BILL OF MATERIALS
SUMMARY
A. DIRECT COST P 39,703.00
Total Cost of Material P 10,297.00
Labor
Prepared: Approved:
BILL OF MATERIALS
I. PLUMBING WORKS
A. Materials
Ordinary Toilet 1 set 1,200.00 1,200.00
4" x 4" Floor drain 1 pcs. 350.00 350.00
4" x 3.0m dia. PV Pipe 3 length 250.00 750.00
4" dia. X 90 PVC Bend Elbow 2 pcs. 120.00 240.00
4" dia. X 44 PVC Bend Elbow 2 pcs. 120.00 240.00
4" dia. PVC Clean Out Plug 1 pcs. 80.00 80.00
4" dia. X 4" dia. PVC Wye 1 pcs. 85.00 85.00
2" x 3.0m PV Pipe 3 pcs. 160.00 480.00
2" dia. PVC P-Trap 1 pcs. 120.00 120.00
Total 3,545.00
SUMMARY
A. DIRECT COST P 32,045.00
Total Cost of Material P 7,955.00
Labor
Prepared: Approved: