NOTE:

1. PROCESS CONNECTION
1:12 2. PRE INSULATED TUBING TO BE USED WHERE REQUIRED

3. WHERE OPERATING PRESSURE ARE ABOVE 5 BARG FOR LIQUID APPLICATION


THIS HOOK-UP CAN BE USED

4. 6mm TEST CONNECTION WITH BLIND PLUGG

5. USE OF DBAB (DOUBLE BLOCK AND BLEED) IS SERVICE DEPENDANT

NOTE 2

NOTE 4

NORSOK
INSTRUMENT STAND 316 SS

1:12 50mm NB
PIPE

INSTR.

PIPING
NOTE 1

DBAB NOTE 5

PROJECT NAME:

NORSOK TITLE:
INSTRUMENT HOOK-UP DIAGRAM

01 01.06.07 ORIGINAL RP GG GG PRESS. TRANSMITTER GAS SERVICE

SCALE: SYSTEM WORK DRAWING NO:


CONTRACTOR COMPANY NO: PACK I-001-108 01
NO:
REV. DATE DESCRIPTION
PREPERED CHECKED APPROVED REVIEW ACCEPTED PROJECT DISC DOC.TYPE SEQ.NO. SHT.NO. REV.