INSTRUCTIONS TO TENDERERS
a. Contractor to Check
The Contractor is required to check the page numbers of the Bills of Quantities and should any be
found missing or in duplicate or other figures or writing indistinct, the Contractor must notify the
Quantity Surveyors at once and have the matter rectified before the tender is submitted.
The Contractor is required to check that all pages are carried to Collections or Summaries as the case
may be and that they are reflected in the Main Summary.
c. Alterations or Qualifications
No alteration, addition or qualification of any kind whatsoever may be made by the Tenderer to the
text of the Bills of Quantities.
If any alteration, addition or qualification is made by him, it may cause the tender to be disqualified
and will in any case be ignored and the text as prepared by the Quantity surveyor will be rigidly
adhered to.
Tenderers must tender strictly on the basis of the terms and conditions of contract specified in this
document. Tenderers wishing to put forward alternative conditions may only do so by submitting an
alternative tender under the terms and conditions which they wish to substitute for the conditions
given in this document. Tenderers submitting an alternative tender must however also tender on the
conditions given in this document, otherwise their tender will be automatically disqualified.
At any time prior to the deadline for submission of tenders the Employer may, for any reason whether
at his own initiative or in response to a clarification requested by a prospective tenderer amend the
tender documents by issuance of an "Addendum". The "Addendum", the receipt of which must be
acknowledged, shall be sent in writing.
Should the employer be of the opinion that the issuance of an "Addendum" has created a need to
extend the deadline of the submission of tenders, then at his discretion, he shall in writing grant such
an extension.
e. Completion of Tenders
All Documents forming part of the Tender shall be completed in INK and the offer shall be made on the
form of Tender. All items measured and described herein must be priced and any item not so priced
shall be deemed to have been covered by the Tenderers prices on the other items. Lump sum pricing
and wilfully omitting to price an item shall render the tender liable to disqualification and item(s) not
so priced shall not in any case be taken into consideration.
The Tender shall be witnessed as to validity. Tenders not so witnessed shall be declared invalid and
therefore non responsive.
INSTRUCTIONS TO TENDERERS
Prior to the tender opening a Tenderer may alter or withdraw his tender in writing provided that any
alterations so made must be personally signed by the Tenderer or by his authorised representative.
The modifications or notice of the with withdrawal shall be prepared, sealed, marked and delivered
with the inner envelop additionally marked "MODIFICATION" or "WITHDRAWAL "as appropriate. No
tender shall be modified or withdrawn subsequent to the deadline of submission of tenders. In the
event of a Tenderer withdrawing before the tenderers are opened, his tender will be returned
unopened in an outer envelope bearing the name and address of the Tenderer without any other
markings.
g. Responsiveness
Prior to the detailed evaluation of tenders, the Employer will determine whether each tender is
substantially responsive tender is one which conforms to all the terms, conditions and specifications of
the tender documents without material deviation or reservation.
A material deviation or reservation is one which affects in any substantial way the scope, quality or
performance of the works, or which limits in any substantial way, the Employer's rights or the Tender's
obligations under the Contract, or which is substantially inconsistent with the tender documents and
the rectification of which deviation or reservation would affect unfairly the competitive position of
other Tenderers presenting substantially responsive tenders.
If a tender is not substantially responsive to the requirement of the tender documents, it will be
rejected by the Employer and may not subsequently be made responsive by the Tenderer having
corrected or withdrawn the non-conforming deviation or reservation.
h. Inspection of Drawings
Before tendering the Contractor should examine the drawings which may be seen at the offices of the
Architect during normal office hours, and shall satisfy himself regarding their detail as no claim by
reason of ignorance in this connection will be entertained.
i. Preparation of Tender
No claim will be allowed for travelling or other expenses which may be incurred by the Contractor in
visiting the site or preparing the Tender for the works.
j. Correction of Errors
Tenders determined to be substantially responsible will be checked by the Employer for any arithmetic
error in computation and summation. Errors will be corrected by the Employer as follows:-
a. Where there is a discrepancy between amounts in figures and in words, the amount in words will
govern; and
INSTRUCTIONS TO TENDERERS
b) Where there is a discrepancy between the unit rate and the total amount derived, from the
multiplication of the unit rate and the quantity, the unit rate as quoted will govern, unless in the
opinion of the Employer there is an obviously gross misplacement of the decimal point in the unit rate
in which event the total amount as quoted will govern and the unit rate be corrected.
Notwithstanding the adjustments as aforesaid, the amounts stated on the Form of Tender shall be
taken as absolute and therefore shall not be changed.
