You are on page 1of 7

USA SALES OFFICES

California
3155 Pegasus Drive
Bakersfield, CA 93308-6800
661.387.1449 | Fax 661.387.1624

Louisiana
103 Bluffwood Drive INTERNATIONAL
Broussard, LA 70518-3310 stocking distributors
337.839.2331 | Fax 337.839.2334 Canada
118 Common Court Logan Oil Tools
Houma, LA 70360-7982 9755 45th Avenue NW
985.868.7333 | Fax 985.868.7007 Edmonton, Alberta T6E 5V8
780.433.9957 | Fax 780.468.1979
North Dakota
4925 Highway 85 South Singapore
Williston, ND 58801 Logan Oil Tools Pte Ltd
701.572.0565 | Fax 701.572.0644 54 Loyang Way
Singapore 508747
Oklahoma 65.65428422 | Fax 65.65420477
424 South Eagle Lane
Oklahoma City, OK 73128-4225 United Arab Emirates
405.782.0625 | Fax 405.782.0760 Logan Oil Tools
Jebel Ali Free Zone (South)
Pennsylvania P.O. Box 23724
Headquarters 244 Grey Fox Drive, Suite 1 Dubai, UAE
Remington Square Office Building Montoursville, PA 17754 971.4.813.8000 | Fax 971.4.813.8001
10603 W. Sam Houston Parkway N. 570.546.1066 | Fax 570.546.0388
Suite 200 Woodhouse International
Texas P.O. Box 23724
Houston, Texas 77064-4362 USA
101 Commerce Street Dubai, UAE
832.386.2500 | Fax 281.227.1766
Alice, TX 78332-2904 971.4.347.2300 | Fax 971.4.347.4642
Sales and Manufacturing 361.396.0139 | Fax 361.396.0112
11006 Lucerne Street United Kingdom
11610 Cutten Road Logan Oil Tools, U.K. Ltd.
Houston, Texas 77016-1920
Houston, TX 77066-3008 Unit C1 Kintore Business Park
281.219.6613 | Fax 281.219.6638
832.602.2134 | Fax 832.286.4117 Kintore, Inverurie
Power Swivels Aberdeenshire AB51 0YQ
1305 Energy Drive
11620 Cutten Road Scotland
Kilgore, TX 75662-5539
Houston, Texas 77066-3008 +44.1467.631190
903.984.6700 | Fax 903.984.6755
832.602.2804 | Fax 832.286.4697
1617 South Viceroy Avenue
Odessa, TX 79763-5017
sales@loganoiltools.com
432.580.7414 | Fax 432.580.7656

Utah
1369 South 1100 East
Vernal, UT 84078-8600
435.781.2856 | Fax 435.781.2858

Tubular Wireline Jar


© 2012 Logan Oil Tools 1.5M/0812 R0
Contents

Logan Tubular Wireline Jar


Overview................................................................................ 2
Uses....................................................................................... 2
Construction........................................................................... 2
Operation................................................................................ 2
Tool Illustration....................................................................... 3
Maintenance........................................................................... 4
Disassembly........................................................................... 4
Assembly................................................................................ 4
Specifications and Parts Lists................................................ 5

LEGAL NOTICE
All references to Bowen® part numbers in this literature are
used to identify interchangeable tools and parts. Reference to
such tools and parts does not imply that Logan Oil Tools is a
licensee or is in any way affiliated with National Oilwell Varco.
Logan Oil Tools does not sell, or offer to sell, National Oilwell
Varco (Bowen) products.

“Bowen” is a registered trademark of National Oilwell Varco.

1st Printing, August 2012. Rev. 0

Logan Tubular Wireline Jar • 1


OVERVIEW OPERATION With the Jar is in the closed position,
The Logan Tubular Wireline Jar is a To provide an effective means to bump an upward strain is placed on the
straight-pull actuated jar that has no up or down, whichever may be required wireline to pull the mandrel upward. The
restricted stroke. The simple and rug- during the operation, a Logan Tubular upward jarring blow transmits energy
ged Logan Tubular Wireline Jar may be Wireline Jar may be assembled in the to the tools installed below the Jar.
used alone or in combination with the string immediately above the Hydraulic The transmitted jarring force is propor-
Logan Hydraulic Wireline Jar. This com- Wireline Jar to provide a convenient tional to the strain taken on the string.
bination of tools is particularly useful in way of bumping down. This combina- A greater strain on the string increases
permanent well completion operations tion assures the operator of being able the intensity of the blow, while a lighter
when the ability to jar both ways is es- to jar up or down if needed during the strain on the string will lessen the inten-
sential. operation. sity.

