You are on page 1of 31
JACOBS Comprimo® Sulfur Solutions Project No. : Client : Site Location : Project Name : Sulphur Recovery Unit 3500 Piping Specification 64514-00 Enercon SA Concon Refinery, Chile Sulphur Recovery Unit 3500 Document No. : 64514-00/P-02/9705/A4 Revision : 1 e as Prepared | Checked | Approved | — Client Rey. | Issue Date Re Deseript a fy ty foal 0 | Sept 05 |Forbasic design package Wz ‘SOFT 20) 1 | Jan.08 Final Basic Design Package | TVZ SOFT x \ JACOBS Comprime® Sutfur Solutions Project No. : 64514-00 Piping Specification Client Enercon SA 64514-00/P-02/9705/A4 Site Location: Concon Refinery, Chile Rev. 1 Project Name _: Suiphur Recovery Unit 3500 Page 2 of 31 TABLE OF CONTENTS 1.0 REVISION AND ISSUE SHEET 2.0 GENERAL 21 SCOPE 22 CODES 2.3 MATERIAL RATING 24 STANDARDS FOR PIPE 25 STANDARDS FOR VALVES 2.6 STANDARDS FOR FLANGES 2.7 STANDARDS OF FITTINGS 2.8 NACE STANDARD MR 01 03 (LATEST REVISION) 3.0 SELECTION OF PIPE CLASSES 34 ABBREVIATIONS 32 REQUIREMENTS FOR INDICATED SERVICE 3.2.1 Main Valve Type 3.2.2 Material Requirements 33 SELECTION OF PIPE CLASSES FOR CLAUS UNIT 3.4 SELECTION OF PIPE CLASSES FOR SULPHUR DEGASIFICATION UNIT. 3.5 SELECTION OF PIPE CLASSES FOR INCINERATOR UNIT 3.6 ‘SELECTION OF PIPE CLASSES FOR UTILITIES 4.0 PIPE CLASSES JACOBS Comprine® Sulfur Solutions ) Project No. : 64514-00 Piping Specification Giient : Enercon SA 64514-00/P-02/9705/A4 Site Location _: Concon Refinery, Chile Rev. 1 Project Name _: Sulphur Recovery Unit 3500 Page 3of 31 1.0 REVISION AND ISSUE SHEET Sheet] Descipion aie oT asus rovsion er First rev. | Rev. [Rov | nev Issue 1 DatayRequison shectCover sheet 1108 2 Table of contents +106 3 Revision arise sheot 1108 ) 4 General +108 5 Selection of pling classes “108. 6 Requirements “vos. 7 Selection of piping classes CLAUS 1108 8 Selection of piping classes Dogasiication | 108 2 Selection of ping classes incinerator__| 1108 10 __| Selection of piping classes Utitios +108 11__| Pipe cass oat +106 12 | Pipe class Oat +06 13 | Pipe class act 1105 +4 _| Pipe cass 81 “108. ) 15 __| Pipe class BE 1108 16 __| Pipe cass 8€1 1109 17 | Pipe cass 03 1108 18 __| Pipe cass 019 1108 19 _| Pipectass 80 +100 20__| Pipeciass 0 1108 21 | Pipe class oxt 1108 22 __| Pipe cass 8xt 108 23 | Pipe dass cat ‘109 24 __| Prpe cass cat ‘09 JACOBS Comprimo® Suttur Solutions ProjectNo. 6451400. ~~ Piping Specification Client Enercon SA 64514-00/P-02/9705/A4 Site Location: Concon Refinery, Chile Rev. 1 Project Name _: Sulphur Recovery Unit 3500 : Page 4 of 31 25 Pipe class OXt 1106 26 Pipe lass CX 106 a Pipe class CY “vos 28 Pipe lass CY1 +006 2 Pipe class G21 1006 20 Pipe lass 621 1108 a Pipe lass MAY 1106 >) 32 Pipe class MAT +106 ° 33 Pipe class NNT +106 ey Pipe class NMI +108 35 Pipa class UA +06 36 Pipe lass UA 106 s7 ‘tachments +108 “0 an L_ JACOBS Comprime® Sultur Solutions ‘ Project No. : 6454-00 ~ Piping Specification Client : Enercon SA 64514-00/P-02/9705/A4 Site Location = Concon Refinery, Chile Rev. 1 Project Name _: Sulphur Recovery Unit 3500 Page 5 of 31 2.0 GENERAL 24 SCOPE This specification covers the selection of pipe classes for the applicable unit(s). 22 CODES The piping design and materials shall be in accordance with ASME B31.3. ) 23 MATERIAL RATING Mechanical design temperature and pressure for each line are shown in the data sheets for piping. 24 STANDARDS FOR PIPE According to the applicable ASME and API standards. 2.5 STANDARDS FOR VALVES According to the applicable API, ASME or BS standards. 2.6 STANDARDS FOR FLANGES | | , Pressure/temperature rating of flanges shall be in accordance with ASME B 16.5 } and BS 3293, Flange facing: to be serrated finish unless otherwise noted. 27 STANDARDS OF FITTINGS According to the applicable ASME standards. 2.8 NACE STANDARD MR 01 03 (LATEST REVISION) Materials mentioned in BX, CX and/or CZ pipe class(es) are in accordance to NACE standard MR 01 03, latest revision, however, no certificates are required for materials outside the service limits, mentioned in the NACE standard. JACOBS Comprime® Sulfur Solutions ) Project No. : 64514-00 Piping Specification Client Enercon SA 64514-00/P-02/9705/A4 Site Location: Goncon Refinery, Chile Rev. 1 Project Name _: Sulphur Recovery Unit 3500 Page 6 of 31 3.0 ‘SELECTION OF PIPE CLASSES General notes 3.1 ABBREVIATIONS BFW : Boiler feed water AS 2 Alloy steel BL: Battery limit cs : Carbon steel FV: Full vacuum ss : Stainless steel HP: High pressure Bw : Butt Weld LP: Lowpressure FB : Full Bore 5 SAT : Saturated FL Flanged SUP : Superheated RB : Reduced Bore RF : Raised Face sw : Socket Weld OS&Y : Outside Screw and Yoke HIC —: Hydrogen Induced Cracking " NACE : National Association of Corrosion Engineers * SR: Stress Relieving PWHT : Post Weld Heat Treatment ® Notes: ”) HIC means for seamless piping that materials shall comply with below mentioned NACE requirements. NACE means that, in wet sour service, materials and hardness (also after bending and/or welding) shall comply with NACE Standard MR 0108 latest edition. ) . ‘SR means that after cold deformation of more than 5%, stress relieving shall be applied a PWHT means that post weld heat treatment is required after welding. SR and PWHT is applicable to all lean and rich solvent systems. JACOBS Comprimo® Sulu Solutions ) Project No. 64514-00 Piping Specification Client Enercon SA 64514-00/P-02/9705/A4 Site Location: Concon Refinery, Chile Rov. 1 Project Name _: Sulphur Recovery Unit 3500 Page 7 of 31 3.2. REQUIREMENTS FOR INDICATED SERVICE 3.2.1. Main Valve Type BF : Butterfly valve GV: Gate valve BFJ : Butterfly valve jacketed PV: Plug valve BV: Ballvalve PVJ : Plug valve jacketed 3.2.2. Material Requirements + Tracing for corrosion reasons is indicated on the process engineering flow schemes only. * Piping shall be carefully fitted and welded to avoid stress corrosion cracking by hydrogen sulfide and/or amines. ATIG root pass shall be specified for all pipe work. © Copper and copper-based alloys such as brass or bronze, Monel and aluminum- copper alloys shall not be exposed to amine solutions nor sour water/vapor. JACOBS Comprimo® Suttur Solutions \ Project No. : 64514-00 Piping Specification Glient Enercon SA, 64514-00/P-02/9705/A4 Site Location: Concon Refinery, Chile Rev. 1 Project Name _: Sulphur Recovery Unit 3500 Page 8 of 31 3.3 SELECTION OF PIPE CLASSES FOR CLAUS UNIT Page tot SERVE APPROK "REPRO | WENA FENG TSC HATERS NORMAL wormnc | desenconomons | ciass 'ANDIOR REMARKS ‘workPress. | Tewr-c vane FREE TEE Nota tern | +o ‘AcIO FEED GA os ” asey | 20 | exigent) | o5/1.0mmoon. a. oe) | ConraNnetos Noe 5V,8F trate) SWSFECD GAS oe © awrv | 200 | cxriemzy | o5/30mmconat tes CONTAINNG Hes Now ov.8e (vote?) ) UPsreausacker | 95 0 sarv | 200 | es S10 mm cor at ‘cio FEED GAS os 220 as | 20 | oxigen) | 03 /10mmeon. a Sowstreas By. 0 (not sete) | PREMEATER tw sounwaten os-25 wos [38 fam — | oxreenay | 08/30mmeon-a ip steam TRACED By process aaswon | ost woos [as | am — | oxremn | o5/s0mmeon at CORROSIVE NO VALVES Taw cas To or 18 as fo | exrceat | 08/1.0mmeor. a INCINERATOR NOVALVES, | coweusnon wa — | 070 » as 10 | eat 6$/.0mmoor. a Note 3) FROM BLOWERS) ov COMBUSTION AA [TP 30 35s ar CSTR DOWNSTREAM ov PREHEATER TP STERMPRODUED [OT co Ea] Oa CSO RRO a ev \ ) we sreaM aa 2st wr [ao | ow (68/4. 0nm col | SATURATED ev be srenu wa an wr |e | noes NovaLvEs HESTEAM oo 0 a TST TOR ca a CONDONED av uaupsunun — | 049-008 wese [as | am — | ov 68/21 mm cor. A. (N03) (oot) Now2 Py Urstemwancrereo | as a sary | o00 | wes $/ 10mm co Nias 1. For Process Systems dows nt shut of ave), owas Sumer and up 0 wast hea bor, schaia rergh © be basod ona pressure of 7.0;kglemd a stress of 0.9 hot yl {LP steam acketng design pressure i extemal dasn prassut fh inno pipe. CCoasion alone of ckoing ie ecemalcoroion allowance of ner rps (19 beaded to coresion lowarcs of nna ip). Foradltonal ator oquaments soe atchod N-pages ‘Special itr (opps iss spot) ‘Those nes are at stam jacketed ican flings and valves and provided with oversized tangas. Flanged crossing tube sed at change of drecton 7. Gavan paraiobe cates. Enon aves at bahay sa taco marin treat ttt 18, Only or the part that estar acketod pipe cle GX1 Sm cor all shal be used forthe Iner pipe (he same a or SWS Peesges) JACOBS Comprimo® Suifur Solutions Project No. :64514-00 Piping Specification Client : Enercon SA 64514-00/P-02/9705/A4 Site Location: Concon Refinery, Chile Rev. 1 Project Name _: Sulphur Recovery Unit 3500 Page 9 of 31 3.4 SELECTION OF PIPE CLASSES FOR SULPHUR DEGASIFICATION UNIT Page tof service apenox approx — | MECHANICAL PING NORMAL ‘workINe | Designcoxomons | cLAss workeness, } TEP BASIC MATERIALS. varma © ote "ANDIOR REMARKS press. | TEN, seme | wc DEGASSING AIR ove % 35 v9 Bat 81 1.0mm co a FROM BLOWER ov DEGASSING AIR 046 oy as 200 mat ‘5S /0mm coma ) DOWNSTAL FILTERS, Now 1 Pv STEAMJACKET 25 us 53 200 MAL SS) 01mm com VENT GAS TO 0.00 132 as 20 cain) | 08/2x1 mm con a. (Note 4) INCINERATOR Nate 1 Pus (note) LP TRACED Lpsteawiaceet | 35 18 saev__| 200 Bot 63/10 moor. tuguio suLPHUR 45 0 50 10 ow 651214 nm coal. (Note 4) (nate 5) Note Pv UPSTEAM JACKET a5 8 sarv__| 200 pcr (6814.0 mm cot a Noles 4. _LP soar acketing design pressure is extra design pressure fhe inne be. 2. ‘Theo lines ae proved wit LP steam vacng ard pry jacking (ony tight ne parts inated on P&I), 5. Forarton matoalequlronents soe alae Mpages 4. Conoson alowarce of aeksing fe extemal coves alowance cone ipa (abe acted to coreson allowance ol ner ip). 5 Thos ines so fl UP etea acted Inacng ins ad waves and povided wih oversled vals, downsrar he ur pumps langad lbows meta of fangod crosing maybe 03, JACOBS Comprimo® Sulfur Solutions Project No. : 64514-00 Piping Specification Client Enercon SA 64514-00/P-02/9705/A4 Site Location: Concon Refinery, Chile Rev. 1 Project Name _: Sulphur Recovery Unit 3500 Page 10 of 31 3.5 SELECTION OF PIPE CLASSES FOR INCINERATOR UNIT Pago ot senvice APPROX apenox | MECHANICAL PPIs NORMAL ‘worcnc | Desinconpmons — | cLass workeress, | Tene BASIC MATERIALS ba, © Notes ANDIOR REMARKS, press. | Teme. toro c ‘TAI GAs FROM oor v8 3s 200 ext $11.0: oma CLAUS UNITES), Fs, Pus VENT GAs FROM 0.00 10 as 20 cz (08/241 mm coma ‘SULPHUR DEGASSING Noto 1 Note2 (nota) LPTRAGED Upsremmsacker | as 9 sary 200 sor 6814.0 mm com. al FLUE GAS FROM Nowe InGINERATOR TO | 005 sis | aM, 70 | News 68 /1.0mm oor at STACK VIAHP STEAM 400 tes. LP team jacketing design proseure ls exemal design prossue of th ener pps. 1 2. Comrcsion alowance acting extra corrosion atowance ol inna pipe (© be ado to core allowance ct Ine pipe), 3. Foradktona metetlfequrements sos atechod M-pagos ‘4 Spectator (no ipsa spect). 5 Those Inge are provided wih LP loam tracing an party keting (a nctedon PD), only stalght pats are star 6. Benign tmperatre of 70°C frre inside pipa mater design trpacaturefor ping 400; JACOBS Comprimo® Sultur Sotutions ) Project No. 64514-00 ne Piping Specification Client Enercon SA 64514-00/P-02/9705/A4 Site Location: Goncon Refinery, Chile Rev. 1 Project Name _: Sulphur Recovery Unit 3500 ____ Page 11 of 31 3.6 SELECTION OF PIPE CLASSES FOR UTILITIES Page tot appnOX approx | Mechanica. NORMAL WoRKINa | DESIGN CONoITIONS workeress, | TEMP Prine | Basic maTERIALS Keene g © class | ANOIOR REMARKS press | TEMP, Komen | °c FucLaAsFRomaL — | 425 48 78 7 Bet 65/1.0 mm com MMEADER bv ) NaTuRALGAS FROM | 5025 2 a « et 8/10 mmcor a ) SUHEADER v NITROGENHEADER — | 30 a 4s 140 Ber 68/1.0mm cor a. ov INSTRUMENT AR 435 a too 6 unt CS (gnhanizes) PLANT Aly 20 a 100 5 Bat 81 1.0mm cor a SERVICE AR Br@v coouNna waren 15 25 35 0 Bat 8/10 mmeor a Br.