In the event of discrepancy between the tender amounts as stated in the Form of Tender and the
corrected tender figure as stated in the Main Summary of the Bills of Quantities the following
procedure shall be adopted:
i. The tender amount as stated in Form of tender shall override the tender amount in the Main
Summary after correction.
Such discrepancy will be notified to the tenderer who will then have the opportunity of confirming
or withdrawing his tender.
ii) the difference between the tender amount and the corrected tender sum shall be expressed as a
percentage of the corrected tender sum nett of preliminaries, Prime Costs and Provisional Sums as a
"Correction Factor"
iii) the above "Correction Factor" shall be applied as a reduction or an addition as the case may be to
adjust the Contractor's rates in the Bills of Quantities for the evaluation of variations. Valuations for
interim certificates and measurements for final accounts.
iv) Any discount given by the tenderer shall be treated as a discrepancy in accordance with sub-
paragraph (ii) above.
k. Preliminaries Section
Where this section should be keenly and consistently priced, no front loading shall be allowed. Any
amount which is the opinion of the Employer has been frontloaded shall be relocated in the measured
section of these bills of Quantities otherwise at the discretion of the Employer, the tender shall be
liable to disqualification as irresponsive.
l. Bid Security
For the tender to be valid, the tenderer is required to provide a Bid Security equivalent to 2% (Two
Percent) of the tender amount from a reputable Bank or reputable insurance company giving an
unconditional undertaking to be bound to the Employer in the event that the tenderer withdraws his
tender, refuses or neglects to execute a contract between the tenderer and the Employer upon
receiving a letter of acceptance of the tender from the Employer. This Bid Security is to be submitted
together with the tender as part of the tender documents.
INSTRUCTIONS TO TENDERERS
SUBSTRUCTURES
Site Preparation
Site Clearance
Clear site of tea bushes, scrub, undergrowth and cut down small trees
not exceeding 600mm girth and grub up roots; uproot tree stumps of
A SM 289 50.00 14,467.50
various diameters including grubbing up roots; burn on site or load and
remove from site as directed.
Excavations
E Extra over excavation for excavating in hardrock all classes. CM 9 1,200.00 10,800.00
Disposal of water
H Keep excavations free from all water by baling, pumping or otherwise Item 1 10,000.00 10,000.00
5
PROPOSED STORES/MANAGER`S FLATS
Imported hardcore
Murram blinding
B 50mm Murram blinding to surface of hardcore SM 210 250.00 52,500.00
Antitermite Treatment
Chemical antitermite treatment to murram filling ; Dragnet 30% EC or
C SM 210 380.00 79,800.00
equal and approved : provide ten year guarantee
Sawn formwork : to
K Sides of column bases SM 57 700.00 39,900.00
O Vertical edge of bed : over 75 but not exceeding 150mm high LM 63 150.00 9,450.00
Mild steel bar reinforcement to BS 4449 and High tensile steel bar
reinforcement to BS 4461 (Provisional)
6
PROPOSED STORES/MANAGER`S FLATS
7
PROPOSED STORES/MANAGER`S FLATS
SUBSTRUCTURES
COLLECTION
Page Amount
2 2,343,110.00
3 187,200.00
8
PROPOSED STORES/MANAGER`S FLATS
GROUND FLOOR
ELEMENT No.1
REINFORCED CONCRETE SUPERSTRUCTURE
Sawn formwork : to
9
PROPOSED STORES/MANAGER`S FLATS
WALLING
NATURAL STONEWORK
Walls
A 200mm thick; SM 233 1,800.00 419,400.00
C Precast concrete vent blocks in cement sand mortar( 1:3) SM 11 1,200 13,200.00
10
PROPOSED STORES/MANAGER`S FLATS
DOORS
External Doors
Steel Doors
Purpose made standard section steel doors : supplied with handles,
two lever mortice lock and hinges fixed with lugs built into
concrete or stone walls : pointed externally in mastic : one shop
coat primer
Steel door size 900 x 2100mm high : comprising 1 no door size 850 x
2060mm high x with glazed panels each size 300 x 300mm : and a 900
A x 900mm high bottom panel welded over with 3mm flat one face : and No 2 12,000.00 24,000.00
1 no fixed top fanlight 300mm high.
