You are on page 1of 1

After Jack Down - Out of roundness

Measured radii(mtr)
Difference b/w Difference As per API
Measured radii(mtr) Measured radii(mtr) on 05.02.2022 shell to Actual Radius
Station Shell course Height/Level column F&D in in mtr b/w 653 table
on 17.07.2021 on 19.12.2021 annular fit up before required in Mtr
mtr F&H 10.2
welding
A B C D E F G H I J

At 11250 mm from shell to


1 Five annular weld 16.526 16.524 16.538 0.012 16.5 0.038 ±57.15
At 11250 mm from shell to
2 Five annular weld 16.53 16.516 16.534 0.004 16.5 0.034 ±57.15
At 11250 mm from shell to
3 Five annular weld 16.477 16.459 16.497 0.02 16.5 -0.003 ±57.15
At 11250 mm from shell to
4 Five annular weld 16.519 16.522 16.531 0.012 16.5 0.031 ±57.15
At 11250 mm from shell to
5 Five annular weld 16.503 16.518 16.52 0.017 16.5 0.02 ±57.15
At 11250 mm from shell to
6 Five annular weld 16.489 16.531 16.527 0.038 16.5 0.027 ±57.15
At 11250 mm from shell to
7 Five annular weld 16.496 16.508 16.501 0.005 16.5 0.001 ±57.15
At 11250 mm from shell to
8 Five annular weld 16.461 16.464 16.46 -0.001 16.5 -0.04 ±57.15
At 11250 mm from shell to
9 Five annular weld 16.506 16.501 16.507 0.001 16.5 0.007 ±57.15
At 11250 mm from shell to
10 Five annular weld 16.506 16.488 16.493 -0.013 16.5 -0.007 ±57.15
At 11250 mm from shell to
11 Five annular weld 16.514 16.497 16.516 0.002 16.5 0.016 ±57.15
At 11250 mm from shell to
12 Five annular weld 16.521 16.528 16.537 0.016 16.5 0.037 ±57.15