You are on page 1of 1

TEKNIK JALAN REL UNIVERSITAS MUHAMMADIYAH PAREPARE

+80

+75

+70

+65

+60

+55

+50

+45

+40

+35

+30

+25

+20

+15

STA 24+800 25+000 25+200 25+400 25+600 25+800 26+000 26+200 26+400 26+600 26+800 27+000 27+200 27+400 27+600 27+800 28+000 28+200 28+400 28+600 28+800 29+000 29+200 29+400 29+600 29+800 30+000 30+200 30+400 30+600 30+800 31+000
Jarak Antar
STA (m) 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100

Jarak
komulatif(m) 12500 12600 12700 12800 12900 13000 13100 13200 13300 13400 13500 13600 13700 13800 13900 14000 14100 13400 14200 14300 14400 14500 14600 14700 14800 14900 15000 15100 15200 15300 15400
+76.00

+76.00

+76.00

+76.00

+75.00

+74.00

+74.00

+72.00

+74.00

+73.00

+72.00

+72.00

+72.00

+72.00
+71.00 +77.00

+71.00 +77.00

+71.00 +76.00

+71.00 +75.00

+71.00 +75.00

+71.00 +73.00

+71.00 +73.00

+68.30 +72.00

+64.80 +71.00

+62.90 +70.00
+71.00 +79.00

+71.00 +77.00

+71.00 +77.00

+63.90 +71.00

+62.90 +71.00

+62.90 +70.00

+62.90 +71.00
Elavasi Tanah
Asli (m)
+71.00

+71.00

+71.00

+71.00

+71.00

+71.00

+71.00

+71.00

+71.00

+70.10

+69.20

+67.40

+66.50

+65.50
Elavasi Jalan
Rencana (m)
Kelandaian
0.00 -1.00 0.00 -1.00 +1.00 0.00 -1.00 0.00 -1.00 0.00 -1.00 0.00 -1.00 0.00 -1.00 +2.00 -1.00 0.00 -1.00 0.00 -1.00 +1.00 -1.00
tanah Asli(%)
Kelandaian
Jalan Rencana 10%

JURUSAN TEKNIK SIPIL


KETERANGAN FAKULTAS TEKNIK
LEGENDA LUAS GALIAN UNIVERSITAS MUHAMMADIYAH PARE PARE
J al an : J endr al Ahmad Y ani K m 6 K ot a Par e-par e
Elevasi Tanah Asli
TUGAS JALAN REL
Elevasi Jalan Raya SKALA
POTONGAN MEMANJANG TRASE 1
STA 24+800 SAMPAI 31+000 1 : 150000
Galian LUAS timbunan
DIKERJAKAN OLEH : DIPERIKSA OLEH :

Timbunan

NURUL (219190027) Ir. ANDRIYANI, ST,.MT

TEKNIK SIPIL A NURUL 219190027