11
PROPOSED STORES/MANAGER`S FLATS
EXTERNAL FINISHES
WALL FINISHES
INSITU FINISHINGS
Plastered surface
Walls
12
PROPOSED STORES/MANAGER`S FLATS
INTERNAL FINISHES
WALL FINISHES
INSITU FINISHINGS
13
PROPOSED STORES/MANAGER`S FLATS
FLOOR FINISHES
INSITU FINISHINGS
BEDS OR BACKINGS
14
PROPOSED STORES/MANAGER`S FLATS
CEILING FINISHES
coat of cement and sand (1:3); steel trowelled
15
PROPOSED STORES/MANAGER`S FLATS
16
PROPOSED STORES/MANAGER`S FLATS
STAIRCASE FINISHES
BEDS OR BACKINGS
GRANO FINISH
17
PROPOSED STORES/MANAGER`S FLATS
CEILING FINISHES
INSITU FINISHINGS
To collection 3,880.00
STAIRCASE FINISHES
COLLECTIONS
18
PROPOSED STORES/MANAGER`S FLATS
19
PROPOSED STORES/MANAGER`S FLATS
GROUND FLOOR
SECTION SUMMARY Amount
1 SUBSTRUCTRURES 2,746,882.50
3 WALLING 441,840.00
4 DOORS 24,000.00
20
PROPOSED STORES/MANAGER`S FLATS
GROUND FLOOR
ELEMENT No.1
REINFORCED CONCRETE SUPERSTRUCTURE
Sawn formwork : to
21
PROPOSED STORES/MANAGER`S FLATS
WALLING
NATURAL STONEWORK
Walls
A 200mm thick SM 464 1,800.00 835,200.00
22
PROPOSED STORES/MANAGER`S FLATS
GENERAL JOINERY
Frames
Quadrants
Arhitraves
45mm Thick solid core MDF single door; veneer faced both sides,
E overall size 750 mm x 2050mm high, Ditto NO 8 15,000.00 120,000.00
IRONMONGERY
G Three lever mortice lock as "UNION or equal and approved NO 8 3,500.00 28,000.00
H Two lever mortice lock as "UNION" or equal and approved NO 12 2,500.00 30,000.00
23
PROPOSED STORES/MANAGER`S FLATS
General Surfaces
Doors
24
PROPOSED STORES/MANAGER`S FLATS
25
PROPOSED STORES/MANAGER`S FLATS
WALL FINISHES
INSITU FINISHINGS
Plastered surface
Walls
26
PROPOSED STORES/MANAGER`S FLATS
INTERNAL FINISHES
WALL FINISHES
INSITU FINISHINGS
Porcelain wall tiles : allow the prime cost (PC) rate of Kshs. 1,500/=
per m2 plus VAT for purchasing as selected by the Architect : take
delivery, transport to site, store and fix with an approved adhesive :
cement and sand screeds measured separately : to
BEDS OR BACKINGS
27
PROPOSED STORES/MANAGER`S FLATS
FLOOR FINISHES
INSITU FINISHINGS
BEDS OR BACKINGS
28
PROPOSED STORES/MANAGER`S FLATS
CEILING FINISHES
coat of cement and lime putty (1:5); steel trowelled
29
PROPOSED STORES/MANAGER`S FLATS
30
PROPOSED STORES/MANAGER`S FLATS
H 100 mm dia PVC rain water down pipes on concrete columns LM 31 1,000.00 31,000.00
25mm thick cement and sand mix 1:4 screed to plinth, finished
C smooth with niro finish. SM
7 500.00 3,500.00
Work top
31
PROPOSED STORES/MANAGER`S FLATS
B Overall size 4000mm long x 400mm high x 600mm high NO 2 140,000.00 280,000.00
WARDROBES
Supply and install high level cupboards comprising 18mm thick
veneered MDF particle board bottom, top, side partitions and door
shutters including all necessary HAFELE ironmongery i.e hinges, ball
catches, handles etc and 1No. horizontal particle board shelf, all in
accordance with the Architect's details and approval
32
PROPOSED STORES/MANAGER`S FLATS
COLLECTIONS
BEDS OR BACKINGS
E To riser LM 18 75 1,350.00
GRANO FINISH
33
PROPOSED STORES/MANAGER`S FLATS
CEILING FINISHES
INSITU FINISHINGS
To collection 5,238.00
34
PROPOSED STORES/MANAGER`S FLATS
STAIRCASE FINISHES
COLLECTIONS
2 WALLING 925,200.00
3 DOORS 968,500.00
35
PROPOSED STORES/MANAGER`S FLATS
36
BILLS OF QUANTITIES
