You are on page 1of 14

Site Safety Supervisor

Competency Course

Part V(D) –
Site Management Risk
Management – PTW & LOTO

1
Course Learning Objectives

Assist the Employer to:

Implement Implement
PTW LOTO

2
Topics to be Covered

 Introduction
 Permit-to-Work
 Lock-Out Tag-Out

3
Introduction

 PTW is a formal documented system of work


used to control certain types of work that are
potentially hazardous.

 LOTO is an energy control program for


isolating source of power and generally used
in plant and machinery maintenance.

4
Permit-to-Work (PTW)

5
Permit-to-Work (PTW)
Essential Features

6
Permit-to-Work (PTW)
Examples

7
Permit-to-Work (PTW)
Permit No:

8
Permit-to-Work (PTW)

9
Lock-Out Tag-Out (LOTO)

 Durable to withstand wear.


 Substantial, so it won’t come off easily.
 Capable of identifying the person who applied it.

10
Lock-Out Tag-Out (LOTO)

11
Lock-Out Tag-Out (LOTO)

 Except in emergencies, only the person who


attached the lockout device may remove it.

12
Summary

• Under certain hazardous conditions and


situations stringent measures under
administrative controls are required.

• PTW is normally applies for high risk


Summary activities and in presence of
hazardous atmosphere.

• Mostly LOTO is applicable for maintenance


or power operated machinery and plant.
13
14