You are on page 1of 2

SCODE PROJECT PLAN

PROJECT NAME SCODE SMALL BUSINESS PROJECT PLAN PROJECT MANAGER MR.OSAMA ZAID AL-ZEHRANI

INSTALLER RENJITH K NAIR


THIS PROJECTS CONTAIN TERMINATION OF NETWORK NODES AND BASIC HARDWARE REQUIREMNT INSTALLATION &
SCOPE STATEMENT
CONFIGURATION
OVERALL
START DATE END DATE
PROGRESS

AT DURATIO
START END
RIS TASK NAME ASSIGNED TO N STATUS
DATE DATE
K in days

1 TERMINATION OF NETWORK NODES, FIXING CABINET RENJITH K NAIR 1 NOT YET STARTED

TERMINATION AND FIXING OF PATCH CORD INISIDE NETWORK


2 CABINET
RENJITH K NAIR 1 NOT YET STARTED

3 INSTALLATION OF NETWORK SWITCH AND CONFIGURATION RENJITH K NAIR 1 NOT YET STARTED

4 INSTALLATION AND CONFIGURATION OF WINDOWS DESKTOP RENJITH K NAIR 1 NOT YET STARTED

INSTALLATION OF UTILITY SOFTWARE AND WINDOWS


5 OPERATING SYSTEM
RENJITH K NAIR 1 NOT YET STARTED