FOR
STORES AND 2NO STAFF APARTMENTS
SECTION SUMMARY
2 Preliminaries 791,956.06
1,/29
4/1
CHANGING ROOMS
SUBSTRUCTURES
(ALL PROVISIONAL)
Page 38
CHANGING ROOMS
Page 39
CHANGING ROOMS
Page 40
CHANGING ROOMS
C To vertical edges of ground floor slab 75-150 mm high LM 136 200.00 27,200.00
Page 41
CHANGING ROOMS
Page 42
CHANGING ROOMS
Page 43
CHANGING ROOMS
WALLING
C Precast concrete vents jointed in cement and sand (1:3) SM 12 1,200.00 14,400.00
Page 44
CHANGING ROOMS
ROOF COVERING
Page 45
CHANGING ROOMS
WINDOWS (PROVISIONAL)
Page 46
CHANGING ROOMS
Page 47
CHANGING ROOMS
DOORS
Frames
A 150mm x 50mm thick; twice rebated L.M 77 2,200.00 169,400.00
Quadrants
Arhitraves
DOORS
D Take deliver and fix Impoted doors size 800x2100 NO 13 2,000.00 26,000.00
Steel Doors
G 900X 2400mm high Steel grill door ditto but single leave NO 1 30,000.00 30,000.00
Page 48
CHANGING ROOMS
General Surfaces
Timber Doors
Page 49
CHANGING ROOMS
INSITU FINISHINGS
A Plastered surface
Walls
plastered wall surfaces; 300mm girth; external SM 249 500.00 124,500.00
Page 50
CHANGING ROOMS
WALL FINISHES
INSITU FINISHINGS
Saj ceramic wall tiles : allow the prime cost (PC) rate of
Kshs. 1,500/= per m2 plus VAT for purchasing as selected by
the Architect : take delivery, transport to site, store and fix
with an approved adhesive : cement and sand screeds
measured separately : to
Page 51
CHANGING ROOMS
FLOOR FINISHES
INSITU FINISHINGS
BEDS OR BACKINGS
Page 52
CHANGING ROOMS
CEILING FINISHES
Gypsum ceilings
Page 53
CHANGING ROOMS
Page 54
CHANGING ROOMS
Grand summary
SECTION SUMMARY Amount
1 SUBSTRUCTURE 1,116,848.94
2 WALLING 605,678.80
4 WINDOWS 69,250.00
5 DOORS 510,565.00
Page 55
BILLS OF QUANTITIES
FOR
CHANGING ROOMS
SECTION SUMMARY
2 Preliminaries 548,155.27
2,/16
4/1
STAFFROOMS
SUBSTRUCTURES
(ALL PROVISIONAL)
Page 57
STAFFROOMS
Page 58
STAFFROOMS
F To vertical edges of ground floor slab 75-150 mm high LM 366 200.00 73,200.00
Page 59
STAFFROOMS
Page 60
STAFFROOMS
Page 61
STAFFROOMS
WALLING
C Precast concrete vents jointed in cement and sand (1:3) SM 10 1,200.00 12,000.00
Page 62
STAFFROOMS
Page 63
STAFFROOMS
ROOF COVERING
Page 64
STAFFROOMS
Page 65
STAFFROOMS
WINDOWS (PROVISIONAL)
METAL WORK
Page 66
STAFFROOMS
DOORS
Frames
A 150mm x 50mm thick; twice rebated L.M 280 2,200.00 616,000.00
Quadrants
Arhitraves
Page 67
STAFFROOMS
IRONMONGERY
General Surfaces
Timber Doors
Page 68
STAFFROOMS
INSITU FINISHINGS
B Plastered surface
Walls
plastered wall surfaces; 300mm girth; external 945 SM 500.00 472,500.00
Page 69
STAFFROOMS
WALL FINISHES
INSITU FINISHINGS
Page 70
STAFFROOMS
FLOOR FINISHES
INSITU FINISHINGS
BEDS OR BACKINGS
Page 71
STAFFROOMS
CEILING FINISHES
Gypsum ceilings
Page 72
STAFFROOMS
Grand summary
SECTION SUMMARY Amount
1 SUBSTRUCTURE 8,012,358.00
2 WALLING 3,856,020.00
4 WINDOWS 382,750.00
5 DOORS 3,069,010.00
Page 73
BILLS OF QUANTITIES
FOR
STAFF ROOMS
SECTION SUMMARY
2 Preliminaries 2,745,698.80
3,/16
4/1
BILLS OF QUANTITIES
FOR
PROPOSED DEVELOPMENT ON PLOT NO 563 BUNGOMA COUNTY
MAIN SUMMARY
Kenya Shillings:-
……………………………..…………………………………………………………………………………………………………………………………………………………………..
……………………………..…………………………………………………………………………………………………………………………………………………………………..
4/1
…………………..
…………………..
4/1