1. The owner wants to embank (0.85 depth from the NGL) the inside of the perimeter fence with clayey soil.

2. Project Location

3. Quarry Location

4. Balance Fleet Available for Suppliers:

5 units 18 cu.m. Dumptrucks (20 cu.m.), 1 unit Payloader (2.06 cu.m. per bucket, can cater 1 bucket per 5 mins), 1 unit
Bulldozer(280 cu.m. per day) , no road grader