9 Bolt&Nut M16x300 Bh 96 50 1 11 - - - 12 4
15 Arm Brace Bh
-
PERTANGGUNGJAWABAN MATERIAL
SI : Dusun Koto Parit - Kab. ROHUL
N.02.03/UPPK-RIAU/2019, Tgl. 17 Desember 2019 (KSP)
JUMLAH
TOTAL KET
23,623 PM
615 PM
117 PM
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
PERTANGGUNGJAWABAN MATERIAL
SI : Dusun Koto Parit - Kab. ROHUL
N.02.03/UPPK-RIAU/2019, Tgl. 17 Desember 2019 (KSP)
JUMLAH
TOTAL KET
PM
TAR KEBUTUHAN MATERIAL
sun Koto Parit - Kab. ROHUL PT. KSP
JUMLAH
TOTAL KET
PM
PM
PM
PM
PM
PM
PM
PM
PERHITUNGAN MATERIAL
KONTRUKSI TIANG BETON
PEMASANGAN JTM AAAC BETON
KONTRUKSI
NO. NAMA MATERIAL STN. AAAC AAAC 150 TM-1 TM-2 TM-3 TM-4 TM-5 TM-6 TM-7 TM-8 TM-10
3 Pin Isolator 20 kV Bh 3 - - - - - - -
7 Bolt&Nut M16x300 Bh 1 - - - - - - -
8 Bolt&Nut M16x70 Bh 2 - -
PEMASANGAN JTR
KONTRUKSI
NO. NAMA MATERIAL STN. LVTC TR-1 TR-2 TR-3 TR-4 TR-5 TR-6 TR-6a TR-7 TR-9
PEMASANGAN GD
KONTRUKSI
NO. NAMA MATERIAL STN. GD100(4) GD100(2) LBS 20 KV GTM (trafo) GTM (Jar)
JUMLAH
TOTAL
TRAFO DISTRIBUSI 4 & 2 JURUSAN & LBS
-
- 1 Transformator 3 phasa 100 KVA - 20 KV/220V Bh
- 2 Fuse Cut Out 20 KV - 100 Amp lengkap Fuse Link Bh
- 3 Lighting Aresster 20 KV - 10 kA Bh
- 4 String Insulator 20 kV Set
- 5 Load Break Switch (LBS) MANUAL Bh
- 6 Bolt & Nut M 6" - 8" x 300mm Bh
- 7 Plat Baja penahan cross arn Set
- 8 CA UNP 100x50x6x2000mm u/ LA &Arrester Btg
- 9 Kabel NYY 1x95 mm2 Mtr
- 10 Kabel NYY 1x 70 mm2 Mtr
- 11 Kabel Schoen CU - 95 mm2 Bh
- 12 Kabel Schoen CU - 70 mm2 Bh
- 13 Rack Trafo (Breaket) 3 Pole komplit Bh
- 14 Papan Jati / Kulim 50x200x220 u/dudukan pengaman Lbr
- 15 Pondasi Trafo Tiang Portal (Cor Beton 1.2.3 Besi 12 mm) Set
- 16 Schoor untuk pengaman Trafo komplit Set
- Grounding Arester Body and Nol Trafo (GTM) Set
- 17 - Grounding Rod 5/8 x 5F with clamp btg
- 18 - Copper conductor 50mm2 mtr
- 19 - Pipa Galvanized 3/4"-3 mtr u/saluran Grounding btg
- 20 - Pipa Galvanized 3/4"-6 mtr u/saluran Grounding btg
- 20 - Tap Conector CU/AL 25-35/70-150 mm2 u/jumper bh
- 21 - Stainless steel mtr
- 22 - Stoping Buckle bh
- 23 - Link bh
- 24 Pipa Galvanized 3" - 6 mtr Btg
- 25 Bochten 3" Galvanized Bh
- 26 Flan's untuk pemasangan pipa ke panel Bh
- 27 Klem/Band Pole (u/ satu riset trafo tiang portal) Set
- 28 Cupper Conductor 35 mm2 Kg
- 29 Joint Sleeve Bimetal CU/AL 70-50 mm2 Bh
- 30 Lemari Bagi TR 4 jurusan, Moun Plate 1x1,25x0,35 M Unit
- 31 Lemari Bagi TR 2 jurusan, Moun Plate 1x1,25x0,35 M Unit
- 32 Plat Tanda Kilat (plat besi tebal 1,5mm ; 640x640 mm) Bh
- 33 Penghalang Panjat Bh
-
-
-
-
-
-
DAFTAR KEBUTUHAN MATERIAL
LOKASI : …………………………………………….
PENGAMBILAN JUMLAH
TOTAL KET
- PM
- PM
- PM
- PM
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
- PM
PM
PM
- - PM
- - PM
- - PM
- - PM
- -
- -
- -
- -
- - PM
- - PM
- -
- -
- -
- -
- -
- -
-
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- - PM
- - PM
- -
- -
PERHITUNGAN MATERIAL
NO. NAMA MATERIAL STN. LVTC TR-1 TR-2 TR-3 TR-4 TR-5 TR-6 TR-6a TR-7
15.250 85 6 13 - 2 4 1
1 LVTC 3x70+1x50 mm2 Mtr 15,555
2 Compre.Joint Non Tension 70mm2 Bh 46
3 Compre.Joint Tension 50mm2 Bh 15
4 Suspension Assy + plastik strap Set 85 - 4
5 Large Assy + plastik strap Set 6
6 Dead End Assy + plastik strap Set 13 4 4
7 Steinless steel strip Mtr 102.0 7.2 31.2 - 2.4 4.8 - 1.2
8 Stoping Buckle Bh 170 12 52 - 4 8 - 2
9 Link Bh 26
10 Bundel end Protection Bh 13
11 Tap Conector 35-70 mm2 Bh - 16 - 4
12 Joint Sleeve Al/Cu 35-70mm2 Bh
13 Pipa Galv. 3/4"-3 mtr Btg
14 Tap Conector AL/CU 35-50/25-35 mm2 Bh
15 Grounding Rod Btg
16 Cooper Conductor 50 mm2 Mtr
17 Guy Isolator u/TR Bh
18 Band pole brace 3-4" Set
19 Turn Buckle/Span Skreoef Bh
20 Anchor Rod+Beton Block Set
21 Staal Draad Clmap 35 mm Bh
22 Kaos Baja Bh
23 Galv. Steel Wire 35 mm2 Mtr
24 Bolt & nut M16x300 Bh
25 Strut Support Set
26 Band pole brace 7-8" Set
27 Pipa galv. 0 1,5"-2 mtr Btg
28 Plat beton bertulang 1:2:3 0 500x500 mm Bh
29 Klam double 8x3" Set
PEMASANGAN GD
KONTRUKSI
NO. NAMA MATERIAL STN. GD25(cantol) GD100(2) LBS 20 KVGTM (trafo) GTM (Jar)
- 5
1 Transformator 3 phasa 25 KVA - 20 KV/220V Bh -
2 Transformator 3 phasa 50 KVA - 20 KV/220V Bh 2
3 Transformator 3 phasa 100 KVA - 20 KV/220V Bh 3
4 Fuse Cut Out 20 KV - 100 Amp lengkap Fuse Link Bh - -
5 Lighting Aresster 20 KV - 10 kA Bh - -
6 Rak trafo Portal / Ijzerwerk 2 Tiang Set 5
7 Rak trafo Portal / Ijzerwerk cantol Set - -
8 Staal Draad 35 mm2 / Pengaman Trafo Mtr - 10
9 Turn Buclkle/Span skroef Bh - 10
10 Wire Clip/Pinik Klem Bh 20
11 Band for Arm Brace komplit bolt & nut Set 10
12 CA UNP 100x50x5x2000mm u/ LA &Arrester Btg 10
13 CA UNP 100x50x5x2000mm u/ LS Board Btg - 10
14 Bolt & Nut M16x50 mm Bh 150
15 Double Arm Bolt & Nut M16x250 mm Bh 20
16 Clamp beugel 11-12" komp. Bolt & Nut Set 20
