Estimate the quantities and prepare bill of quantities for the following works:

Excavation
Backfill
Concrete for column necks
Concrete for ground beams
Concrete for columns
Concrete for footings
Concrete for beams
Concrete for slab

Knowing that,

Height from top of floor to bottom of roof slab is 3.0 m


Roof slab height is 10 cm
Column necks are same dimensions as columns
Depth of excavation is 1.2 m
Dimension of ground beams is 20x50 cm
Thickness of Blinding concrete is 10 cm and increase 10 cm in each direction
Ground slab height is 10 cm

Dimensions for footings, columns and roof beams are shown and described in the following plans and
tables:

‫ طارق عبدهللا بركات‬/‫د‬ ‫مواصفات‬-‫كميات‬-‫عقود‬


‫واجب رقم ‪3‬‬

‫د‪ /‬طارق عبدهللا بركات‬ ‫عقود‪-‬كميات‪-‬مواصفات‬


‫واجب رقم ‪3‬‬

‫د‪ /‬طارق عبدهللا بركات‬ ‫عقود‪-‬كميات‪-‬مواصفات‬


‫واجب رقم ‪3‬‬

‫د‪ /‬طارق عبدهللا بركات‬ ‫عقود‪-‬كميات‪-‬مواصفات‬


‫واجب رقم ‪3‬‬

‫د‪ /‬طارق عبدهللا بركات‬ ‫عقود‪-‬كميات‪-‬مواصفات‬


‫واجب رقم ‪3‬‬

‫د‪ /‬طارق عبدهللا بركات‬ ‫عقود‪-‬كميات‪-‬مواصفات‬


‫واجب رقم ‪3‬‬

‫د‪ /‬طارق عبدهللا بركات‬ ‫عقود‪-‬كميات‪-‬مواصفات‬


3 ‫واجب رقم‬

Dimensions Total Quantities


‫األبعاد‬ ‫الكمية الكلية‬
Item description ‫الوحدة‬ ‫الكمية‬ Partial Quantities
S.N
‫بيان األعمال‬ Unit Quantity L W H ‫الكميات الجزئية‬ Total
‫الطول‬ ‫العرض‬ ‫االرتفاع‬ Positive + Negative – ‫اإلجمالي‬
‫إضافة‬ ‫خصم‬

Note: Copy the sheet and expand it as required to complete the assignment.