Doc.No.

:-45F200

WEEKLY PREVENTIVE CHECK SHEET OF SSW + PROJECTION WELDING Rev.No. :-00

Issue Date :-27.09.19

Machine No :- Machine Name :- Month Year


Week 1 Week 2 Week 3 Week 4
Sr. no Sub. Assembly Activities Req. Standard Condition Method Status Status Status Status
Remarks Remarks Remarks Remarks
Before After Before After Before After Before After

1 Check the tightness of nut & bolts at primary & secondary side Should be properly tighten Spanner

All connections properly


2 Check primary side power supply & wiring connection By tester
tighten

3 Check complete dressing of wires and pipelines Should be properly dressed Visually

4 Check for the alignment of electrode Should be properly Aligned Visually

Tower light and hooter


5 Check the working of Tip Dressing counter and its hooter Visually
working

6 Check the working of Nut counter Working condition Visually

Should not be worn out > 40


7 SSW Check the flexible shunt for any damages Visually
%

8 Check & remove spatters of machine No Spatter on machine By hand

9 Check the water jacket availability in the machine Working condition Visually

Check water flow switch interlocking, in case of out of limit


10 Interlocked By operating
machine will stop

Check air pressure switch interlocking, in case of out of limit


11 Interlocked By operating
machine will stop

Proper lubrication should be


12 Check the lubrication in guide bushing By hand
provided

13 Check earthing of machine Multimeter < 1 ohm

14 Checking of nut angle positioner vibratory bowl Dust free By hand


Nut Feeder
(If available)
Check Viisually and Clean
15 Check the feeding tube for dust or any wear and tear Cleaning & No wear and tear
with dry air

Sign
Technician
Name

Sign
Shift Engineer
Name

Sign
HOD
Name

Abbrevation C- Cleaning L-Lubrication I-Inspection T- Tightening OK ✔ Not OK X

Note- Refer this for the SSW & Projection Welding Machines of make ARC WELDER, TECHNA, JAYA HIND SCIAKY, KIRPEKAR, WELDCON, TOKAI & SAMTEL etc.