You are on page 1of 3

Construction of N4 Road near by Venkatapalem to Navluru (South boundary)

Project and N14 Road near Borupalem to Sakhamuru (South boundary)


in AP New capital City,Amaravati.

Client Amaravati Development Corporation Limited

Consultant LEA Associates South Asia Pvt. Ltd.


Contractor M/s BSCPL Infrastructure Limited

ATTERBERG'S LIMIT
(As per IS 2720 Part-5)

Lab Job No. : _________________________ Date Sampled : ____________________


Location/ Source : _________________________ Sampled By : ____________________
Type of Material : _________________________ Date Tested : ____________________
Proposed to Use : _________________________ Tested By : ____________________

Liquid Limit Plastic Limit


Determination No. 1 2 3 4 1 2

Container No.

Empty weight of Container (g)

Wt. of container and Wet Soil (g)

Wt. of container and Dry Soil (g)

Wt. of Moisture (g)

Weight of Dry Soil (g)

Moisture Content (%)

Depth of Penetration

Results:

Liquid Limit (LL) :


Moisture content (%)

Plastic Limit(PL ):

Plastic Index(PI) :

Depth Of Penetration
Contractor's Representative PMC Representative ADCL Representative
Construction of N4 Road near by Venkatapalem to Navluru (South boundary)
and N14 Road near Borupalem to Sakhamuru (South boundary)
Project in AP New capital City,Amaravati.

Client Amaravati Development Corporation Limited

Consultant LEA Associates South Asia Pvt. Ltd.


Contractor BSCPL Infrastructure Limited

ATTERBERG'S LIMIT
(As per IS 2720 Part-5)

Lab Job No. : _________________________ Date Sampled : ____________________


Location/ Source : _________________________ Sampled By : ____________________
Type of Material : _________________________ Date Tested : ____________________
Proposed to Use : _________________________ Tested By : ____________________

Liquid Limit Plastic Limit


Determination No. 1 2 3 4 1 2
Copntainer No.
Empty weight of Container (g)
Wt. of container and Wet Soil (g)
Wt. of container and Dry Soil (g)
Wt. of Moisture (g)
Weight of Dry Soil (g)
Moisture Content (%)
No. of Drop/Depth of Penetration

Moisture content (%) Results

30
Moisture content (%)

Liquid Limit (LL) :

25 Plastic Limit(PL ):

20
Moisture content (%) Plastic Index(PI) :
15

10

0
0 2 4 6 8 10 12 14

Depth Of Penetration

Contractor's Representative For ADC/Consultant

You might also like