@v HP BOLER FEED ero 10 182 16 20 (08) .0mm coral WATER ov westeawtornow | 25 170 53 280 ect (08/1.0mm coma BL ov westean 20 sar sar 200 scr (08/10 mm cor at (CONDENSATE: ov te sremwtoraon — | 410 90 ana 410 38 (081.0 mm com a ) BL, ov wp stem 434/38 asia | sesev/s3 | siora | eieect | 037 1.0mmeor.a ‘CONDENSATE 7” wv UUPSTR. /DOWNSTR. coxyeen Notes nwt 8S 6mm Monet Lp bowen FEED 187 110 107 16 as 68/1 mm co a WATER FROM Bi. ov venraastosoun | os % a6 200 ext 68/1 mm oor al FLARE. Br. 8 Me STEAMTO BL. ‘4 20 180 49 as 68/1 mm oor a e __lewv Notes 1. For future connection. No info avalabo at his tie. JACOBS Comprimo® Sultur Solutions Project No. 64514-00 7 Piping Specification Client : Enercon SA 64514-00/P-02/9705/A4 Site Location: Concon Refinery, Chile Rev. 1 Project Name _: Sulphur Recovery Unit 3500 Page 12 of 31 4.0 PIPE CLASSES BAI Page 1 2 PIPE CLASS BAI CARBON STEEL / ASME 150 LB Pipe aia Caan seat T Homobesize as ate me cate! | w see0 me sunuerseaioncr | aye. sao Mana 8 ante | 26 son 20 raseg se 108 | 20 2 welded [ASTI AB?2GR. BSS or B60 C22. | APL. oF APISL GA 8 Figs [tows 00°75 [ASTIN AD WP REET Seamena a OE | fut | Sraigne/Red Tees | 524" ASTI AZ34 WEBW Note wois | necicereoape iangoe_| Waiting neck aind—[RSTAVA TOS ASKED 165 TODA aaa OIE Natee ‘Gaskets Fat ing or HF Tangss | Compressed gana ABTSTS [ASME B 16.21 \ larinato tana 6 ) Boing —| Sea bas ‘Sess -ASTHTA TOE oF Stud OS 40 Tiisad ass ASME RTT OBS TeBD | 8S 40287 Nite ASME 6 18.2.20r 85.4002 | Skate clnes 24 Nua lass 28 Ne ASTAA 10424 oe [3s 400224 ‘Mains 1.Foroles see next sheet. RANCH CONNECTIONS so DEGREES 2 CCCCODDDDA 180 GGGEDDOA CODE EXMANATONOF CHARACTERS fo GceoDA = JACOBS Comprimo® Sultur Solutions Projecto, = 64514-00 Piping Specification Client Enercon SA 64514-00/P-02/9705/A4 Site Location: Concon Refinery, Chile Rev. 1 Project Name _: Sulphur Recovery Unit $500 Page 13 of 31 BAY Page20t2 PIPE CLASS BA1 CARBON STEEL/ ASME 160.6 trom [size | ype Construction Matai Dest emacs Connections Dimensions and Vaive raring Buea — [Fanaa | Water ype] 6 and ear Tay Dimensions TESTS | Coaane sumboton | Wrencnepentes | AsTinAzrewonrcr | aPtoosCat Bor API” | max 025% Been anges | 8 and lager feat TEIRTPE | 600Cat.A AF ASME 150, | Gear opted vet tot shut pe Die 1S 316 Notea67 ar Te —[Redieed bore [Free Bos WSS * Ceeiene Rangediit | fosing ba ASTM AgI6WoRC™ re 0.25% ASME 1501 | double sea or AST AOS" sons asia: Balls PTFE (ediored) —_[ASI316 Noi 24 a ee Baked bone! Boy and Boat — | BS SESE Coon SW 800% josey ASTM AzTe WCEIC™ ex 025% Rising harvest | or ASTI IOS F salar | Bat ype Sine 1% wT Farged RF ASME 18 a Note Tak TE | Pn pe Rader Banyan core — TOS TIET “Coon Sw coos ASTIE AIS WOBC* ax 025% crass ne F anager | SRG TS “Water ype: a Farge AE ASTM AIDS wax 025% ‘sie: 1501 Tem 19% Ge crate pa Suabie tote Eenvaon fanges BFASME 1501 Noa Woade [TTF — [oss nds poet | RT BST Teay ana bonnes BS HRE * Cotas ‘sce osay ASTI AOS ax 025% 'S¥ 0001 Fisngnandunest | Temes Ge Not es 1. Pio andamalora be ont i 0, sta of bows, wrorverpoatla [sign tte ae ace. tango ate ASME 8 16.5 mated! group 1.1 and reduces bore bal valve rang BS 53S1(PTFE seat) if ba valve PT ring has tobe higher, the bal va PT rating shall be 2s po manutaturor proposal and shal e approved by Contractor. Fort bore al valves, he YT rating ls equal hat of the nerest ager sia recucod bore bal vane ‘Above 200°C, gato valves toe sed Desig its ae ace ango rang ASME B 16 mate group 1.1 Fango facing roughness, Ra'3.2 68 um. ‘Dasa mts eo aos.AP160 Ca. or sotsoted bury valves, buoy va ating has tobe higher, te bute vale rT ating wil bess permanutactures propos ena shal be approve by contr. Desig mits or metal soto taster vaves ao ace. API 609 Ca. A and al eas per body prossre rating (large ating) or the frontal prossure tng whichever is ss. For temperatures above 200°C bute vaves wih metalic eat 0 be used above 250°C langod bute vals tbe used For hoaontl mounting on, Comprimo® Sultur Solutions \ : 7 Project No. = 64514-00 Piping Specification Client : Enercon SA 64514-00/P-02/9705/A4 Site Location: Concon Refinery, Chile Rev. 1 Project Name _: Sulphur Recovery Unit 3500 Page 14 of 31 Bot Page tof2 PIPE CLASS BC1 (CARBON STEEL / ASME 150 LB Pipe material Caron sea Nom.olge size Wat hioeess Vato mate! Cast stet we 52.00 ie mata 19% Cestet ro sa.40 | Main vate ype Gate valve wor Sch. 20 tg ASME 150.8 , Gorsenatowance an me ) Serve ins Temperturec | 50 75 100 125 150 175 200 250 300 360 | Neto? Prosurebarga [199 105 177 167 158 149 140 121 102 84 tem __| type Material Dimensions Remarks Pipe [ Seon ASTHATOEGEE ASME 835.10 Cents CO tro | Ebows S075" ‘STIR REE WP ASME B18 Contents max 0.25% Bus weld | Sighted. Ts Redes aot Coos Fangee | Wap TRERT oR — STATA TOS TERE B TES, SOBRE | Coonan aK OER NOT [Saskas — | Fang TorF Tangas | Caroresoad gaphie AST —[ASVEB T6Z7 16 laminae thoes Hie Taig —| Sao Studs“ ASTITA EBT OT] Suds - 8S 4007 raat: AVES TT OOS 5 4662 87 Nuts -ASMEB 18220 | 590 Nas-ASTINA 19620 [BS A682 Ss cass 26 is seea 24 Ns les 28 Noise 1.Fornotes seo next sneet, anc comNECTONS 90 DEGREES Se cecevoooban JACOBS Comprimo® Sulfur Solutions Project No. 64514-00 Piping Specification Client : Enercon SA 64514-00/P-02/9705/A4 Site Location: Concon Refinery, Chile Rev. 1 Project Name _: Sulphur Recovery Unit 3500 Page 15 of 31 8c Pege2ot2 PIPE CLASS BCI CARBON STEEL / ASME 150LB hom sie | typ0! construction Matera Design Remarks Connections Dimensions and Vane marking ‘ae Te aw aoa Fan anater Toay mdbomnat [85 952 Caniena ma Sotd wedge AST nzte WEB™ ozs fe andlrger or ASTM AIOS" “orhat sites Fee woos. Ths 13% Cr Bate bomet Farag |FangeshF | 08 8¥ asta ASME 150% | Fling som trough handel Note9 {an argo Ger operated Giabe TH [RE Pia ype | Soted bonnet Bosyandbonnat — [ESTE Ce ma sweooe — osay asta aate WCB ozo senghandntes! | orASTAATOS" oral sets F and aner | Bal ape Timcisce ISTH Flanged ASE 1501 Nes chek [TH [Paton pe | Ba Svar Toad ower [BS Geass PAE sw e005 ASTHARTE WOBIC* ro OrASTI AICS" oral stotes Te 3 Cr Nato 7 ara ar | Saha WP STB Cena ma Forges 025% ASME 150 ‘octal states Nees Notes Pipe # "and anal be bent Ff 50 instead of ebons, wherever ossble, Denign sae ace. angering ASME: B 16.5 material group 11 Flange aceg roughness, Aa 32-83 um. ‘Stoamraps be slocied by uty engineer. For horizontal mowing ony. JACOBS Comprime® Suifur Solutions 5 Project No. 64514-00 ~~ Piping Specification Client Enercon SA 64514-00/P-02/9705/A4 Site Location = Concon Refinery, Chile Rev. 1 Project Name _: Sulphur Recovery Unit 3500 Page 16 of 31 BEI Page tot2 PIPE CLASS BEI CARBON STEEL/ ASME 160.LB. Poe mate Caton ste ‘Nom sive size Walhckoass| ‘Valve mate Carson set wer eh. 00 Tein mati Staines toe 16 ‘50h 40 Wain valve 962 at Buterty ear ‘sen.20 ang ASME 150 6 Conesion allowance Mio } Serve its Fomperaurec | 5075 100 126 150 175 200 FLANGE/R® BALL VALVE RATIVG (@TFE SEATS) Presaursbarge | 195-185 17.7 167 158 149 110 opto And. 9 493 185 177 107 158 149 80 ‘in. Ginna, 198 185 177 187 158 120 70 Bin. 10m no, Note? Z e 103 185 177 160 120 80 50_ 2m. 16m te BUTTERFLY VALE RATING Prossuetarge | 199 185 177 107 158 101 43 {ree Sear Note 5.8 198 185 177 167 120 147, 0 RIFE SEAT, ean Notes Proscwetane | 199 105 177 167 158 149 140 FLANGE RATING tem Type atrial Dimensions Remarks Pipe Sears STW AToEGED ASHE 836.10 sorter a OD Fitings [tows "185" | ASTWUAZS4 WP ASHE D 189 /Scontens max 025% futweld | Swaigh/ Fed. Teos Reducers Neto 1 Caos Finger] Welsing neck Bind | ASTANA TOS SES TS, SOBRE Santen aK OR Tascam | Fiat gor Tangas | orapite TAS Sis arsnate —[ASMES T671 trcknase 16 ) Baking [Stas SUR ASIA TIT | Studs 55 2067 TRS SEE ASHE BT OFS THD 35 4282 57 Nute -ASMEB 10220 | Stas cass 20 Nule-ASTMA1o42Hor | BS aa8e te ones 23 8 4882 2 1.For notes ee net sheet ‘ANON CONNECTIONS 90 DEGREES EQUAL TEE SANSA NORE PLAN mre Tone BEI Page 2012 PIPE CLASS BEI JACOBS Comprimo® Sulfur Solutions Project No. :64514-00 Piping Specification Client Enercon SA 64514-00/P-02/9705/A4 Site Location: Concon Refinery, Chile Rev. 1 Project Name_: Sulphur Recovery Unit 3500 Page 17 of 31 (CARBON STEEL / ASME 150 LB tom | Size Type! Conetrction | ater Design marks Connections Dimensions and vatve marking Ba ses [RB a) Fire sao, Bog es sa5t + C-omtonts Finged AF ou sel ASTM ARIE WORE" max 025% ASM 1501 [ets endsoats: | or STA AOS OfPTFE (entree) | Baier Note 4 AI318 Globe RoPugt~e | Botedbomet | Body andtbomet ASTA | S352 + Gooronts Sw 600. osay neowont" max 025% Fesinghandwhos! | or ASTM A105" 2 andiagee |allype Te: 19% 9s 1873 *C-ontnts Flanged AF rau 025% ASME 15016 oto check tw | Ptr ope ote ener By a cover a8 sss2 + C-oments SW 800 [ASTREACIO WRI" or max 025% asm arose Note 2 andiarger | Suing ype “Wale ype 181060 0rApt564 |= C-oomtonts Fanged AF ASTIC AOS" imax. 025% ASME 10 rm: 13% Cr. ariel yp suitable Beeen anges AF ASE 1501 Noto 4 Node Loose reece point | Bokadtomnet | Body andbomet ASTI | BS 5052 + C-omtents se osay nos ax 020% S600 ising tarde Noto 4 surety — | 1crandtaner |-watertype ——onaropented | Body Dimensions 885155 | *C-contnts sutabtoo astm screwceic: JorAPionzeat 8 |max 025% Between farges AF Vion tring or sto ASME 15010 ‘TEEIRTFE seat ontshut- off pe Disc: S316 Nowa5s Natzs Pipe ard smal tbe bent Ais 80, stad of ebows, wherever posable 2. aslgn tsar ace. lange ting ASME B 16S matrlgrup 11 and teduced bore all vate eating BS 5961(PTFE ‘Seas) Fr fl bore all ves, ha P77 rating is auto that of th nearest ger 6 redecs bore tl va, Desig mis ar ee, lange rating ASAE B 16.5 ator grup ange fang roughnoss, Fa 32-63 un Desig ls reac, API 609 Cat. for sf sated butery wales, bute vae ating has tobe higher the bute valve Pr ating willbe as per maruacturers proposal and shale approved by contact. 8. Fortomperatures above 150°C buttery valves wih a PTFE ining or seat to be use, 7. Forhareontl maurng ony. JACOBS Comprimo® Suttr Solutions ) Project No. 64514-00 ~ a Piping Specification Client Enercon SA (64514-00/P-02/9705/A4 Site Location: Concon Refinery, Chile Rev. 1 Project Name _: Sulphur Recovery Unit 3500 Page 18 of 31 Be Pagotol2 PIPE CLASS B19 CARBON STEEL / ASME 300 LB Pe ata Cate sot ] Watsianese ave nate ccaten tet | sto Tn not stot Jee so Nin ahe ype ae ahe | ae son Pati swe a0 | Covesonsinanoe it | ) Sonn inte Tempeatue¢ | 60 100 160 200 250 0 250 400 Prosuetann | 500 464 451 420 418 989 260 226 ote? tem [190 Matai Dimensions Remarks Poe —— | Sanaa ST TOT SHE B35 coon nae OT Rings —] eons 00°77 — [AST Az3e WPS SHE 163 Coote ae 02 Bumentd | Staaf Reo. Teos estes Cope Not Fangs WSS ROT HIT ASTROS TSE TES STERF cone Ta OTR Taka | Sarvs ag ATHY SOT CS gue og Fier ron Baka | St bas Sus= ASTM A TOOTS | Sa BS TSRT ear EET TOF 5 4882.67 ds -ASWED 1e2200s 082 |S 1600 Naa ASTREA 10424 or Suds cass 20 esata Nie case 20 os 1.Forntes oe nest see. 2 CCOCEE is CocceE (CODE EXPLANATION OF CHARACTERS fo S6eeD0 : JACOBS Comprimo® Suifur Solutions Project No. : 64514-00 Piping Specification Client : Enercon SA 64514-00/P-02/9705/A4 Site Location: Concon Refinery, Chile Rev. 1 Project Name _: Sulphur Recovery Unit 3500 Page 19 of 31 BBs Pagezot2 PIPE CLASS BUS (CARBON STEEL / ASME 300 LB tom [Size Type! onstruction Material marks Connections ave Gale ‘SW ooo] Soweae oy an bonnet “Coane Jt ondemater | ASTIAARIe WCC max. 025% fee wespe Or ASTI AOS" andlager bates | Stor borne ‘AST AIBA osay F310) Fisrg stem tvouph | Glandfotowewedae, aponnoo! tooyeeats ard Wendie | eksoats Geeroperted | ASI 100" 7 ager | Fangs a AISIOI6R) orbooy [BETTE ASME 200 materi at State faced Nowe 3 a Boxy and borne — [ESSE * Gotanis swaooe Joss ASTIAZIEWORC* mau 