17 Kabel NYY 1x150 mm2 Mtr - -
18 Kabel NYY 1x95 mm2 Mtr
19 Kabel NYY 1x 70 mm2 Mtr - 216
20 Kabel Schoen CU - 150 mm2 Bh - 40
21 Kabel Schoen CU - 95 mm2 Bh
22 Kabel Schoen CU - 70 mm2 Bh - 40
23 Kabel Schoen CU - 35 mm2 Bh
24
25 Papan Jati / Kulim 50x200x220 u/dudukan pengaman Lbr 10
26 Pondasi Trafo Tiang Portal (Cor Beton 1.2.3 Besi 12 mm Set - 5
27
28 Grounding Arester Body and Nol Trafo (GTM) Set
- Grounding Rod 3/4 x 1,5F with clamp btg - 15 -
- Copper conductor 35mm2 mtr - 125 -
- Pipa Galvanized 3/4"-4 mtr u/saluran Grounding btg - 10 -
- Stainless steel mtr - 18.00 -
- Stoping Buckle bh - 20 -
- Link bh - 20 -
29 Pipa Galvanized 3" - 6 mtr Btg - 15
30 Bochten 3" Galvanized Bh - 30
31 Flan's untuk pemasangan pipa ke panel Bh - 15
32 El bow PVC 3" Bh 15
Double clamp 10x3" Set 15
33 Double clamp 12x3" Set - 15
34 Cupper Conductor 35 mm2 Mtr - 75
35 Conector CU/AL 35-70/70-150 mm2 Bh - 15
36 Joint CU-AL 70-70+heat shrink Bh 30
Joint CU-AL 70-50+heat shrink Bh 10
Lemari Bagi TR 4 jurusan, Moun Plate 1x1,25x0,35 M Unit
37 Lemari Bagi TR 2 jurusan, cantol Unit - 3
38 Lemari Bagi TR 2 jurusan, Portal Unit -
39 Plat Tanda Kilat (plat besi tebal 1,5mm ; 640x640 mm) Bh - 5
H Type conector Bh
Lightning Arrester 20 kV Bh
Copper Conductor 25 mm2 Kg
Pipa Galv. 3"-6 mtr.+klem pipa/kabel Btg
Tap Conector AL 35-70 u/3 baut Bh
Tap Conector CU/AL 25/35-70 u/jumper Bh
Kabel Schoen AL 35-70 mm2 Bh
Copper Conductor 50 mm2 Mtr
Pipa Galv. 3/4"-3 mtr Btg
Grounding Rod 5/8" Btg
Steinless steel strip Mtr
Stoping Buckle Bh
Link Bh
ERHITUNGAN MATERIAL
KONTRUKSI JUMLAH
TM-16 TM-16A E-1 E-2 E-3 TM-10 GTM Arrester TOTAL
4 3
1,600
- - 132
- - 27
- - - 58
-
- - - 158
- - - -
- - -
76
- - - 58
- - - 152
3 3
- - - 60
- - - 3
9
4 3 7
4 3 7
4 3 7
32 36 68
8 6 14
44 96 140
4 3 - 7
- -
- -
- -
- -
KONTRUKSI JUMLAH
-
2
3
-
-
5
-
10
10
20
10
10
10
150
20
20
-
-
216
40
-
40
-
-
10
5
-
-
15
125
10
18
20
20
15
30
15
15
15
15
75
15
30
10
3
-
5
DAFTAR KEBUTUHAN MATERIAL
Lokasi : Desa Penyalai - UP3 Pekanbaru ( Tiang Besi )
SPBJ No. 0136.SPBJ/DAN.02.03/UPPK-RIAU/2019, Tgl 30 Sept. 2019
PT. PRASS
PENGAMBILAN JUMLAH
NO. NAMA MATERIAL STN. JUMLAH TOTAL KET.
NO. NAMA MATERIAL STN. LVTC TR-1 TR-2 TR-3 TR-4 TR-5 TR-6 TR-6a TR-7 TR-9
KONTRUKSI
NO. NAMA MATERIAL STN. GD100(4) GD100(2) LBS 20 KVGTM (trafo) GTM (Jar)
H Type conector Bh
Lightning Arrester 20 kV Bh
Copper Conductor 25 mm2 Kg
Pipa Galv. 3"-6 mtr.+klem pipa/kabel Btg
Tap Conector AL 35-70 u/3 baut Bh
Tap Conector CU/AL 25/35-70 u/jumper Bh
Kabel Schoen AL 35-70 mm2 Bh
Copper Conductor 50 mm2 Mtr
Pipa Galv. 3/4"-3 mtr Btg
Grounding Rod 5/8" Btg
Steinless steel strip Mtr
Stoping Buckle Bh
Link Bh
HITUNGAN MATERIAL
KONTRUKSI JUMLAH
TM-16A E-1 E-2 E-3 TM-10 GTM Arrester TOTAL
-
- -
- -
- - -
-
- - -
- -
-
-
- - -
- - -
- -
- - -
- - -
-
- - -
- - -
- - -
- - -
- - -
- - -
- - - -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
-
-
- -
-
-
KONTRUKSI JUMLAH
-
-
-
-
-
- -
- - 0
- - 0
- 0
0
0
0
- 0
- 0
- 0
- 0
- - 0
0
- - 0
- - 0
- - 0
- - 0
- - 0
- - 0
- 0
- 0
- 0
- 0
- 0
- 0
KONTRUKSI JUMLAH
TOTAL
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
DAFTAR KEBUTUHAN MATERIAL
Lokasi :
SPBJ No. .SPBJ/DAN.02.03/UPPK-RIAU/2019, Tgl 02 Sept. 2019
\ PT. KSP
PENGAMBILAN JUMLAH
NO. NAMA MATERIAL STN. JUMLAH TOTAL KET.
1.000 1 1 1 1
3 Pin Isolator 20 kV Bh 3 3
9 Bolt&Nut M16x50 Bh 4 4
10 Bolt&Nut M16x70 Bh 4 4
15 Bolt&Nut M16x300 Bh 2 2
PEMASANGAN JTR
KONTRUKSI
NO. NAMA MATERIAL STN. LVTC TR-1 TR-2 TR-3 TR-4 TR-5 TR-6 TR-6a TR-7 TR-9
PEMASANGAN GD
KONTRUKSI
NO. NAMA MATERIAL STN. GD100(4) GD100(2) LBS 20 KV GTM (trafo) GTM (Jar)
1 Transformator 3 phasa 50 KVA - 20 KV/220V Bh
2 Transformator 3 phasa 100 KVA - 20 KV/220V Bh - -
3 Fuse Cut Out 20 KV - 100 Amp lengkap Fuse Link Bh - -
4 Lighting Aresster 20 KV - 10 kA Bh - -
5 Load Break Switch (LBS) MANUAL Bh 0
6 String Insulator 20 kV Set 0
7 Bolt & Nut M 6" - 8" x 300mm Bh - -
8 Plat Baja penahan cross arn Bh - -
9 CA UNP 100x50x5x2400mm u/ LA &Arrester Btg - -
10 Kabel NYY 1x150 mm2 Mtr
11 Kabel NYY 1x95 mm2 Mtr - -
12 Kabel NYY 1x 70 mm2 Mtr - -
13 Kabel Schoen CU - 150 mm2 Bh
14 Kabel Schoen CU - 95 mm2 Bh - -
15 Kabel Schoen CU - 70 mm2 Bh - -
16 Kabel Schoen CU - 35 mm2 Bh
17 Rack Trafo (Breaket) 3 Pole komplit Bh - -
18 Papan Jati / Kulim 50x200x220 u/dudukan pengamLbr - -
19 Pondasi Trafo Tiang Portal (Cor Beton 1.2.3 Besi Set - -
20 Schoor untuk pengaman Trafo komplit Set - -
21 Grounding Arester Body and Nol Trafo (GTM) Set
- Grounding Rod 5/8 x 5F with clamp btg 0 - -
- Copper conductor 50mm2 mtr 0 - -
- Pipa Galvanized 3/4"-3 mtr u/saluran Grounding btg - -
- Pipa Galvanized 3/4"-6 mtr u/saluran Grounding btg 0
- Tap Conector CU/AL 25-35/70-150 mm2 u/jumpe bh - -
- Stainless steel mtr 0 - -
- Stoping Buckle bh 0 - -
- Link bh - -
22 Pipa Galvanized 3" - 6 mtr Btg - -
23 Bochten 3" Galvanized Bh - -
24 Flan's untuk pemasangan pipa ke panel Bh - -
25 Klem/Band Pole (u/ satu riset trafo tiang portal) Set - -
26 Cupper Conductor 35 mm2 Kg - -
27 Joint Sleeve Bimetal CU/AL 70-50 mm2 Bh - -
28 H Type joint Sleeve conector Bh 0
29 Lemari Bagi TR 4 jurusan, Moun Plate 1x1,25x0,35Unit -
30 Lemari Bagi TR 2 jurusan, Moun Plate 1x1,25x0,35Unit -
31 Plat Tanda Kilat (plat besi tebal 1,5mm ; 640x640 Bh - -
32 Penghalang Panjat Bh - - -
DAFTAR KEBUTUHAN MATERIAL
LOKASI : …………………………………………….
-
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- -
- -
- -
- -
- -
JUMLAH
TOTAL
- TRAFO DISTRIBUSI 4 & 2 JURUSAN & LBS
-
- 1 Transformator 3 phasa 100 KVA - 20 KV/220V Bh
- 2 Fuse Cut Out 20 KV - 100 Amp lengkap Fuse Link Bh
- 3 Lighting Aresster 20 KV - 10 kA Bh
- 4 String Insulator 20 kV Set
- 5 Load Break Switch (LBS) MANUAL Bh
- 6 Bolt & Nut M 6" - 8" x 300mm Bh
- 7 Plat Baja penahan cross arn Set
- 8 CA UNP 100x50x6x2000mm u/ LA &Arrester Btg
- 9 Kabel NYY 1x95 mm2 Mtr
- 10 Kabel NYY 1x 70 mm2 Mtr
- 11 Kabel Schoen CU - 95 mm2 Bh
- 12 Kabel Schoen CU - 70 mm2 Bh
- 13 Rack Trafo (Breaket) 3 Pole komplit Bh
- 14 Papan Jati / Kulim 50x200x220 u/dudukan pengaman Lbr
- 15 Pondasi Trafo Tiang Portal (Cor Beton 1.2.3 Besi 12 mm) Set
- 16 Schoor untuk pengaman Trafo komplit Set
- Grounding Arester Body and Nol Trafo (GTM) Set
- 17 - Grounding Rod 5/8 x 5F with clamp btg
- 18 - Copper conductor 50mm2 mtr
- 19 - Pipa Galvanized 3/4"-3 mtr u/saluran Grounding btg
- 20 - Pipa Galvanized 3/4"-6 mtr u/saluran Grounding btg
- 20 - Tap Conector CU/AL 25-35/70-150 mm2 u/jumper bh
- 21 - Stainless steel mtr
- 22 - Stoping Buckle bh
- 23 - Link bh
- 24 Pipa Galvanized 3" - 6 mtr Btg
- 25 Bochten 3" Galvanized Bh
- 26 Flan's untuk pemasangan pipa ke panel Bh
- 27 Klem/Band Pole (u/ satu riset trafo tiang portal) Set
- 28 Cupper Conductor 35 mm2 Kg
- 29 Joint Sleeve Bimetal CU/AL 70-50 mm2 Bh
- 30 Lemari Bagi TR 4 jurusan, Moun Plate 1x1,25x0,35 M Unit
- 31 Lemari Bagi TR 2 jurusan, Moun Plate 1x1,25x0,35 M Unit
- 32 Plat Tanda Kilat (plat besi tebal 1,5mm ; 640x640 mm) Bh
- 33 Penghalang Panjat Bh
-
-
-
-
-
DAFTAR KEBUTUHAN MATERIAL
LOKASI : …………………………………………….
PENGAMBILAN JUMLAH
TOTAL KET
- PM
- PM
- PM
- PM
-
-
-
- PM
PM
PM
- - PM
- - PM
- - PM
- - PM
- -
- -
- -
- -
- - PM
- - PM
- -
- -
- -
- -
- -
- -
-
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- - PM
- - PM
- -
- -