Professional Documents
Culture Documents
45F200 Weekly SSW Check Sheet.
45F200 Weekly SSW Check Sheet.
:-45F200
1 Check the tightness of nut & bolts at primary & secondary side Should be properly tighten Spanner
3 Check complete dressing of wires and pipelines Should be properly dressed Visually
9 Check the water jacket availability in the machine Working condition Visually
Sign
Technician
Name
Sign
Shift Engineer
Name
Sign
HOD
Name
Note- Refer this for the SSW & Projection Welding Machines of make ARC WELDER, TECHNA, JAYA HIND SCIAKY, KIRPEKAR, WELDCON, TOKAI & SAMTEL etc.