It is recommended that several sinker WARNING: At no time during the pull


USES cycle should the maximum recom-
bars with an outside diameter that
The Logan Tubular Wireline Jar, when corresponds to the Jar be assembled mended load be exceeded. Refer to
used in combination with the Logan Hy- above the tool to provide the neces- Chart A – Strength Data on page 5 for
draulic Wireline Jar, is particularly useful sary weight for sufficient impact during pull loads.
in permanent well completion to aid in operation. The weight of the sinker bars An upward strain on the wireline is
pulling, fishing, or gas lift operations. will determine the intensity of the jarring created by reeling the hoist until the
Upward jarring with this combination blowand also aid in closing the Jar with wireline is stretched. Set the hoist brake
is done in the usual manner with the minimum time delay. The assembled and wait for the Jar to strike. After the
Logan Hydraulic Wireline Jar. tool is run into and out of the well like Jar has struck, slack off the string to
any other fishing tool but on measuring allow the Jar to close.
CONSTRUCTION line or stranded wireline.
The Logan Tubular Wireline Jar is com- Repeat the jarring action by pulling an-
The zero point or depth measuring other strain on the string. The frequency
posed of a top sub, link body, mandrel,
reference should take the stroke length of the blows struck can be as rapid as
and a bottom sub with set screw.
of the Jar into account. Otherwise, no the operator can pick up and slack off
The top sub is constructed with wrench special precautions or considerations the running string. The operation can
flats and a fishing neck. A lock pin are necessary. The stroke length of be repeated as needed to free the stuck
secures the mandrel to the top sub each Jar is listed on page 6. The stroke tool.
and provides safety against loosening length of a Jar can be checked by mea-
and backing off during operation during suring its length when it is open and To Jar Down
operation. closed. The difference between these The tools are assembled and run in the
two measurements is the stroke length. hole in the usual manner and the fish or
The link body is perforated to elimi- equipment is engaged.
nate fluid cushioning and mud packing The Logan Tubular Wireline Jar is actu-
while in service. The link body bottoms ated either manually or by the use of a Manually pull or use a reel to position
against the bottom sub when it closes reel. The Jar is positioned by pulling or the Logan Tubular Wireline Jar. Sudden
on the down stroke. reeling. Sudden release or rapid unreel- release or rapid unreeling will cause
ing causes the weight of the Jar and the weight of the Jar and sinker bars to
The mandrel has an integral knocker at close the Jar. As the Jar closes on the
sinker bars to close the Jar.
its upper end. The knocker strikes the down-stroke, a sharp downward blow
lower end of the link body at the end of To Jar Up will be delivered when the link body bot-
an up-stroke to produce impact. The tools are assembled and run in the toms against the bottom sub.
hole in the usual manner and the fish or
equipment is engaged. Upward jarring Repeat the jarring action by pulling an-
with the Logan Tubular Wireline Jar is other strain on the string. The frequency
done in the same manner as with the of the blows struck can be as rapid as
Logan Hydraulic Wireline Jar. the operator can pull up and release the
running string.

2 • Logan Tubular Wireline Jar


Link Body

Mandrel

Set Screw (Qty. 2)

Bottom Sub

Logan Oil Tools reserves the right to change or discontinue designs without notice.

Logan Tubular Wireline Jar • 3


MAINTENANCE ASSEMBLY
The Logan Tubular Wireline Jar should The Logan Tubular Wireline Jar is easily
be disassembled, cleaned, inspected, assembled using standard shop tools.
and reassembled after each use. Make sure all parts have been thor-
oughly cleaned, inspected, and lubri-
Apply thread dope to the threaded joints
cated prior to assembly. Replace any
and coat the mandrel with grease at
damaged or worn parts.
reassembly. To prevent corrosion, all
exposed surfaces should be cleaned, 1. Secure the link body horizontally
and greased or painted prior to storage. in a suitable vise. Clamp near the
center of the link body.
DISASSEMBLY
2. Attach the top sub. Wrench only
Disassembly should be conducted in a on the wrench flats.
clean, well-equipped shop. Proceed as
follows: 3. Insert the lock pin into the top sub.

1. Secure the Jar horizontally in a 4. Carefully slide the mandrel into


suitable vise. Clamp near the the link body and top sub.
center of the link body. CAUTION: Be careful not to scratch
2. Loosen and remove the set screw or gouge the polished mandrel sur-
from the bottom sub. face.

3. Remove the bottom sub. 5. Install the bottom sub.

4. Unthread the mandrel from the top 6. Insert the set screw into the bottom
sub. sub.

5. Carefully slide the mandrel from


the link body and set it aside.

CAUTION: Be careful not to scratch


or gouge the polished mandrel sur-
face.

6. Using a punch, remove the lock pin


from the top sub.

7. Remove the top sub. Wrench only


on the wrench flats.

