UPTOWN CAIRO PROJECT

JOP Site instruction

Package No. : Z3 - 89/1 & 89/2 Contractor : arabtec


Memo No. : Date : 03 Mar. 2022
From : RMC

Damage of low voltage cables


Subject :

During our site investgation we found that the low voltage cables routing damaged (outer insulation damaged) (
attached photo)
The contractor shall follow :

1- Corrective action is required.


2- Preventive action shall be taken to avoid this happen again.

Resident Engineer
Eng. Ayman El Sounbaty

………………………

PLEASE DEAL WITH THIS MATTER IMMEDIATELY AND RESPOND WITHIN ___DAYS
DESCRIBING THE NATURE OF YOUR CORRECTIVE ACTION.

Distribution: Project Manager Construction Manager Consultant Contractor Others

Contractor's Response :

Signature

Distribution: Project Manager Construction Manager Consultant Contractor Others

CM/Consultant's Comments :

Signature

Distribution: Project Manager Construction Manager Consultant Contractor Others

This Job 4.34


SiteJobInstruction
Site Instruction(J.S.I) Does not Entail Any Additional Cost or Time

You might also like