You are on page 1of 2
vue JOPERATORS MANUAL| MAINTENANCE SCHEDULE AND LUBRICATION CHART The following is a list of required regular maintenance for the HAAS VF Series Vertical Machining Centers. Listed are the frequency of service, capacities, and type of fluids required. These required specifications must be followed in order to keep your machine in good working order and protect your warranty. FOR THE VF-SERIES INTERVAL MAINTENANCE PERFORMED DAILY ¥ Check coolant level. Check way lube lubrication tank level. ~ Clean chips from way covers and bottom pan. Clean chips from too! changer Wipe spindle taper with a clean cloth rag and apply light oil WEEKLY ~ Check automatic dump air line's water trap for proper operation. Y Check air gauge/regulator for 85 psi ~ Check aluminum air filters on control heat exchanger and at top of spindle motor. ¥ Clean exterior surfaces with mild cleaner. DO NOT use solvents. MONTHLY ~ Inspect way covers for proper operation and lubricate with light oil, if necessary. ~ Clean the upper screen on the coolant tank, Remove the middie plate on the tank and remove any sediment inside the tank and clean the inet fiter to the rotary pump. Be careful to disconnect, the coolant pump from the controler to POWER OFF the control before working on the coolant tank. ¥ Dump the oil drain bucket. ¥ Place a dab of grease on the outside edge of the Geneva wheel star and guide rails of the tool changer and run through all tools. ¥ Place a dab of grease on the V-flange of tools. Y Replace coolant and thoroughly clean the coolant tank. ¥ Check oil level in gear box by adding oil until it begins dripping from the drain tube. ~ Lubricate counterweight chains with Mobil Vactra #2 over full legnth of chain, ¥ Inspect chain for any abnormal wear or cracks. ANNUALLY ¥ With the air pressure OFF, disassemble and clean the small filter at end of lubricator (left side ‘of machine). ¥ Replace the gearbox oil. Drain the oil from the bottom of the gearbox. Slowly refill with oil until it overflows at bottom of the heastock, ~ Check way lube covers; oil if necessary. ~ Check oil filter and clean out residue at bottom of filter. RE vmc OPERATORS MANUAL. WAY LUBE AND PNEUMATICS TRANSMISSION COOLANT TANK Under the contro! panel at the rear of Above the spindle head | Front of machine ‘the machine Piston pump with 30-minute cycle time, Pump is only on when spindle is turning ‘or when axis is moving. Linear guides and ball nuts Transmission only 1-07. Tank 2-07. Tank 30 gallons Mobil Vactra #2 ‘Mobil OTE 25 Water solut synthetic ‘HAAS AUTOMATION, INC.

You might also like