SHOP DRAWING

Project :
Villa
Kalsiplank Concrete Slab

+ 3.80
Owner :
Gypsum Ceiling Gypsum Ceiling Gypsum Ceiling Gypsum Ceiling Michael Young
+ 3.40 + 3.40 + 3.40 + 3.40 Approve by :

........................
........................
Costruction Management :
PT/CV.
Bedroom Kitchen Bedroom
+ 0.40 + 0.40 + 0.40 Check by :
+ 0.40
Living Room ........................
- 0.48 ........................
Soil filled
Soil Costruction Contractor :
77.5 345.0 840.0 345.0 PT/CV
77.5
Approve by :

Section A ........................
........................
No Revision Date Signed

Architect Consultant :
Kalsiplank Concrete Slab

+ 3.80
........
40.0
Structure Consultant :
Plafond gypsum Gypsum Ceiling Plafond gypsum
+ 3.40 + 3.40 + 3.40
........
8
40.0
8
Mechanical Consultant :
76.0
........

Terrace Kitchen
+ 0.40
Drawing Tittle :
+ 0.30
+ 0.40
Section

Soil filled Soil Scale Drawn Andika


207.5 662.5 200.0 Check Abdi
1 : 60
Approved Michael Young
Section B Issued for : ........ Code Draw no
Design
Development 066 005
Date 09.02.2021