You are on page 1of 1

N

SCALE 1:600

SCALE 1:600

FINISHED
S.O.P. LOCATION STATION EASTING NORTHING ROAD
LEVELS

10

CONTRACT NO. RA/243 DWG. NO : DRAWN BY H.S REV. DATE DESCRIPTION CHKD APPR. CONSULTANTS:
UPGRADING OF ABDALY HIGHWAY FROM DESIGNED BY: H.R
THE ACCESS TO THE PROPOSED MUTLA S-IC#4-GA-02 DAR Al-DOWAILAH
CITY TO THE PROPOSED INTERCHANGE GENERAL ARRANGEMENT CHECKED BY: M.T / A.R
Louis Berger SAS - France Engineering Consultants
MINISTRY OF PUBLIC WORKS AT NORTHERN REGIONAL ROAD 1:600 APPROVED BY: Engineers - Economists - Planners & Construction Managers
SCALE @ A3 SHEET
STATE OF KUWAIT ROADS ENGINEERING SECTOR FINAL DESIGN 1:400 DATE:

You might also like