SUMMARY OF ESTIMATES:
NO. DESCRIPTION TOTAL COST
1 MATERIAL COST PHP 649,673.00
2 LABOR COST
3 ENGINEERING SUPERVISION PHP 45,477.11
4 CONTRACTOR'S PROFIT PHP 69,515.01
5 GRAND TOTAL PHP 764,665.12
Note:
1. 40% downpayment will be collected before commencement of work
2. the remaining balance will be billed as per accomplishments and 5% will be retained as retension. Of which
retension will be released after 1 Month or after rectification of minor defects in workmanship.
Prepared By; Approved By: