You are on page 1of 7
| DENMARINE ce Rev 01; 05/03/2021 To be filed: ISM FileP Approved by: Manager Prep. by:Denmarine Form NoPi Ships name: MV.RALIC Vessel Copy [ikapeR— Day} Date ccthvity Thursday | 03/07/2022 Daily routine check of all LO Levels machinery, Rautine check parameters running machinery Check and inspected Ro water maker leaks ‘Transferred fuel oil to settling tank from tank no.? center Check fresh water pipes line Ro water maker production = 3 m3 Dismantled Ro water maker and recti | Added t= LioAEL Friday 02/07/2021. Daily routing check of all LO Levels machinery. Routine check parameters running machinery Check and inspected Ro water maker leaks Ro water maker production = m3 | Continue to welded Chain channels on deck port side welded General cleaning in Engine room Inspected sil pipes line in AE Saturday | 03/07/2021 Daily rautine check of all LO Levels machinery. Routine check parameters running machinery Check and inspected Ro water maker leaks Ro water maker production = 3 m3 Replaced turbo charger ME foam filter and spare cleaned heck and inspected shaft with blade of ME turbo charee” “Cleaned of all thermo meters exhaust ME | Cut out 215m of steel plate from twin deck far chain tunnels on deck stbd side need to fabricated and replaced. sunaay | 99/070 Daily routine check of all LO Levels machinery. Routine check paraneters running machinery Cheek and insneeted Ro water maker leaks Ro water maker production = 4 m3 Installed turbo charger ME and retighten bolt) nuts Cut out frame steel chain channels in sthd side on deck Clean E/R floor plates Monday 05/07/2021 [Daily routine check of all LO Levels machinery Routine check parameters running machinery Check and inspected Ro water maker leaks Ro water maker production = 4 m3 _ Chain tunnels sthd side on deck continue cut oul to replaced with new steel Page 1 of 7 [DENMARINE ce Rey 01; 0503/2021 ‘To be filed: ISM {— | Approved by: Manager Prep. by:Denmarine Form No.P14 Ships mame: MVRALTIC Vessel Copy = [TRADER Transferred fuel oll ta AE day tank E/R Floor plate cleaned Tuesday 06/07/2021 Daily routine check of all LO Levels machinery. Routine eheck parameters running machinery Check and inspected Ro water maker leaks Rowater maker production = 3 m3 Frame steel chain tunnels on deck stbd side installed by welding machine properly | Wednesday | 07/07/2004 Daily routine check of a 10 Levels machinery, Routing check parameters running machinery Check and inspected Ro water maker leaks Ro water maker production = 3 m3 ‘On deck crane hand real rectified by welding machine Thursday 8/07/2021, Daily routine check of all LO Levels machinery. Routine check parameters running machinery Check and inspected Ro water maker leaks Ro water maker production = 2 m3 Maintenance of AE#1 renewed LO Crank case =30 L and ail filter = 1 ‘nos replaced fuel filter primary & secondary Replaced day light 32 watts on bridge ladder Replaced tubes light = 2 nos at twin deck at esealator Do welding at stbd side on deck chain tunnel plates Friday (08/07/2021 | Daily routine check of all LO Levels mac Rautine check parameters running machinery Gheck and inspected Ro water maker leaks “| [= Ro water maker production = 2.m3 Replaced tube light 10 W in CEO toilet = 01 nos ___[ Replaced fuse 35 A for galley oven = 03 nos Added 10 = 2 to AE 2 Started AE3 at: 08: 15 HRS ME started at : 08:20 HRS_ ME Stopped at 10: 30 HRS L Surveyor visit on board to inspected the vessel [Saturday | 10/07/2021 | Daily routine check of all LO Levels machinery, Routine check parameters running machinery ‘Check of fuel w/v and pipes line sty for bunkering Bunkering started ati11:08 hrs and stopped at : 11:56 hrs received qty = 25.973 m3 / 30.037 MT transferred in Tank no.3 center. Page 2 of 7 | DENMARINE ce tev 1 O5OS2021 To be filed: [SM PileP Approved TRADER : Manager Ships name: Mv.BALTIC ‘Prep. by:Denmarine Form No.P14 ‘Vessel Copy Sunday aO7 PROD Daily rautine check of all LO Levels machinery. Routine check parameters running machinery AIR Compressarno.t crank case drained and clean ‘Top up air compressor no.4 = 2 Liters Check inspected of bolt f nuts coupling air compressor no.1 & 2 Glean the all cover compressor 1 & 2 Purifier fuel suction strainer take out and cleaned Clean work shop table in Engine room, Monday 12/07/2020 Daily routine check of all LO Levels machinery. Routine check parameters running machinery ‘Clean engine raom floor plate and painted at fuel purifier area. Deck crane dipt trays clean ‘As for oll samples analysis system result the deck crene oil strainer take out = 2 pc then cleaned then pitted back Tuesday _| 13/07/2021 Daily routine check of all LO Levels machinery. | Routine check parameters running machinery Renewed HO of emergency air compressor Check and inspected of CAT port klip in twin deck retighten lube oll filter and cleaned Turbo charger suction filter oifIevels check fuel ei top up 20 liters, warming, up the ery ‘Check and inspected of TOYOTA port klip in Lower hold deck retighten bolt f nuts crank case_and cleaned Turbo charger suctian filter, oil levels check, warming up the engine. Check leaks from pipes and system for main deck crane. Wednesday 14/07/2021 Daly routine heck of S10 