You are on page 1of 3

RCC Quantity STATEMENT

Project:
FOR Date:
Client:
FOOTINGS and PEDESTALS

Qty.
S. No Beam ID Nos
L (Mts) B (Mts) D (Mts) Qty (Cum)

1 B1 1 1.775 0.230 0.420 0.171

TOTAL: 0.171 Cum.

Prepared By: Checked By: Approved By:


Project: "Botanica" @ Gachibowli BBS For 21st Floor Slab Beams 29/06/13
Client: M/s. Koncept Ambience Wing-7
Tower-D

Grid Total Weight (Kgs)


ID REF NOS DIA
Fm - To Length Shape 8 mm 10 mm 12 mm 16 mm
0.000
2125

370

370
B1 J-K T 2 20 2865 0.000 0.000 0.000 0.000

370

370
J-K B 3 12 2915 2175 0.000 0.000 7.773 0.000

1175

370
J T(Ex) 1 16 1545 0.000 0.000 0.000 2.441

180

370

370
J-K 1775 @200Stirrups 9 8 1260 180 4.480 0.000 0.000 0.000

8mm 10mm 12mm 16mm


TOTAL: 4.480 0.000 7.773 2.441
Add % : 0.000 0.000 0.000 0.000

TOTAL: 4.480 0.000 7.773 2.441

GRAND TOTAL: 28.842 Kgs

Prepared by: Cheched by:


Project: "Botanica" @ Gachibowli BBS For 21st Floor Slab Beams 29/06/13
Client: M/s. Koncept Ambience Wing-7
Tower-D

Weight (Kgs) " '-


20 mm 25 mm 32mm

14.148 0.000 0.000

0.000 0.000 0.000

0.000 0.000 0.000

0.000 0.000 0.000

20mm 25mm 32mm


14.148 0.000 0.000
0.000 0.000 0.000

14.148 0.000 0.000

Prepared by: Cheched by: