Professional Documents
Culture Documents
36 CONSTRUCTION OF MARAMAG BY- PANADTALAN, Construction of Concrete 1.800 km 3.60 Lane CW1=
PASS ALONG SAYRE HIGHWAY MARAMAG, Road 0 Km 64,000.00
(PANADTALAN-CAMP 1 SECTION), BUKIDNON RROW =
PACKAGE 1, MARAMAG, BUKIDNON 36,000.00
37 CONSTRUCTION OF MARAMAG BY- NORTH Construction of Concrete 1.800 km 3.60 Lane CW1=
PASS ALONG SAYRE HIGHWAY POBLACION, Road 0 Km 64,000.00
(PANADTALAN-CAMP 1 SECTION), MARAMAG, RROW =
PACKAGE 2, MARAMAG, BUKIDNON BUKIDNON 36,000.00
38 CONSTRUCTION OF MARAMAG BY- SOUTH Construction of Concrete 1.520 km 3.04 Lane CW1=
PASS ALONG SAYRE HIGHWAY POBLACION, Road 0 Km 54,400.00
(PANADTALAN-CAMP 1 SECTION), MARAMAG, RROW =
PACKAGE 3, MARAMAG, BUKIDNON BUKIDNON 45,600.00
39 CONSTRUCTION OF MARAMAG BY- CAMP 1, Construction of Concrete 1.900 km 3.80 Lane CW1=
PASS ALONG SAYRE HIGHWAY MARAMAG, Road 0 Km 62,000.00
(PANADTALAN-CAMP 1 SECTION), BUKIDNON RROW =
PACKAGE 4, MARAMAG, BUKIDNON 38,000.00