You are on page 1of 262
! Ls006-002-24 QULY 7, 1971 : LUNAR ROVING VEHICLE OPERATIONS HANDBOOK CONTRACT NASB~25145 LUNAR ROVING VEHICLE MS ENGINEERING MANAGER PREPARED 8Y THE BOEING COMPANY LRV SYSTEMS ENGINEERING HUNTSVILLE, ALABAMA LS006-002-2H LUNAR ROVING VEHICLE OPERATIONS HANDBOOK Reproduction for non-goversment .ise of tha information or illustrations con~ nga in thfaopublication is not peraitted without specific approval of the amma INSERT LATEST CHANGED PAGES. [istorerecive races} Total number of pages in this publication is 374, consisting of the following: PAGE NO. ISSUE PAGE NO. ISSUE Title 1171 agin A 77M 6/23/71 8 un 4nig/7i 4 thew vit un angi Tel thru 1-3 6/23/71 6/23/71 1-4 angi 4/ig/7) 15 6/23/71 6/23/71 15.1 6/23/71 angi. 1-6 4/9/71 6/23/71 1-7, 6/23/71 ang/7\ 1-811 6/23/71 6/23/71 1-8, 1-10 6/23/71 anig/7 i 4/19/71 6/23/71 1-12, 1-13 6/23/71 afg/7) 3e14" thru 1-17 4/19/71 6/23/71 1-18 thru 1-20. 6/23/71 4/137 1-21, 1-22 angin Title 1-23" thru 1-28 6/23/71 (Appendix A) 6/10/71 1-29, 1-30 43/71 Ai thru Av 6/10/71 331" thru 1-33, 6/23/71 Aol thru A$ 6/10/71 1234 thru 1-36 4/19/71 BS 4/19/71 1-37 thru 1-81 6/23/71 4-6 thru Ae? 6/10/71 aT 6/23/71 4-8 thru AIO 4/19/71 1742" thru 1-81 6/23/71 a 6/10/71 152, 1-53 anngin wiz 4713/7 V5q, 1-54.12 6/23/71 K-13 thru A-TS 6/10/71 5 4/ig/71 ale angyn 1-56 thru 1-61 6/23/71 AAVT thru A-31 6/10/71 1-62 4/9/71 An32 4/9/71 1°63 thru 1-79 6/23/71 A033 thru A-35— 6/10/71 221 thru 2-60 7/7/71 4-36 ang/7 2:51 thru 2-63 6/23/71 4-37 thru A-44 6/10/71 B:1 thru 312, +7/7/71 a5 ang 3a-1 thru 3A-9 6/23/71 a 67/10/71 Se thru 4-15 6/23/71 4-461 6/10/71 5-1 4/3/71 K-47 thru A-58 6/10/71 5-2 thru 5-4 6/23/71 4-59 thru A-6l 4/19/71 61 ann 4-62 thru A-65 6/10/71 6-2 thru 6-7 6/23/71 4-66 4ng/7) i 6-8 aig 4-67 6/10/71 t 6-9, 6-10 6/23/71 A-68 thru A-70_ 4/19/71 ot angn 6:12 6/23/11 Mission_J Basic Date 12/4/70Change Date 7/7/71 Page _& L8006-002-2H LUNAR ROVING VEHICLE OPERATIONS HANDBOOK Reproduction for non-government use of tha information or illustrations con- Helardta thts, publication is not permitted without specific approval of the INSERT LATEST CHANGED PAGES. DESTROY SUPERSEDED PAGES PAGE NO. ISSUE ACT thru A-74 6/10/71 A-74.1 thru A-74.3 6/10/71 ATS 49/7) AT6 6/10/71 AA77 4/3/71 aTB 6/10/71 4-79 thru A-81 4/19/71 ALB2 thru A-84 6/10/71 85, angi) A-86 thru A-97 6/10/71 A-98 thru A-105 4nngi7\ Title (Appendix B) ang/7i Bei wi5/71 Bi 15/71 BA thru 8-8 ws/71 Mission_J Basic pate 12/4/70 Change Date 7/7/71 Page s006-002-2H LUNAR ROVING VEHICLE OPERATIONS HANDBOOK HANDBOOK CONFIGURATION This handbook reflects the Lunar Roving Vehicle (LAV) and 1 ‘Space Support Equipment (SSE) configuration as insta c led in LM-I0 at KSC. Mission J Basic Date 124/70 Change Date 7/7/71 __ Page 1s006-002-24 LUNAR ROVING VEHICLE OPERATIONS HANDBOOK SECTION 1 3.0 4.0 a 42 a3 3A TABLE OF CONTENTS TITLE PAGE General Information Introduction Description Vehicle Systems Nobility Subsystem Electrical Power Subsystem Control and Display Console Navigation Subsystem Grew Station Thermal Control Space Support Equipment Normal Procedures Unloading and Chassis Deployment Post Deployment Checkout and Drive to MESA Payload Loading Pre-Sortie Checkout and Preparation LRV Configuration for Science Stop LRV Configuration Prior to Leaving Science Stop Post Sortie Checkout Display Reading Sequence and Time Intervals Special Procedures Malfunction Procedures Introduction 34 Other