025% Resnghandates! or ASTIEATOS™ Stem: [AST AIG2-6A oF Foret) Giaefotowe uy sans, backseat: Baty AS\«i00¢ was Fengod AF ‘NIL body ASHE 30018 ‘ata a steed 6 feces Notes Track TT | Paps | Bakara Boy and covet — | SBE "Cea Sw eo0 ASTUAZIB WCBC* max 025% er ASTI AIO PrstoniSsk nd body seat Notes Fae | STI INIS14100r STS Cnn Fangeo AF ‘AS13460 orbowy max 025% ‘ASME 900 1 material a setted 6 faced Notes pe 1 and smaller to be bert, is SD, instead of elbows, wherever posse. Desig nite ae oo. lange rating ASME B 16.5 and 12" pps for 400°C), Flange facing ughress, Ra 82-83 um, Stoam rape tobe soc by uly engineer. Forterzotal mounting ony JACOBS 'SRANGH CONNECTIONS 90 DEGREES Comprimo® Sultur Solations ) Project No. : 64514-00 Piping Specification Client : Enercon SA 64514-001P-02/9705/A4 Site Location: Concon Refinery, Chile Rev. 1 Project Name _: Sulphur Recovery Unit 3500 Page 20 of 81 Bis Pape tof? PIPE CLASS BJS CARBON STEEL / ASME 600 LB Pope mated carbon soo Nom. seize ‘ot cos Valve materia ‘carton steel we sch. 00 “Tem mater steed Main vavo 9p Gaovare ating ASME 6001 Conesionatonance in. Servic its Temperturesc | S010 180 200 20 00 980400 425 Pressure barga | 1001 928 906 678 636 775 740 60.1 878 Note2 tom ___| type Matai Dimensions Aemarks Poe | Seamless ASTI A108 G8 ASME 896.10 cntents max. 0.29% fitings | ebowsoorr4se | Asti nase wre Awe 8 169 Ceonarts mex 0.25% Bu wetd | Svaig ed. Tosa Redvers Now ca anges | Welding neck ind | ASTIC A105 ASME 8 185 e008 AE Conon max. 0.28% Noes caskets | spralwound+ | Winding: A181 3161) Fier: raphe | 853061 Suid ong Botteg | sudbots ‘Suds - ASTI A 19587 suds -B 4002 as ace. ASME 8.1.1 oF 884002 87 Nite ASME 8 19.2.2 0°88 4682 J BS 1580 Nuts ASTIA 19624 0 Suds less 24 8354682 2 Nas cas 28 Notes 1 For notes see not shoot JACOBS ‘Comprimo® Sultur Solutions ProjectNo. = 4514-00 Piping Specification Client : Enercon SA 64514-0/P.0219705/A4 Site Location _: Concon Refinery, Chile Rev. 1 Project Name _: Sulphur Recovery Unit 3500 Page 21 of 31 an Pagezat2 PIPE CLASS BG CARBON STEEL / ASME 600 LB tum |sizo | Type! conseucton Material Design oaths Connections Dimension and vate marking Gate Tangev —[Fananalor | Body anstannoe PES 2 Tes JASE 0% | S068 wee. astaaeieWwoBe moe 025% ar ego: crash nos Fomlewespe. | Sem Bowedbomet | ASTHAIEZEBA OF Now 7 osay Fat6) FandaAe PBWATRA) —| Pan sam Giandtowen eye, [ESTA ASME GoDib | roughhancnnoo! | body sats backseat toransiamger | ASLATOor ear opoatea | ASISHGLorbody ator at Seed cst 3 cae TE Pug ype — | Baad omer Bog} and bonnet —— | BSBSSE "CaaS asuceoe fosey Astianzte wesc nec 025% Rang hancunest [or AST Ar05" Stem STU AI@2.F6A or Note? Fare) ro Glenofotower ses, ESTES BWRLRF) Body aa, barns: SME GoD a nslaroer INSIST) orbody ator Stated Scot ow 3 ek —— PT — sarap RET Ty andeovor [US T5E "Cas Farge AF stu nate weac” wa 028% SWE 60D a erst Ao Note? Ptont ae boy ie 98 F aaT Ge | So seat as "Cts awit (FF) it 410" mex 025% ASME oD a ‘ISISTEL) or 00 ‘rte a aie laced nae ats se salt tes eto or woes fr al ances sign ite ae ee, age atag ASME 8 18.5 ratonal group 11 Fango face eughness, Ra 32-8. um. But weld valves may be used a ales. ‘Steam tape to be eeected by uty engine For hozon mounting ony Or SW i pote. JACOBS Comprimo® Sultur Solutions Projecto. :64514-00 Piping Specification Client Enercon SA 64514-00/P-02/9705/A4 Site Location: Concon Refinery, Chile Rev. 1 Project Name _: Sulphur Recovery Unit 3500 Page 22 of 31 Page 10f2 PIPE CLASS BX1 (note 11) CARBON STEEL / ASME 150 LB Pipe aoa an aor | eae aa ahora extent [ower sas him masta sanmssearoncr | 1m = ea0 nae pe betty |e ew sn20 Rating ASME 150 oe a8 12.05% (S10) Corrosion stowance in re ‘Sens ns Temperature 6 | 75100515070 FLANGE BALL VALVE RATING (Pre SEATS) Pressuebage | 195 185 177 Ter 158 49 110 to & oc. 3 193 165 177 167 158 149 90 ‘ine ina, 303 185 177 167 168 120 70 Bin. 10 te Noto 4 493 188 17.7 160 120 8050 {216i EUTTERFLY VALVE RATING Note 567 Pressurstaga | 193 185 17.7 167 158 101 43 Tre seat 193 185 177 167 158 149 80 ATFE SEAT TTemperaure'C | 50100 180 200 250 200 950 400 FLANGE RATING Notes Pressure baga [103 177 188 140 121 102 84 65 trom | type Mater Dimensions Remarks Pipe |< 2¥rsoanions [ASTM ATO8 Gr © ‘RSME B36 or Centers ax OTR 24° welded AST A672 Gr 8550rB60 | APIS. L22 or APIS Gr. 8 to Fiings [howe 07S> [ASTIN aS TESTES Teor a OF fun” | Sraight/Red. Tees | -Soamess: wos | Reduoor ‘ASTM A106, cere weed: Note? ‘ASTM ABT? Gr. 856 oF 60.6122 or APLL GL Fagor | Waring nes Bina PASTA Tos ASHES TES TSOBAF Ceomen a O Sip-on> 29° 18S 2209 1501 FE Noes Casha Seal wound Wag: ATHY 3S 87 ‘CS.cening ing __| Fler: rapt ating | Sid bots Suds: ASTMTA TOG 7 | Sade “BS AB Tread ace ASHE BT er BS us ASTWA 10424 | Nute “ASME B 18.2.20°88 4ee2 | 1500, Stud dace 2A Nuts oss 28 Mos Forres see neshest BRANCH CONNECTONS Eo DEGREES Baseeags JACOBS ‘Comprimo® Sulfur Solutions ) Project No. : 64514-00 = Piping Specification Client Enercon SA 645 14-00/P-02/9705/A4 Site Location: Concon Refinery, Chile Rev. 1 Project Name _: Sulphur Recovery Unit 3500 Page 23 of 31 ex Pago 20t2 PIPE CLASS BXt (note 11) (CARBON STEEL/ ASME 150 LB Size Type Construction | material Design Remarks Connections Dimensions and valve marking ‘Bateriy |S andtarger | Water ype eaablote and erator [aay Dinensons BS 5165 — [= Czoranis ‘tboteen anges RF | wrench operates. | ASTI A2IB WICBIC" | or APIG09CaL. Bor | max 0.25% ASME 150 andlor teat TFEIRTFE or | APU 609 Cat. A fehtshat of yp Goaroperates, | meta Dio: ASISN6 Bale nas oo Bos SST Canis Fanged Ae tating bl, ASTRAZIB WAC smn 025% ASHE 150% double eal oF ASTM A105" ) sete an 2a: PTFEeniorod)ea NSISt6 Note 310 Gibs FTE Pas pe Dated banned Boay anc Dome “Canis Pangea RF osay [ASTM ADS CEIC™ vax 025% ASME 150 1b fsing handwnest | or ASTIAATOS™ F wager | Bal ype. Tine asisis [ESTES Flanged Re ASME 150 tb ow 3.12 chek Pion ype Boker aer Boa and cover | BS SHEE “Canes Fange RE ASTIEAZIB WCO) wax 025% | ASME 150 fb or AST A105" Noto, 14 araTaIpeT | Suna ype Ptonidsk ndbody [BS TEER Sr APTEBS "Coons Fangoa RE seat AISI<10 0 max 025% ASME 150 or*Waler NSL3I0( orbody ‘ype, sabi of ‘rater a Datwoen anges AE lied aces Notes ASME 150 Tena [=e ——] Sraigiway Bates corer Boa TSE TIE “Carnie ated plug Standard ype andemalec | ASTMARIE WCAC mae 0255 ‘ae Fanged RE Wrench operated, | Plug: ASIS16 ASME 1508 8° Gearcporates. | Slwve: PTFE lacked wat sewed steam Note ‘ nections 3.9,14,13 } Notes Design ints are ace: ange ang ASME 816.5. teal group 1. Pipe * Wand smal io be bent (Fs 5D), instead of elbows, wherever possible, Desig its are ace ange rating ASME B16. materia group 1.1 and reduced bore al va ating BSS9St all valve rang has © bo higher, he bal valve PT ating wl be as par manufacturers ropecal and shalbe approved by contractor. Fox {bore bal valves, the PT tng sequal to the nearest age slze reduced bore bal va. 5 Design mts areas. AP 608 ca. 8 fo sof seated butt vas ih uty valve ain has tobe higher, te buterty ‘ating wil be as per manufacure’s proposal and shal be approved by contactor, 1. Design ints or metal seated bt valves are according to AP 609 ca. A and shal be as po body pressure rating (ange rating) rte ferent peseue eating, whichver es, 7. Reove 250°C bute valves Ranged obo used. Metal Seatd,stoam jacketed buttery valves shallbe used forinsine sence {or prooess gaatalgas crtainng suphur 8, Stessrlevng shall be spp ead detomation if more than Lied to 250°C max “0. Netal seated al valves, for Pleonnedton ony for tmparatur above 250°C 11, Steam tracing mey be quire prevent condensation ar otcaon of supurln process gastnescotarng HS and/or ‘lpr If steam eka is roquted foronce Is mad fo pipng dass Zi. 12, Netto te uses for process gastalgas conaing sulphur 18, Notto be used tr tqud sens. 14 Forhorsontl mounting oni 18 Forse 1 and lnge but vals are prot (or eonomizal reasons). JACOBS Comprima® Suttur Solutions ) ProjectNo. 7 64514-00 Piping Specification Client : Enercon SA 6451 4-00/P-02/9705/A4 Site Location: Concon Refinery, Chile Rev. 1 Project Name _: Sulphur Recovery Unit 3500 Page 24 of 31 CCA Page tof PIPE CLASS CAL CARBON STEEL / ASME 150LB oy Cabo sear [Reames Tana avo atl cto stat |e. ae seh 100 Tn matt sunessoaroncr | es sons nae astute |e ce sa rating ASME 180 6 - se 30 ) Comosion atowance in. 3 mm. esr ‘sen 20 Saves ee TexpeaureO | STs SSS aT TLANGETRS BALL VALVE RATING (PTFE SEATS) Pressure barn | 193 185 177 167 188 149 110 po it. in 103 185 177 167 188 149 90 ‘in Bin na 183 185 177 167 158 120 70 Bin. 0a. Note2 a 193 185 177 160 120.80, 50 12m 10 "femperiies"” 60 100 —is0""200 250 800 "A60“dai FLANGE RATING Notes Pressure begs [199 177 158 140 121 102 64 65 tm Type Mati Dimensions Remarks Ppe ae ASTHCATDSGAS SHE B36 Wor Cannons ax OE APISLORS. APSE. Faas Ebon BTS ASTI Re WPS ASHE BES Teoria OE fut weld Staigtt/ Red. Toes Reducers aps Netw Tanger Woking neat Bind, ASTHTA TOS FSET TES, HEAP | Contes ran OI ot Tae a 316 mint tikes Vt Bag Sate Studs“ ASTWTA TRESS | Shc 65 4057 Tien ase ASHE BS 4082 67 Nute “ASME 10220°88 |B.i.1 or BS 1560 ute ASTM A 194 2H or BS | 4882 ‘tus class 24 982 2H ute ess 28 Notes Forno abe next est “BRANCH COMNECTONSSoDESAEES $8 EGEODDOA CODE EXPANATIONOF cHARACTE 40 CeBn © BRANCHNIPLE PLAN JACOBS Comprime® Sultur Solutions Projecto. : 64514-00 Piping Specification Client Enercon SA 64514-00/P-02/9705/A4 Site Location: Goncon Refinery, Crile Rev. 1 Project Name _: Sulphur Recovery Unit 3500 Page 25 of 31 cat Page2ot2 PIPE CLASS CAI (CARBON STEEL / ASME 150L8 tom [ste | ype construction | atria Design fanart Connections Dimensions and Valve ‘marking Site —| Fa aer | Waar ops | Fara saree — Boe Oirensow ESTES | Caos sutaciotn | Wrencnoperoa. | ASTI AZreWwoRIC" | API@0OCaLB max 025% Berween tangas | Srandlaer | von tang or sat REAGME 50. | Gearoperins | Die: Ais 318 fen op ws Tar Pa Tea Boar SST "Cone Flanges | oatngtat, | ASTIA216 WOR oc 025% JASuE ‘son double ses) —JorasTinatos Seats andesas: | Ballson AIS1316 PTE (etn) e248 Gas [FTF Pps ated Bonet] Baayandeamnat | BS SST *Csiens Rengesne Josey ASTM nae WER oF nae 025% ASue 13h | Renghanavnont [ASTM AIS" anal [Bal Doe “er 19% Ce we Fangod RF ASME 150 Chek FTA [stn ype | Bala cover | Boy anaror OR Flanged RF SM AAIBWCBIC* or ASE 150 ASTMAIOS F wT | Sua ype “Wale TSAI ange AF ASTM AOS" ASE 150 ‘i orale yp Suna Beker angea fees Re ASME 15010 Nasa [TH [nse neste POT | Bataan | Boa andbarroe ASTI | BS EaRE “Coa ice josey nos man 0.2% anges | Ring hana! | Te 13% Ge ASME $50 a Noise 1. Usedret sub for ranenes 12,4 an on un os and ge ‘Use welll i rinoreemont required. ipa 1° ral tobe bent, SD, stead of tows, wherever possible Desig is are ae ange ating ASME 0 165 matoral group .t and reduced bor bal valve rain BS 951 (PTFE set). bl lve Pf ating has fo be higher, he ball valve PT ating shal bo as permancfacuers proposal, and has 0 be approved ‘bycorivactor For lors ball eves he PT rating is equal ota of honest larger Sze reaucedbore bal abe, Design imi ar ee, angering ASME 16. atonal group 1 Flange facing eughnoss, Ra 32-8. pm. Fortemperatires botweon 160 - 200° Bult valve with a PTFE tring or seato be use, For hotel mounting cy JACOBS Comprimo® Sulfur Solutions Projecto, :64514-00 Piping Specification Glient : Enercon SA 64514-00/P-02/9705/A4 Site Location: Concon Refinery, Chile Rev. 1 Project Name _: Sulphur Recovery Unit 3500 Page 26 of 31 Page of PIPE CLASS CXt CARBON STEEL / ASME 150 LB Ppanaaa Sanat Nomaneaiae = Vato mata Caton ste! wee seh. 100 “Tem mati Stinlos soo! eee se.60 Main vane ype Battery ole son40 Pate ASME 150 yw 5.90 Coroson atlowance Mn, 3. wee ‘8h 20 ae a wos aes ae et 0.569 SORTS Tonparns O | SS aS FLNGEIAT ATL VALVE WATS (PTFE SEATS) Pressuretarge | 193 185 177 107 158 149 110 ‘plo ine 314 99 108 177 167 158 49 90 ‘in -o'nne, 193 185 177 107 158 120 70 Bin. tO et Neo t 193,195 177 160 120 '80_50 ein tein ne, : 7 BUTYERPLY VALVE RTC Pressure ana |103 185 177 167 158 101 43 Tre SEAT ee _ [193 185 177 167 158 169. 