4 • Logan Tubular Wireline Jar


TUBULAR WIRELINE JAR
OUTSIDE DIAMETER 1-1/8 1-1/4 1-1/4 1-1/2 1-1/2 1-3/4 1-3/4
CONNECTIONS 5/8 15/16 15/16 15/16 15/16 3/4 3/4
PIN UP - BOX DOWN 11 THD 10 THD 10 THD 10 THD 10 THD SR SR
LENGTH OF STROKE (INCHES) 18 20 30 20 30 20 30
COMPLETE ASSEMBLY Logan Part No. 700-000-018 701-001-020 701-001-030 701-002-020 701-002-030 701-003-020 701-003-030
Bowen No. 19355 12350 12350 10689 10689 14235 14235
TOP SUB Logan Part No. AM1000 AM1001 AM1001 AM1002 AM1002 AM1003 AM1003
Bowen No. 19356 12351 12351 10677 10677 14236 14236
BODY Logan Part No. AM2000 AM2001 AM2001 AM2002 AM2002 AM2003 AM2003
Bowen No. 19357 12352 12352 10758 10758 14237 14237
MANDREL Logan Part No. AM3000 AM3001 AM3001 AM3002 AM3002 AM3003 AM3003
Bowen No. 19358 12368 12368 10924 10924 14232 14232
BOTTOM SUB Logan Part No. AM4000 AM4001 AM4001 AM4002 AM4002 AM4003 AM4003
Bowen No. 19359 12356 12356 10678 10678 14233 14233
SET SCREW Logan Part No. AV19000-001 AV19000-001 AV19000-001 AV19000-001 AV19000-001 AV19000-001 AV19000-001
Quantity 2 2 2 2 2 2 2

OUTSIDE DIAMETER 1-7/8 1-7/8 2-1/8 2-1/8


CONNECTIONS 3/4 3/4 7/8 7/8
PIN UP - BOX DOWN SR SR SR SR
LENGTH OF STROKE (INCHES) 20 30 20 30
COMPLETE ASSEMBLY Logan Part No. 701-004-020 701-004-030 701-005-020 701-005-030
Bowen No. 21430 21430 11551 11551
TOP SUB Logan Part No. AM1004 AM1004 AM1005 AM1005
Bowen No. 21431 21431 11547 11547
BODY Logan Part No. AM2004 AM2004 AM2005 AM2005
Bowen No. 21432 21432 11544 11544
MANDREL Logan Part No. AM3003 AM3003 AM3004 AM3004
Bowen No. 14232 14232 11531 11531
BOTTOM SUB Logan Part No. AM4004 AM4004 AM4005 AM4005
Bowen No. 21433 21433 10732 10732
SET SCREW Logan Part No. AV19000-001 AV19000-001 AV19000-001 AV19000-001
Quantity 2 2 2 2

Logan Oil Tools reserves the right to change or discontinue designs without notice.

Logan Tubular Wireline Jar • 5


USA SALES OFFICES
California
3155 Pegasus Drive
Bakersfield, CA 93308-6800
661.387.1449 | Fax 661.387.1624

Louisiana
103 Bluffwood Drive INTERNATIONAL
Broussard, LA 70518-3310 stocking distributors
337.839.2331 | Fax 337.839.2334 Canada
118 Common Court Logan Oil Tools
Houma, LA 70360-7982 9755 45th Avenue NW
985.868.7333 | Fax 985.868.7007 Edmonton, Alberta T6E 5V8
780.433.9957 | Fax 780.468.1979
North Dakota
4925 Highway 85 South Singapore
Williston, ND 58801 Logan Oil Tools Pte Ltd
701.572.0565 | Fax 701.572.0644 54 Loyang Way
Singapore 508747
Oklahoma 65.65428422 | Fax 65.65420477
424 South Eagle Lane
Oklahoma City, OK 73128-4225 United Arab Emirates
405.782.0625 | Fax 405.782.0760 Logan Oil Tools
Jebel Ali Free Zone (South)
Pennsylvania P.O. Box 23724
Headquarters 244 Grey Fox Drive, Suite 1 Dubai, UAE
Remington Square Office Building Montoursville, PA 17754 971.4.813.8000 | Fax 971.4.813.8001
10603 W. Sam Houston Parkway N. 570.546.1066 | Fax 570.546.0388
Suite 200 Woodhouse International
Texas P.O. Box 23724
Houston, Texas 77064-4362 USA
101 Commerce Street Dubai, UAE
832.386.2500 | Fax 281.227.1766
Alice, TX 78332-2904 971.4.347.2300 | Fax 971.4.347.4642
Sales and Manufacturing 361.396.0139 | Fax 361.396.0112
11006 Lucerne Street United Kingdom
11610 Cutten Road Logan Oil Tools, U.K. Ltd.
Houston, Texas 77016-1920
Houston, TX 77066-3008 Unit C1 Kintore Business Park
281.219.6613 | Fax 281.219.6638
832.602.2134 | Fax 832.286.4117 Kintore, Inverurie
Power Swivels Aberdeenshire AB51 0YQ
1305 Energy Drive
11620 Cutten Road Scotland
Kilgore, TX 75662-5539
Houston, Texas 77066-3008 +44.1467.631190
903.984.6700 | Fax 903.984.6755
832.602.2804 | Fax 832.286.4697
1617 South Viceroy Avenue
Odessa, TX 79763-5017
sales@loganoiltools.com
432.580.7414 | Fax 432.580.7656

Utah
1369 South 1100 East
Vernal, UT 84078-8600
435.781.2856 | Fax 435.781.2858

Tubular Wireline Jar


© 2012 Logan Oil Tools 1.5M/0812 R0

You might also like