Professional Documents
Culture Documents
Final Handover - Aeternitas Pe1
Final Handover - Aeternitas Pe1
This is to certify that the Passenger Elevator One (1) has been satisfactorily
completed on ____________________________ in accordance with the Plans
and Specifications of the Contract. This certification does not relieve Ecolift
Elevator and Escalator from obligations and responsibilities in undertaking
repair works on any defect or failure that may occur in any section of the project
during the defect’s liability period starting from the date of completion as herein
stated.
Signed by:
ECOLIFT Elevator and Escalator Corporation Owner
` Suite 811, Vicente Madrigal Bldg., 6793 Ayala Avenue, Makati City
Telephone Number: +63 359-0047 / +63 945-4314144 / +63 929-5433342
Email: sales@ecoliftph.com
www.ecoliftph.com
CERTIFICATE OF ACCEPTANCE
This is to certify that the Passenger Elevator One (1) has been accepted as
of ____________________________. The project is free from failures and
defects which are traceable to poor workmanship, use of poor quality materials
and noncompliance with Plans and Specifications of the Contract.
Signed by:
ECOLIFT Elevator and Escalator Corporation Owner
` Suite 811, Vicente Madrigal Bldg., 6793 Ayala Avenue, Makati City
Telephone Number: +63 359-0047 / +63 945-4314144 / +63 929-5433342
Email: sales@ecoliftph.com
www.ecoliftph.com
HANDOVER
Handover
Handling over of newly installed One (1) unit of Brand New
Ecolift Elevator 1,000kg – Passenger Elevator 1
Subject 1 set of Elevator Key
Matter Certificate of Completion and Acceptance
Handover Equipment delivered and installed in Commonwealth,
Method Quezon City and in accordance with European lift code EN -
81 and local code
Signature Sheet:
Person accepting the subject matter Person Handling over the subject
of handover matter of handover
Name: Name:
` Suite 811, Vicente Madrigal Bldg., 6793 Ayala Avenue, Makati City
Telephone Number: +63 359-0047 / +63 945-4314144 / +63 929-5433342
Email: sales@ecoliftph.com
www.ecoliftph.com