PROGRAM
SR. PRODUCT TOTAL PROCESS SETTING
NO. ERP Code DESCRIPTION QTY NAME TIME IN
MINUTES
Total Production
Breakdown details & Time (If any):
Authorised By :
Prepared By : MR/Department Head
Format No. :
chine Shop Production Report F/MCN/04/Rev. : 01/Dt. : 05-12-2021
LODING
CYCLE UNLODING TOTAL TOTAL OK REWORK REJECTION MATERIAL
TIME IN TIME IN CYCLE TIME PRODUCTION MATERIAL MATERIAL QTY Remarks
MINUTES IN MINUTES HOURS QTY QTY
MINUTES
1 1 182 3.03 76 0 0
2 1 254 4.23 2 0 0
190 3.17 2 0 0
Signature:
Total Prod
Breakdown details & Time (If any):
Authorised By :
Prepared By : MR/Department Head
Format No. :
Machine Shop Production Report F/MCN/04/Rev. : 01/Dt. : 05-12-2021
PROGRAM LODING
CYCLE TOTAL TOTAL OK REWORK
SETTING UNLODING REJECTION MATERIAL
TIME IN CYCLE TIME PRODUCTION MATERIAL MATERIAL
TIME IN TIME IN HOURS QTY
MINUTES IN MINUTES QTY QTY
MINUTES MINUTES
15 50 5 125 2.08 2 0 0
20 10 5 35 0.58 1 0 0
20 30 10 60 1.00 1 0 0
20 5 45 0.75 5 0 0
Signature: