Day} Date ccthvity
Thursday | 03/07/2022
Daily routine check of all LO Levels machinery,
Rautine check parameters running machinery
Check and inspected Ro water maker leaks
‘Transferred fuel oil to settling tank from tank no.? center
Check fresh water pipes line
Ro water maker production = 3 m3
Dismantled Ro water maker and recti
| Added t=
LioAEL
Friday 02/07/2021.
Daily routing check of all LO Levels machinery.
Routine check parameters running machinery
Check and inspected Ro water maker leaks
Ro water maker production = m3
| Continue to welded Chain channels on deck port side welded
General cleaning in Engine room
Inspected sil pipes line in AE
Saturday | 03/07/2021
Daily rautine check of all LO Levels machinery.
Routine check parameters running machinery
Check and inspected Ro water maker leaks
Ro water maker production = 3 m3
Replaced turbo charger ME foam filter and spare cleaned
heck and inspected shaft with blade of ME turbo charee”
“Cleaned of all thermo meters exhaust ME
| Cut out 215m of steel plate from twin deck far chain tunnels on
deck stbd side need to fabricated and replaced.
sunaay | 99/070
Daily routine check of all LO Levels machinery.
Routine check paraneters running machinery
Cheek and insneeted Ro water maker leaks
Ro water maker production = 4 m3
Installed turbo charger ME and retighten bolt) nuts
Cut out frame steel chain channels in sthd side on deck
Clean E/R floor plates
Monday 05/07/2021
[Daily routine check of all LO Levels machinery
Routine check parameters running machinery
Check and inspected Ro water maker leaks
Ro water maker production = 4 m3 _
Chain tunnels sthd side on deck continue cut oul to replaced with
new steel
Page 1 of 7[DENMARINE ce Rey 01; 0503/2021 ‘To be filed: ISM
{— |
Approved by: Manager Prep. by:Denmarine Form No.P14
Ships mame: MVRALTIC Vessel Copy =
[TRADER
Transferred fuel oll ta AE day tank
E/R Floor plate cleaned
Tuesday 06/07/2021
Daily routine check of all LO Levels machinery.
Routine eheck parameters running machinery
Check and inspected Ro water maker leaks
Rowater maker production = 3 m3
Frame steel chain tunnels on deck stbd side installed by welding
machine properly
| Wednesday | 07/07/2004
Daily routine check of a 10 Levels machinery,
Routing check parameters running machinery
Check and inspected Ro water maker leaks
Ro water maker production = 3 m3
‘On deck crane hand real rectified by welding machine
Thursday 8/07/2021,
Daily routine check of all LO Levels machinery.
Routine check parameters running machinery
Check and inspected Ro water maker leaks
Ro water maker production = 2 m3
Maintenance of AE#1 renewed LO Crank case =30 L and ail filter = 1
‘nos replaced fuel filter primary & secondary
Replaced day light 32 watts on bridge ladder
Replaced tubes light = 2 nos at twin deck at esealator
Do welding at stbd side on deck chain tunnel plates
Friday (08/07/2021 | Daily routine check of all LO Levels mac
Rautine check parameters running machinery
Gheck and inspected Ro water maker leaks “|
[= Ro water maker production = 2.m3
Replaced tube light 10 W in CEO toilet = 01 nos
___[ Replaced fuse 35 A for galley oven = 03 nos
Added 10 = 2 to AE 2
Started AE3 at: 08: 15 HRS
ME started at : 08:20 HRS_
ME Stopped at 10: 30 HRS
L Surveyor visit on board to inspected the vessel
[Saturday | 10/07/2021 | Daily routine check of all LO Levels machinery,
Routine check parameters running machinery
‘Check of fuel w/v and pipes line sty for bunkering
Bunkering started ati11:08 hrs and stopped at : 11:56 hrs received qty
= 25.973 m3 / 30.037 MT transferred in Tank no.3 center.
Page 2 of 7| DENMARINE ce
tev 1 O5OS2021 To be filed: [SM PileP
Approved
TRADER
: Manager
Ships name: Mv.BALTIC
‘Prep. by:Denmarine Form No.P14
‘Vessel Copy
Sunday
aO7 PROD
Daily rautine check of all LO Levels machinery.
Routine check parameters running machinery
AIR Compressarno.t crank case drained and clean
‘Top up air compressor no.4 = 2 Liters
Check inspected of bolt f nuts coupling air compressor no.1 & 2
Glean the all cover compressor 1 & 2
Purifier fuel suction strainer take out and cleaned
Clean work shop table in Engine room,
Monday
12/07/2020
Daily routine check of all LO Levels machinery.
Routine check parameters running machinery
‘Clean engine raom floor plate and painted at fuel purifier area.
Deck crane dipt trays clean
‘As for oll samples analysis system result the deck crene oil strainer
take out = 2 pc then cleaned then pitted back
Tuesday _|
13/07/2021
Daily routine check of all LO Levels machinery.
| Routine check parameters running machinery
Renewed HO of emergency air compressor
Check and inspected of CAT port klip in twin deck retighten lube oll
filter and cleaned Turbo charger suction filter oifIevels check fuel ei
top up 20 liters, warming, up the ery
‘Check and inspected of TOYOTA port klip in Lower hold deck retighten
bolt f nuts crank case_and cleaned Turbo charger suctian filter, oil
levels check, warming up the engine.
Check leaks from pipes and system for main deck crane.
Wednesday
14/07/2021
Daly routine heck of S10 Levels machinery
Routine check parameters running machinery
Check main deck crane found leaks from sig glasses in solenoid valves
removed for sent sampling to shore contractor.
I up hydraulic oil tank on deck crane quantity = 173 liters
ME Started at 21:15 hrs for ship thing and ME Stopped at 00.20 hrs _
Dipt trays on deck crane cleaned
Check and inspected of life boat by surveyor engine tested found ok
Thursday
35/07/2021
Daily routine check of all LO Levels machinery,
Routine check parameters running machinery
Clean ditp trays deck crane
Replaced fuses deck crane 108/500v =6 NOS
Check of all coofing water levels of AE 1,3
Check aid inspected ofall w/v and pipes line ia E/R
Page 30f7DENMARINE ec
Rev OT: 0503/2021 ‘To be filed: ISM Fi
| Approved hy: Manager
Prep. by:Denmarine Form No.P14
TRADER,
name: MV.RALTIC
Vessel Copy
Dismantled fuel oil purifier and inspected oil seal then cleaned
Friday
16/07/2021
Daily routine check of all LO Levals machinery.
Routine check pararheters running machinery
Assist share technical to check electrical system at main crane on
deck -
Second technical came from shore to check and inspected the
‘electrical crane on deck he check peed pump motor and main
hydraulic motor handle push button fuses and contactors
Saturday
17/07/2021
Baily routine check of all LO Levels machinery.
Routine check parameters running machinery
General maintenance of fuel ail purifier cleaned and oll renewed
inspected oil seal, water chambers cleaned check bolt/nuts
foundation, bow! disc cleaned then property assemblies again
ME Started at 18:00 hrs Vessel cash off to GPL Anchorage
ME Stopped at : 19:35 hrs @PL Anchorage
Ro water maker praduction = 2 m3
Sunday
18/07/2021
Daily routine check of all LO Levels machinery,
Routine check parameters running machinery
Ghack and inspected of all vv and pipes line in E/R
‘AFT bilges suction strainer cleaned and replaced gasket cover,
STBD side eject pump suction strainer take aut then cleaned
General cleaned work shan table and E/R Floor plates
Chiller and freezer compressors inspected
Monday
19/07/2023
Caity routine check of all LO Levels machinery.
Routine check parameters running machinery
‘Check and inspected of all v/v and pipes line in E/R
Engine room entrance and step up / down ladder eleancd
Arranged some store and stored properly
Deck crane motor and pump cleaned
Expansion hydraulic tank bolt / nuts retighten stopped leaks,
| Tuesday
20/07/2021 |
Daily routine check of all LO Levels machinery
Routine check parameters running machinery
‘Check and inspected of al v/v and pipes line in E/R
Received some spare part from alfice
Ro water maker filter replaced = 2 nos
Ro water maker production = 3 m3.
‘Transferred fuel oil to Both ME and AE day tank
Page 4 of7DENMARINE ce
Rev 1: 0503/2021 To be filed: ISM FileP
Approved by: Manager
Form No.P14
TRADER
ps name: MV.RAL
‘Vessel Copy
[ Wednesday
2/07/2021
Daily routine check of all LO Levels machinery.
Routine check parameters running machinery
Check and inspected of ally/vand pipes line in E/Re
Ro water maker production = 3 m3
Forward hatch cover found some holes and do welded
‘Clean engine room floor plates
Thurstay
22/07/2021
Daily routine check of all LO levels machinery,
Routine check parameters running machinery
‘Check and inspected of all v/v and pipes line im E/R
Ro water maker production = 3 m3.
‘Added LO =2 Lto AE #2
‘Twin deck engine store and work shop table removed all items
ide then cleaned a painted progress
Friday
23/07/2021
Daily routine check of all LO Levels machinery.
_| Routine check parameters running machinery
Check and inspected of all viv and pipes line in E/R
Ro water maker production = 3 m3
ME Started to pick up the anchorage and reposition
‘Attend black out drill for all crew
Replaced Sea water cooling ruber impeller of AE#2=1PC and
inspected heat exchanger tube two side,
‘Saturday
24/07/2021
Daily routine check of all LO Levels machinery
Routine check parameters running machinery
Check and inspacted of all v/v and pipes fine in E/ft
Ro water maker production = 3 m3
‘Sea water suction strainer AE# 1,2,2 & ME take out and cleaned
installed Zink anode = 2 °C
Replaced tubes ight in E/R= 2 PC
Replaced Ra water maker filtes
Inspected water cooling pump AE#3 Found lesles dismantled pipe
cooling line and water exchanger
Twin deck engine store and work shop table/ bulkhead clean then
painted
Sunday
25/07/2021
Daily routine check ofall LO Levels machinery,
Routine check parameters manning machinery
Check and inspected of all/v and pipes line
Ro water maker production = 3 m3
ER
Transferred fuel oil to both day tank by purifier
Cut plates 20x24.5cm tor doubling dear hatch forward and due
Page 5 of 7DENMARINE cc
[Rev or: 05/03/2021 [To be filed: ISM FileP
Approved by: Manager
Prep. by:Deamarine Form NoPid_
Ships fame: Mv.naLTiC
TRADER
| Vessel Copy
welded with lock door.
Clean E/R floor plates.
Monday
26/07/2021 | Daily routine check of all LO Levels machinery.
Routine check parameters running machinery
_Check and inspected of all v/v and pipes line in E/R
Ro water maker production
Continued painted the bulkhead engine store and work shop table at
twin deck area
‘Check AE Spare part
Tuesday
27/07/2021 | Daily routine check of all LO Levels machinery,
Routine check parameters nunning machinery
‘Check and inspected of all v/v and pipes line in E/R
‘Check spare part in engine room
‘Clean E/R floor pl
Transferred fuel oil to Both day tank
‘Wednesday
28/07/2021 | Daily routine check of all LO Levels machinery.
Routine check parameters running machinery
inspected of al v/v and pipes ine im ER
resistant test / taken Megzer test of all electrical and pump,
General cleaned in E/8,
“Arranged some stored in bwin deck workshop.
Replaced blower fuse in Et
Thursday
Daily routine check of all LO Levels machinery.
Routing check parameters running machinery
"| Check and inspected of all v/v and pipes line in E/R
Insulation resistant test J taken Megzer test of all electrical and pump |
Check all of machinery in Engine roorn |
‘Added LO = 2Lt0 AEL
Ro water maker production = 3
Friday
30/07/2084
Gil level of AE#1 and air compressor were checked
Replaced fuse of blower Engine room = 1 pe
[Operation of fresh water maker
‘The fresh water pump of AE # 3 repaired at workshop is being
installed back.
ayo
ne check: Oil level and bilge. _ _
15 of AE HiT The AEH3 coolant pump was installed
back (Leaking).
The coolant purnp of AEs being removed again,
Page 6.af7DENMARINE ce Rev 01; 05/03/2021 To be filed: ISM Fil
Approved by: Manager Prep. by:Denmarine Form No.P14
Ships mame: Mv.narie Vessel Copy
[TRADER
Prepared by:
Roelio Torres Sardi
Chief Engineer ull