revised after COG calculation => Noted
of equipment required, location of the padeyes and arrangement
As per GAD data base on 1 unit => please ensure the qty, which document which are valid to follow, please make please ensure the qty, which document which are valid to follow, please make align the
16 Page 9 of 14 Compressor qty id contradictive with datasheet which show qty per ACCU 4 unit Noted, will be revise (2 EA Compressor for each ACCU)
align the number of compressor. 2 compressor for each ACCU or 4 compressor for each ACCU number of compressor. 2 compressor for each ACCU or 4 compressor for each ACCU
Not Agreed.
17 Page 9 of 14 Hot gas bypass is missing The system already had controllor for control system. Cause the system have two compressor and running with
capacity control 33-66-100% and the compressor have stepless capacity regulator
Please try to make ACCU 001A/B and 002A/B shall be delivered become 1 unit and please
19 Page 11 of 14 Noted, will be revised on GAD => Noted
make sure no issued for transportation during shipment
M. Naufal
1 of 14
Doc. No. : 26071-100-V1A-H601-02006
REVISION LOG
TYPICAL, please optimize the dimension because there is limitation space for AHU
indoor and size maximum limit
2 of 14
detail piping from ACCU, and AHU to be mentioned ACCU SPECIFICATION
& Joining skid installation detail
TOP VIEW
Name Plate
DRAWING
RACK
FRONT VIEW
SIDE VIEW
TB1 TB1.1 TB1.2 TB1.3 TB1.4 TB1.5 TB1.6 TB2 TB3 TB4 TB5 TB6 SPARE
PE IE
PERTAMINA
TOP VIEW
Name Plate
DRAWING
RACK
FRONT VIEW
SIDE VIEW
SPARE TB6 TB5 TB4 TB3 TB2 TB1.6 TB1.5 TB1.4 TB1.3 TB1.2 TB1.1 TB1
IE PE
PERTAMINA
5 of 14
Lifting gear illustration
PERTAMINA
6 of 14
NOTE :
TOP VIEW
Name Plate
DRAWING
RACK
PERTAMINA
7 of 14
TOP VIEW
8 of 14
as per data sheet shall be
4 ea
ACCU SPECIFICATION
DETAIL A
DETAIL C
DETAIL B DETAIL D
TOP VIEW
Name Plate
DRAWING
RACK
FRONT VIEW
SIDE VIEW
TB1
TB1.1 TB1.2 TB1.3 TB1.4 TB1.5 TB1.6 TB1.7 TB1.8 TB1.9 TB1.10 TB1.11 TB1.12 TB2 TB3 TB4 TB5 TB6 SPARE
PE IE
PERTAMINA
DETAIL A
DETAIL C
DETAIL B
TOP VIEW DETAIL D
etalP emaN
GNIWARD
KCAR
FRONT VIEW
SIDE VIEW
TB1
SPARE TB6 TB5 TB4 TB3 TB2 TB1.12 TB1.11 TB1.10 TB1.9 TB1.8 TB1.7 TB1.6 TB1.5 TB1.4 TB1.3 TB1.2 TB1.1
IE PE
PERTAMINA
PERTAMINA
TOP VIEW
11 of 14
Lifting gear illustration
PERTAMINA
TOP VIEW
12 of 14
NOTE :
TOP VIEW
Name Plate
DRAWING
RACK
13 of 14
TOP VIEW
14 of 14