80 AIFE SEAT __ ras bagi [83 OS V7 F WWT isa Vad WO FLANGE RATING Te Tie aterat imenslons roars Pe 220 ae STM ATOS CES SME D S610 cones max OR 24 welded asm nore Ge Bssor 860 | API SL [ciz2 or APIS. Gx B Fngs | Ebous 00-745 PASTA AzOAWIPS TOES Seana an 0 But weld | Svalgt/ Red. Tees odtcers a8 Note2 anges] Wetsng neck Bind | ASA TOS TERETE SOBRE Ceotona ra OTA Na Cakes | at wander CS] Winer ASIST) [SBT senting ing Fler: apie Bahag | Sut bats ‘Stas ASTHA GT —| Stas“ BS TERE Tara AERTS Nuts: ASTICA D420 [Nuts -ASMEB 182.2008 | 1580 4982 Ste clas 24 Nts ass 28 Fag Fer nos 25 Tea aTeaT— — BRANCH CONNECTIONS 0 DEGREES CODE EXPLANATION OF CHARACTERS FREOUGNE Tee BraNen FTG JACOBS Comprimo® Sulfur Solutions Project No. : 64514-00 Piping Specification Client Enercon SA 64514-00/P-02/9705/A4 Site Location: Conoon Refinery, Chile Rev. 1 Project Name _: Sulphur Recovery Unit 3500 Page 27 of 31 x1 Pagp20t2 PIPE CLASS CX1 CARBON STEEL / ASME 150 LB tr Sie Type! Construction | ator Design Femarks Connections Dimensions and Vatve smarking ator — | F andtnger | Wale" ype arabe |S ancanalor — [Baa Dinensins BSSTES | Cconeris tocteon anges AF | Wrenen operated, [ASTM AZIEWOBIC* |orAPIOo9CaLB | max 025% ASME 15018 Sandiager | eat TRERTFE vohisrtof ype | Geeroperates | is: AS1316 Bai rr Tie sate, baa SORT “Carian Flengoa ‘oan bal Asn xzre wot imax 025% ASME 50 ooubo seal or ASTM AOS" Seats and seals: PTFE (etree) Bal asi 316 Note 1.4 GE TF aa ‘Batodbonnat | Body and bomat ——] BS ERE Cones Farge osay ASTM A216 ICBC max. 025% ASME 15016 Fasmghandneat |r ASTM Atos" ander | Bal pe Tin: ASISI6 Sas Fonges ASME 150 Taek [FTI Piston pe Tenaearet | Bayar avar VBS RE Fanged AF ASTRO WCBIC™ ASME 150 oe ASTM A105" Faniage | Svea ye “tlerpe STAT ATS Flrged Asti Nos ASME 19010 rime Asi 316 or Wal ye stble {tbat fangs AF ASME 15018 Nate Tana EF Sige Boned se Boa TER TET |" Conan catedpg [2x1 | Standard ype Wrench operate, | ASTI A216 WCRI ax 0.25% ave Flanged ne incxtod wit | Pg: AISISI6 ASE 1501 ‘Srowedsteom | Stow: PTFE Steam jacketed eonaacons Net 47 Notes 1. Design nts ae ace flange rang ASME 8 18 Smtr group 1.1 ad exc bore ball ve ring [BS S251(PTFE seas), ball vee PT ating has o be higher, th bal valve PT rang wil bees per maufacturers proposal ‘and ha be approved by conracor. Fo hillbo bal vaves, he PT ating is ual othe nearest age ize rediced bore bal vale 2. Use direct subrin for banches 12,14" and on run pas and larger, Use wololts renforcerent i rogue Pipe and amare be bar, iS, instead of bows, wherever possible. ‘Stes relloving shal be apiled col efonntion is more tan St Frange lacing oughness, la 3.2.63 um For horizontal mounting oy. ‘Steam tracing may be require o prevent condensation and slateation of suphurin process gastns orang iS and or salu Netto be used fr solvent soe Foraizae 10° and largrbutory waives are pofened (or oanorica reson) JACOBS ‘Comprimo® Suifur Solutions Project No. : 64514-00 a Piping Specification Client : Enercon SA 64514-00/P-02/9705/A4 Site Location: Concon Refinery, Chile Rev. 1 Project Name _ : Sulphur Recovery Unit 3500 Page 28 of 31 G¥1 Page tof2 PIPE CLASS CYt CARBON STEEL/ ASME 150 LB JACKETED SYSTEM Pipe ara Caton Tepes DuTerpe Inner ipo CaeDOE Valve matoial: Carbon ste wat. | Nom. | _ was Nom. | Wal. Nom. | _Wat ‘Tekness | Pipe | Thickness | Pipe | Thickness | Pipe | Thickness Tim mateial : —AISI316 Size ‘Se Size Sey 1 | Sch 0 16 | SH Main valve ype: Steam jacketed plug eh 80 14 | Son-90 1 | Sen.20 | Soh. 40. | Seh.40 Rating ASME 1501 3 | sch 40 # | Son 40 @ | so4o | Scn.40 Cotosion eo | sca st | Sch.20 ‘aowance Min. 24 mem. a [soso | tor | soh-20 Note 1.7 so |scng0__| 14" _| son. 20 Sanee TS Temperature" 12829 Note 2 Pressure barge 19 177 158 140 121 102 FLANGE RATING Note 3 Pressure barga 1777 77 78 72 68 [EXTERNAL PRESSURE RATING Nem Type. Material Dimensions Remarks Poa ‘Seamiass ASTM A106 Gr. 8 ASME 8 36.10 Contents max. 0.23% Fitings | bons 90°45 ° ASTM A234 ASME B 18.8 Coontonts max. 0.23% Buitwold | Staight/ Red. Tees Note 4,7 odcors Flanges | Bling ASTACA 108 ASME 8 185, 1501b RF Contents max 029% Note S (sulphur part) Gaskets | Flatring for RF. anges | Compressod graphite AISI | ASME B 16:21 thickness 1/16" 3i6lamints oting Stud bolts [suse ASTMA 19967} Studs-BS 4882 Thread ace. ASME B.1.1 or BS Nus-ASTIMA1942H [Nuts -ASMEB 18220r8S | 1500 4882 Studs class 24 Nuts lass 28 ‘Notas 1. For notes see nent sheet ‘5RANCH CONNECTIONS 99 DEGREES REDUCING Tee JACOBS Comerime® Sulfur Solutions ) Project No. 64514-00 Piping Speaffication Client Enercon SA 64514-00/P-02/9705/A4 Site Location: Concon Refinery, Chile Rev. 1 Project Name _: Sulphur Recovery Unit 8500 Page 29 of 31 ert Page 2 ot PIPE CLASS CY CARBON STEEL / ASME 150 LB {JACKETED SYSTEM om size Type! Construction Matera Design Remarks Connections Dimensions and Valve marking ontuos |Nomvaesize | sraigntayor | Bote cover aay sme 1610 |*Ceontets cated 29 ‘Thewway Toe, | 4 and smaller Asti Agta Weare max 025% vane Standucd ype | Wrench operated Fulysiean | 6° and lage acketed ‘Gear operated Grersized | Stormacket with ) fangos Ar | screwed steam ASME 150» | connectons Neves check ssxingtype | Bed cover Boxy: Jasme R610 | -c-contents Futystean | Steamjactoted win ASTIVAZTG WCB mak 025% lackets sere stam or ASTMLAIO5" Oversized | comectons The ISI S6 anges FF ASME 150 Notes 1. Steam aketed pipe up to flange. 