You are on page 1of 5

Machine Shop Produ

Operater Name: Bhavin Dodiya Machine Model :

PROGRAM
SR. PRODUCT TOTAL PROCESS SETTING
NO. ERP Code DESCRIPTION QTY NAME TIME IN
MINUTES

1 Nut Stopper 76 Drilling 30

2 Brass Washer 2 Face,OD,Drilling,Tapping 248

3 Nut M55X1.5, M55X2 2 ID, Thread 190

Total Production
Breakdown details & Time (If any):

Authorised By :
Prepared By : MR/Department Head
Format No. :
chine Shop Production Report F/MCN/04/Rev. : 01/Dt. : 05-12-2021

CNC Shift: Day Date: 26 February 2022

LODING
CYCLE UNLODING TOTAL TOTAL OK REWORK REJECTION MATERIAL
TIME IN TIME IN CYCLE TIME PRODUCTION MATERIAL MATERIAL QTY Remarks
MINUTES IN MINUTES HOURS QTY QTY
MINUTES

1 1 182 3.03 76 0 0

2 1 254 4.23 2 0 0

190 3.17 2 0 0

Total Production Hours of the Day: 10.43

Signature:

Approved By : MR/Department Head


Machine Shop P

Operater Name: Thunga Rahul Machine Model :

SR. PRODUCT TOTAL PROCESS


ERP Code
NO. DESCRIPTION QTY NAME

1 Marcon Jaw 2 Milling

2 Clamping Pad 30100 Rework 1 Slot

3 Tailstock Base Assy. Clamping Pad Set 1 1 Redius,Slot

4 Tailstock Base Assy. Clamping Pad Set 2 1 Drilling,Slot,Counter

5 Base & Column Packing 5 Slot

Total Prod
Breakdown details & Time (If any):

Authorised By :
Prepared By : MR/Department Head
Format No. :
Machine Shop Production Report F/MCN/04/Rev. : 01/Dt. : 05-12-2021

VMC Shift: Day Date: 26 February 2022

PROGRAM LODING
CYCLE TOTAL TOTAL OK REWORK
SETTING UNLODING REJECTION MATERIAL
TIME IN CYCLE TIME PRODUCTION MATERIAL MATERIAL
TIME IN TIME IN HOURS QTY
MINUTES IN MINUTES QTY QTY
MINUTES MINUTES

15 50 5 125 2.08 2 0 0

20 10 5 35 0.58 1 0 0

30 2.5 10 42.5 0.71 1 0 0

20 30 10 60 1.00 1 0 0

20 5 45 0.75 5 0 0

Total Production Hours of the Day: 5.13

Signature:

Approved By : MR/Department Head


at No. :
01/Dt. : 05-12-2021

Remarks