Contingencies 3A-1 Introduction 3A-1 Auxiliary Equipment 4 Introduction a1 Forward Chassis Payload Provistons 41 Center Chassis Payload Provisions a1 Rear Chassis Payload Provisions 47 Operating Limitations 5 Payload Limitations Parking Limitations 5-1 5-1 Sortie Limitations 5-1 Navigation System Limi tations 5-4 Mission a Basic Date _12/4/70_ Change Date _7/7/71__ Page L006 002-24 LUNAR’ ROVING VEHICLE ‘OPERATIONS HANDBOOK TABLE OF CONTENTS (Continued) SECTION Time Pace 6 Operating Timelines 6-1 6.0 Introduction 6-1 0 Operating Profiles 7 1 LRV Operating Profite 7-1 re 16 Trainer Operating Profile ra € 1G Trainer Non-Crew Procedures 8-1 8.0 Introduction 8-1 8.1 General Procedures 8-1 8.2 Specific Procedures 8-12 8.3 Preventive Maintenance Assembly Remove and 8-28 Replace Procedures, Basic Date 12/4/70 change Date _7/7/71_ Page _iii Mission Ls006~002-2H LUNAR ROVING VEHICLE OPERATIONS HANDBOOK FIGURE NO. LIST OF ILLUSTRATIONS TITLE Deployed LAV Without Stowed Payload 1G Trainer Mobility Subsystem LRV Wheel Cross-Section 1G Trainer Wheel and Pneunatic Tire Wheel Bulge Retention LRV Traction Drive Assembly Traction Drive Installation Suspension Assembly Steering Assembly Steering Control Block Diagram Steering Decoupling Hand Controller Torque Required to Rotate Hand Controller for Throttle Control Torque Required to Rotate Hand Controller for Steering Control PAGE 114 Brake Control Force Vs. Displacenent 1-24 115 Drive Control Electronics - Block Diagram 1-26 116 LAV Battery Configuration 1-28 LRV Batteries, Thermal Blanket and Dust Covers 1-30 Power Distribution System Schenatic 1-32 LRV Power/Tenperature Monitor Schematic 1-33 Caution and Warning System 1-38 Auxiliary Connector Location 1-36 Control and Display Console 1-38 Navigation Subsystem Block Diagram 1-43 Navigation Components on LRV 144 Navigation System Electrical Schenatic, 145 Vehicle Attitude Indicator 146 Sun Shadow Device 147 Crew Station Conponents 1-30 Seat Belts 3-82 Crew Station Floor Panels 153 UAV" Thermal Blanket 1-541 Thermal Control Provisions (Forward Chassis) 1-55 Drive Controller Electronics Thermal Contro? 1-56 SPU Electronics and Battery #1 Thermal Control 1-57 Battery #2 and Directional Gyro Unit Thermal Control 1358 Battery Dust Cover Closing Mechanism 1558 Forward Chassis Insulation Blanket 1-60 Space Support. Equipment 1-65 LW/SSE with LAV Installed 1-66 Mission J Basic Date 12/4/70 Change Date 7/7/71 _ Past iy — .s006-002-24 LUNAR ROVING VEKICLE OPERATIONS HANDBOOK LIST OF ILLUSTRATIONS (CONTINUED) FIGURE NO. Tne PAGE 1-39 LRV Deployment Sequence 1-67 140 Deployment Tapes and Deployment Cable Stowage 1-69 141 DoHandle Release System 1-70 LRV/SSE Support Structure and Release System mn Braked Ree! 1-72 LRV Saddle and Forward Chassis Latch System 1-74 Forward and Rear Chassis Latch 195 Wheel Lock strut Release 176 Whee! Bulge Retention Cable Release Vw LRV Thermal Balnket 2. Support Arm Latch Mechanism Latched Configuration 2. LRV Deployment Tapes and Cables 2, LRV Deployment Envelope and Envelope for Deployment Tape Operations 2-6 Crewman Positioned to Deploy LRV 2-7 LRV Deployment Sequence 2-9 LRV Deployment Hardware & Steering Ring Location an Foot Rest Deployment. 25 Control and Display Console Deployment 2-16 Seat and PLSS Support Deployment Sequence 27 Crew Position 2:24 Control and Display Console 2-25 LCRU/TV/LRV Cable Stowage 2-30 LCRU, High Gain Antenna, TV Camera Installation 2-31 16 nm OAC and Low Gain Antenna Instal lation 2-34 LCRU Low Gain Antenna Cable Installation on Lunar Surface 2-36 LRV Rear Payload Pallet Adapters 2-37 Rear Payload Pallet Installed 2239 Buddy SLSS "Installation 240 Map Holder Installation 2240.1 Gnomon Bag Attachnent. to LAV 2.40.2 Interim Storage for LRS and ALSD 224013 Whee! Decoupling Mechanism/Decoupl ing Tool Attachment 2-52 Wheel Decoupling Mechanism Positions 2-53 Steering Decoupling Ring Locations 257 ‘Steering Recoupling Tool Stowage 2-60 Rear Steering Recoupl ing 2-61 Contingency Oust Cover Closure 3A-9 LCRU, High Gain Antenna, TV Camera Installation 42 LoRu/tv/tRV Cabe’Stowage 43 UCRU Low Gain Antenna Cable Installation on Lunar Surface “4 16 mm DAC and Low Gain Antenna Installation a5 Map Holder Installation 456 Under-Seat Stowage Bag (Left Seat) a8 Passenger Seat Stowage to Create Payload Area on Center 49 Chassis Floor Interim (LM-to-ALSEP Site) Stowage of LR? and ALSD 4-10 12/4/70 change Date _7/7/71 Page _y Mission J ___ Basic Date 1006-02-24 LUNAR ROVING VEHICLE OPERATIONS HANDBOOK FIGURE NO. LIST OF ILLUSTRATIONS (CONTINUED) TITLE Buddy SLSS Installation Gnomon Bag Attachment to LRV LRV Rear Payload Pallet Adapters Rear Payload Pallet Installed Allowable C.G. Envelope for Vehicle Fully Loaded Parking Orientation Constraints LRV Deployment Timeline Post Deployment. Checkout Timeline Pre-Sortie Checkout and Preparation Timeline Post Sortie Shutdown Timeline Navigation Update Timeline LRV Traction Drive Decoupling Timeline LRV Steering Decoupling Timeline LRV Rear Steering Recoupling Timeline 1G Trainer Battery Changeout Tineline 1G Trainer Traction Drive Decoupling Timeline 1G Trainer Steering Decoupling Timeline Nominal Operating Profile Nominal Operating Profile for 1G Trainer 1G Trainer Basic Vehicle Block Diagram 1G Trainer Vehicle Power Distribution Block Diagram 1G Trainer Vehicle Front Traction Drive Electrical Signal Routing Block Diagram 1G Trainer Vehicle Rear Traction Drive Electrical Signal Routing Block Diagram 1G Trainer Vehicle Front Steering Electrical Signal Routing Block Diagram 1G Trainer Vehicle Rear Steering Electrical Routing Block Diagran 16 Trainer Vehicle Odometer Electrical Signal Routing Block Diagram 1G Trainer Temperature Diagnostics Electrical Signal Routing Block Diagram 1G Trainer Whee! Decoupling 1G Trainer Brake Linkage 1G Trainer Steering Arm Clamping to Simulate Steering Decoupling 1G Trainer Battery Installation 1G Trainer Battery Charging Circuit 89 8-17 8-19 8-22 8-24 8-26 Mission g Basic Date 12/4/79 Change Date _7/7/71 Page _y: Ls006-002-24 LUNAR ROVING. VEHICLE ‘OPERATIONS HANDBOOK LIST OF TABLES TABLE NO. TITLE PAGE a Cortrol and Display Console Controls 1-39 1-2 1G Trainer Thermal Control Device Set Points 1-62 31 Malfunction Procedures 3-2 32 Malfunction Logic Flow Diagrams 38 3A-1 Emergency Procedures 3A-2 3A-2 Malfunction Procedures 3A-3 3-3 Energency Logic Flow Diagrams 3h4 3A-4 Malfunction Logic Flow Diagrams 3A-5 at 1G Trainer Steering Operation Data 8-15 Mission Basic Date y2/ay2n Change Date 7/7/71 Page vii Ls006-002-24 LUNAR ROVING VEHICLE ‘OPERATIONS HANDBOOK LAV FLIGHT UNIT PARTIAL DRAWING LIST (FOR REFERENCE ONLY) DESCRIPTION Flight Vehicle Assenbly Chassis Assembly Tripod Fender Crew Station Installation Suspension and Wheel Installation Steering Installation Electrical and Battery Installation Electrical Cabling Installation Display and Control Console Assembly Gyro and SPU Installation Vehicle Attitude Indicator Installation Thermal Insulation Installation Gyro Thermal Strap SPU Thermal Control Unit DCE Assembly Hand Controller Assenbly Traction Drive Assenbly Space Support Equipment (SSE) DRAWING NUMBER 209-35006 209-3006 209-30406 209-31625 209-31006 209-5206 209-38306 209-34006 209-35106 209-2220 209-34306 209-60080 209-34406 209-70019 209-70400 7553139" 75530678 7553102" 209-2000 ‘Denotes AC/Delco Electronics Drawings, All Others are Boeing Mission __J_ Basic Date 4/19/71 _ Change Date myn Page vill Ls006 002-24 LUNAR ROVING VEHICLE OPERATIONS HANDBOOK SECTION I GENERAL INFORMATION 1.0 INTRODUCTION [his section contains general information pertaining to the flight operational tunar Roving Vehicle (LRV). where applicable, the iG Trainer differences ore oted. Detailed performance data for the LRV'and 1G Trainer are presented In Appendix A and Appendix 8, respectively Vl DESCRIPTION The LRV system on the lunar surface consists of the LRV, the structure for fgcuring the LRV to the LM stowage bay and the mechanism for deploying the LRV from the LM onto the lunar surface. 1.2 VEHICLE SYSTEMS The LRV system is comprised of the Mobility Subsystem, Electrical Power Subsystem, Control and Display Console, Navigation Subsystem, Crew Station, Thermal Control Subsystem and Space Support Equipment. Each subsystem is described in subsequent sections to the extent necessary to understand the operation of the LAV. ***1G Trainer Notets* 1G Trainer vehicle systems are shown on Figure 1-2, Basic Date 12/4/70 Change Date _6/23/71_ Page 1-1 Mission Ls006 002-24 LUNAR ROVING VEHICLE APOLLO OPERATIONS HANDBOOK O om © euesutin © sain se 1 SES ae e000 FIGURE 1-1 DEPLOYED LRV WITHOUT STOWED PAYLOAD (SHEET 1 OF 2) Nission__J Basic Date _12/4/70__Cnange Date __6/23/71_ age 1-2 1006-02-24 LUNAR ROVING VEHICLE OPERATIONS HANDBOOK (@ 40 2 1334S) avoTAVa G3NOLS LNOHLIN AW7 O3A0TEIO—L-L_BUNOLA -3ss_s30n79x3 “suuoadns avOTiYd S3TWRLLVE S300 7DNT« 8 NOIL¥901 “9° 1-3 6/23/71 Page 12/4/70 _ Change Date Basic Date Q Mission s006-002-2H LUNAR ROVING VEHICLE OPERATIONS HANDBOOK FIGURE 1-2 16 TRAINER Dass © ran sre ® vom axe So ae Misston___J Basic Date __12/4/70__ change date _4/19/71_age 1-8 Ls006-002-2H LUNAR ROVING VEHICLE ‘OPERATIONS HANDBOOK 1.3 MOBILITY suBsySTEM The mobility subsystem (figure 1-3) consists of the chassis and equipment and Controls necessary to propel, suspend, brake and steer the LAV. 1.3.1 Wheel Each wheel (figure 1-4) includes an open wire mesh tire with chevron tread covering 50 percent of the surface contact area, The tire inner frame Provides a stiff load path to accomodate high impact loads. Each wheel has a decoupling mechanism (figure 1-5, sheet 1) and can be de- coupled from the traction drive by uperating the two decoupling mechanisms which allow the wheel to "freewheel about a bearing independent of the drive train. This decoupling mechanism can also be used to re-engage the wheel with the traction drive. Decoupling disables the brake on the affected wheel. Procedure used to decouple a wheel is discussed in Section 2.9 “1G Trainer Notes*** 1. The 16 Trainer tires for primary use are pneumatic automobile tires (Figure 1-4-1). Special wire mesh wheels are also available for use with the 16 Trainer. The 16 Trainer has simulated whee? decoupling mechanisms to duplicate the LRV-to-Crew interface. Operation of this similated mechanism, however, will not effect actual decoupling. Procedures for 16 Trainer wheel decoupling are shown in Section 8. Wheel decoupling on the 16 Trainer does not dis- able the brake on the affected wheels. 