2. Design ts re ace. Sarge ratng ASME 8 16.5 nator group 1 ‘2 Design lms reac. BPV Code, Section Vi Dison |, UG-28, Subpart of Seton I Pat D Fig. C82. Pressures maimum pressure in jack based on temal soamioss po szo 2 neh schedule 90 or maximum tsuppted eld ang of 6 metas 4 Branches tobe made as dec stub inc (e.) 005, 5. lange facing roughness, Ra 3.263 um. {6 Sves elaung sal be apps cold delomation ie mor than 8% forma pipe and inne ngs 7. hows fo be jacketed: use LA Ebows foriner spe and SP Elbows for ote pipe JACOBS Comprime® Sulfur Solutions ) Project No. : 64514-00 Piping Specification Client : Enercon SA 64514-00/P-02/9705/A4 Site Location : Concon Refinery, Chile Rev. 1 Project Name _: Sulphur Recovery Unit 3500 Page 30 of 31 21 Page tof2 PIPE CLASS CZ1 CARBON STEEL / ASME 1508 {JACKETED SYSTEM Pipe males > Carbon seal [nar ibe Outer pipe Tarps Caer Vale materat: —Caroonsteet_ | Nom. | wat | Nom | wat | om | wat. | Nom wat Pipe | Thiskress | Pipe | thckness | Pipe | ticine | Pipe | Thickness Se ‘See Ske [ss | sae Trimmataral: —Stainiesstoy [| SCOT F [sna] to Sao isecr | schoo wo fsa] iz |sor2o Muinvaneype: — Seamfacketed | | Sch 0 wz |snw| i [soz on te [seve vw |sxao| te |sov20 ating heme rsom | 2" | son a0 s [saw | we [sa] iw — |soreo Carrsion x | sca & |soso | se [snao| ar [sonra somarce Min2ximm. | a | Seha0 @ fsa | ar [saso] or | son20 Nott | sana s_|sen 20 ence Tempera *C sie FLANGES BALL VALVE RATING ) (PTFE SEATS) Pressurabarge | 195185 177 167 158 149 110 pio ina Sin 193 185 177 167 158 149 90 ‘tin 8. ne 10a 185 177 167 158 120 7.0 2Bin-10ia nek. Note2 $98 185 177 160 120 80. 50 2a 16:n a ona GUT TeAFLY VALVE HATING Prossumtaga | 199 185 177 167 158 101 43 [TFESEAT Note 9.4.5 * __ [193 485 177 167 158 149, 90 YEE SEAT. | Temperatures | so 75 100 125 150 175 00 250 900 950 Notes Pressuebage | 199 186 177 167 158 149 140 121 102 64 | FLANGE RATING Note 7 Prossuebage [77 77 77 77 77 77 76 72 68 68 | EXTERNAL PRESSURE RATING tem Type Matrit Dimensions Remarks Pipe Senos ASTHATOSSE B 336.10 Corina ax 025% Fitna Shows OT STN AWS ASME TET [Ssonnis man 023% But weld ‘Sraight/ Rod, Teas | cape Note Fingos Viering neck] oid —_[RSTUTATOSW. ASHE DISS TOE AEC conan max 02 Now | Gaskets Spaal wound +CS | Winding: ASIOTOT) ——] 55 3867 contin Hing Filo: grahite Baling Sodas Shade AST R WSBT | Shade “OS AE Tread aoe ASME ETT or BS TOT ) us ASTMA 194 24M [Nuss - ASME 1822 0r | Suds class 24 1354082 las 28. |. For ots 09 nex sheet BRANCH CONMECTIONS go DEGREES m CCCEEEEEEEEER | Be CoSDDODODA HO GCODDODA CODE EXRLANATIONOF CHARACTERS i CCCODA ‘x Coun ree BBA 2 BRAN AITTING JACOBS Comprime® Sulfur Solutions Project No. = 64514-00 Piping Specification Client Enercon SA 64514-00/P-02/9705/A4 Site Location: Concon Refinery, Chile Rev. 1 Project Name _: Sulphur Recovery Unit 3500 Page 31 of 31 oa PIPE CLASS CZ1 CARBON STEEL / ASME 150.LB. {JACKETED SYSTEM tem | size Type! contruction | Material, Design Remarks Connections Dimensions and ave marking Butt — [Fad ger | Water ype Saale | 6" and wnatar — [Boa Dimensions SSIES | "Coors toftbetmocn ASME [Wrench operated. |ASTIMARIEWCOG’ | orAPLeDDCatL Bor | max. 0.25% {SOI RFtanges, | erandlager | sosTFEIRTFE or mal | APL 6D8 Ca. ontshutol ype | Goaropertos. | Dike: Alsi 316 Now 93.45.0.13 Bar ae Fire ale, Boy BS eR6F Contes Flanged AE ‘tating bal ASIN A216 WORK" max 025% ASME 150 soubl sal or ASTRA TOS" avinga tobe filed | eats and soa: wih PTFE inser) | PTFE}rnircod) ale asI316 Now 9:12 Tbe TE Pea ae Tale bonnet 600) and bomet BSE Conteris Fanged FF osay ASTM A210 WOBIC" or ma. 0.25% ASHE 150 fb eing handuhoel | ASTMLATOS" Fanaa YBa ype "rim: AISI 16 wae anges RE ASHE 150 Nw 9.14 Chak fT —] Piston ype Bote cover] Bedard over EE Contos Fangod A [ASTM A216 WOBC or ran. 0.25% ASME 150 ‘ASTM A105" Pistonlisk and body ww 9.15, Farag | Sang VRE sect. IS1410.0¢ BST Contes Fangod Fr INS SH6) oF By max 0.25% ASME 180 rata at feted faced Noweo Ten ao TagNay Baked cor [Body FEB TES "aon ented pug Stancard ype ‘andemaler: | ASTRCAZIG WOR mex 025% vate Fanged AF ‘Ween oparsted, | Plog: AISI6 ‘ASME 1500 6's Gear operated. | Slave: PTFE ocketed wi | connections 21113 Nose 1. deckating shal notre anges, stows an tos. instrument connections on process Ines, sha be in intrmesito ‘sectons outdo jackoting. Lines smal than 2 ech shall be wacod. 2, Design nis are ac. flange rallng ASME 816.5 materi group 11 nd duced bore ball valve ang BSS bal valve Fang hast be higher, the Bll valve PT rang ws be ne por manufactures proposal and shale eoproved by contractor. Foe {bos bal valves, te IT ratings eqs! the nearest arg sz reed bore bal ave ‘3 Design is are ace. API G00 oat. for sf coated bert vas the butte valve ring hes to be igh ‘ating wil b a por maulacture’s proposal and shal be approved by contractor. 4 Above 250° butery valves tanga o be used, Metal sonled, team jacketed but valves shal be used forintne service for process gasallons conaring suc 5. Designs or metal sated bate valves are according to APIO cat. Aa ha be as pr body pressure rang (ange ‘ating rhe dloretl pressure rating, whichever ess. 1 Dani its ao aor. ange rating ASME B 16.5 matrilgroup 1. 17 Desig lime are an. 19 BPV Cade, Section Vi, DMsion | UG-28, Subpart 9 of Section I Par D, Fg. C52. Pressures sium praaeue In jacket based cn nema! seaiass ipo eze 12 inch schedule 0 fora maximum Uneipponed fol lng of 6 melts. 8 Pipa andsmaller tobe ber, (78 6), stead of elbows, wherever posse 8. ange acing roughness, Ra 22-0: ym, 10, Steseretevng shal be appli cold detonation s more than 5% 4, Limited 250° max 42, Natal sata al valves, orl connection on, for tamperatre above 250°C. 16. Sturn racinglecksing may be rq to preven condensation and salcicaton of suphurn process gasines containing HS andor supe “4. Notte be used or process gastagas containing shut 18. Foros mounting ory. tnobuterty

You might also like