1.3.1.1 Whee? Bulge Retention hen the LRV is folded for stowage in the LM the front and rear wheels are compressed together. As a result the wire mesh tends to bulge outward toward the LM quadrant. This outward bulge in the direction of the LM is controlled to prevent violation of the allowable LRV stowage envelope. Control of wheel bulge is accomplished by two wires installed in the wheels as shown in Figure 1-4.2, Upon deployment of the vehicle and unfolding of the wheels the wheel bulge retention wire is released and the wheel assumes its normal configura - tion. While driving the wheel bulge retention wires may break due to rubbing across the tire inner frame. Upon breaking these wires may come out of the inner tire and hang loose on the inside of the wheel. This is a completely Normal occurrence and will cause no detrimental operation of the LRV. asic Date 12/4/70 change Date 6/23/71 Page _1-8 Mission 1.5006-002-24 LUNAR ROVING VEHICLE OPERATIONS HANDBOOK 1.3.2 Traction Drive Each LRV wheel is provided with a separate traction drive (figure 1-5), consisting of a harmonic drive gear reduction unit, drive motor and brake assembly. Each traction drive is hermetically sealed to maintain a nominal 7.5 PSIA internal pressure for improved brush lubrication. Each traction drive also contains an odometer pickup which transmits a pulse to the navi- gation subsystem at the rate of nine pulses per wheel revolution. Traction drive installation details are shown in Figure 1-6. Mission J __ Basic Date 6/23/71__ Change Date Page 1-5.) Ls006-002-2H LUNAR ROVING VEHICLE OPERATIONS HANDBOOK me oust 7 geting Aro ‘ant oh) oe imesen : FIGURE 1-3 MOBILITY SUBSYSTEH Fassron__d Gasic vate _12/4/70__ cane date __4/19/T1___ rage: 1-6 Ls006-002-24 LUNAR ROVING VEHICLE OPERATIONS. HANDBOOK 25.5 DIA TRE. INNER FRAME (BUMP TOP TURE OUTER RANE CHEVRON Rivers VIEW AB FIGURE 1-4 LAV WHEEL CROSS-SECTION Mission___d Basic date __12/4/70__ Cnange date __6/23/7) Page L (2 40 2 L33HS) 3411 OL.VWI3Ns ONY T3DHM USNIVEL SLL t 3uno1d W-¥ NOTL2aS SOME U9 ¥3INI9 1708 i S3HONI $02” “Vid 310H xvas ATIvNDa S3T0H ZL “vid S3HONI $L°9L Ls006-002~24 LUNAR ROVING VEHICLE ‘OPERATIONS HANDBOOK SaHONI 0°62: SHON 78 HAGA FALL WOWIXWH 1-8 Page 6/23/71 12/4/70_ Change Date Basic Date Mission s006-002-24 LUNAR ROVING VEHICLE ‘OPERATIONS HANDBOOK DIRECTION OF SECTIONAL VIEW "AY ‘STOWED CONDITION OF LAV : te SWAGE BALL CABLE SECTIONAL VIEW "AY WHEEL BULGE CABLE DETAIL FIGURE 1-4.2 WHEEL BULGE RETENTION Mission Basic Date 12/4/70 Change Date _6/23/71_ Page .s006-002-2H LUNAR ROVING VEHICLE OPERATIONS HANDBOOK DECOUPLING MECHANISM- FREE -WHEELING BEARING RIVE MOTOR CIRCULAR SPLINE: HARMONIC DRIVE WAVE GENERATOR FLEXIBLE SPLINE: SUSPENSION SYSTEM ATTACH FITTINGS FIGURE 1-5. LRV TRACTION DRIVE ASSEMBLY Mission, 2 Basic Date _12/4/70___ Change Date __ 6/23/71 Page 1-9 Ls006~002 2H LUNAR ROVING. VEHICLE ‘OPERATIONS HANDBOOK 1G TRAINER TRACTION DRIVE ASSEMBLY FIGURE 1-5 Mission J Basic Date 12/4/70 _ change Date _ 6/23/71 Page 1-10 Ls006-002-24 LUNAR ROVING VEKICLE OPERATIONS HANDBOOK MOTOR CONTROL CABLE DRIVE MOTOR ODOMETER CABLE FIGURE 1-6, TRACTION URIVE INSTALLATION Mision asic Dote __12/4/70_ Change Date __4/19/71__ Page 1-11

You might also like