Levels machinery Routine check parameters running machinery Check main deck crane found leaks from sig glasses in solenoid valves removed for sent sampling to shore contractor. I up hydraulic oil tank on deck crane quantity = 173 liters ME Started at 21:15 hrs for ship thing and ME Stopped at 00.20 hrs _ Dipt trays on deck crane cleaned Check and inspected of life boat by surveyor engine tested found ok Thursday 35/07/2021 Daily routine check of all LO Levels machinery, Routine check parameters running machinery Clean ditp trays deck crane Replaced fuses deck crane 108/500v =6 NOS Check of all coofing water levels of AE 1,3 Check aid inspected ofall w/v and pipes line ia E/R Page 30f7 DENMARINE ec Rev OT: 0503/2021 ‘To be filed: ISM Fi | Approved hy: Manager Prep. by:Denmarine Form No.P14 TRADER, name: MV.RALTIC Vessel Copy Dismantled fuel oil purifier and inspected oil seal then cleaned Friday 16/07/2021 Daily routine check of all LO Levals machinery. Routine check pararheters running machinery Assist share technical to check electrical system at main crane on deck - Second technical came from shore to check and inspected the ‘electrical crane on deck he check peed pump motor and main hydraulic motor handle push button fuses and contactors Saturday 17/07/2021 Baily routine check of all LO Levels machinery. Routine check parameters running machinery General maintenance of fuel ail purifier cleaned and oll renewed inspected oil seal, water chambers cleaned check bolt/nuts foundation, bow! disc cleaned then property assemblies again ME Started at 18:00 hrs Vessel cash off to GPL Anchorage ME Stopped at : 19:35 hrs @PL Anchorage Ro water maker praduction = 2 m3 Sunday 18/07/2021 Daily routine check of all LO Levels machinery, Routine check parameters running machinery Ghack and inspected of all vv and pipes line in E/R ‘AFT bilges suction strainer cleaned and replaced gasket cover, STBD side eject pump suction strainer take aut then cleaned General cleaned work shan table and E/R Floor plates Chiller and freezer compressors inspected Monday 19/07/2023 Caity routine check of all LO Levels machinery. Routine check parameters running machinery ‘Check and inspected of all v/v and pipes line in E/R Engine room entrance and step up / down ladder eleancd Arranged some store and stored properly Deck crane motor and pump cleaned Expansion hydraulic tank bolt / nuts retighten stopped leaks, | Tuesday 20/07/2021 | Daily routine check of all LO Levels machinery Routine check parameters running machinery ‘Check and inspected of al v/v and pipes line in E/R Received some spare part from alfice Ro water maker filter replaced = 2 nos Ro water maker production = 3 m3. ‘Transferred fuel oil to Both ME and AE day tank Page 4 of7 DENMARINE ce Rev 1: 0503/2021 To be filed: ISM FileP Approved by: Manager Form No.P14 TRADER ps name: MV.RAL ‘Vessel Copy [ Wednesday 2/07/2021 Daily routine check of all LO Levels machinery. Routine check parameters running machinery Check and inspected of ally/vand pipes line in E/Re Ro water maker production = 3 m3 Forward hatch cover found some holes and do welded ‘Clean engine room floor plates Thurstay 22/07/2021 Daily routine check of all LO levels machinery, Routine check parameters running machinery ‘Check and inspected of all v/v and pipes line im E/R Ro water maker production = 3 m3. ‘Added LO =2 Lto AE #2 ‘Twin deck engine store and work shop table removed all items ide then cleaned a painted progress Friday 23/07/2021 Daily routine check of all LO Levels machinery. _| Routine check parameters running machinery Check and inspected of all viv and pipes line in E/R Ro water maker production = 3 m3 ME Started to pick up the anchorage and reposition ‘Attend black out drill for all crew Replaced Sea water cooling ruber impeller of AE#2=1PC and inspected heat exchanger tube two side, ‘Saturday 24/07/2021 Daily routine check of all LO Levels machinery Routine check parameters running machinery Check and inspacted of all v/v and pipes fine in E/ft Ro water maker production = 3 m3 ‘Sea water suction strainer AE# 1,2,2 & ME take out and cleaned installed Zink anode = 2 °C Replaced tubes ight in E/R= 2 PC Replaced Ra water maker filtes Inspected water cooling pump AE#3 Found lesles dismantled pipe cooling line and water exchanger Twin deck engine store and work shop table/ bulkhead clean then painted Sunday 25/07/2021 Daily routine check ofall LO Levels machinery, Routine check parameters manning machinery Check and inspected of all/v and pipes line Ro water maker production = 3 m3 ER Transferred fuel oil to both day tank by purifier Cut plates 20x24.5cm tor doubling dear hatch forward and due Page 5 of 7 DENMARINE cc [Rev or: 05/03/2021 [To be filed: ISM FileP Approved by: Manager Prep. by:Deamarine Form NoPid_ Ships fame: Mv.naLTiC TRADER | Vessel Copy welded with lock door. Clean E/R floor plates. Monday 26/07/2021 | Daily routine check of all LO Levels machinery. Routine check parameters running machinery _Check and inspected of all v/v and pipes line in E/R Ro water maker production Continued painted the bulkhead engine store and work shop table at twin deck area ‘Check AE Spare part Tuesday 27/07/2021 | Daily routine check of all LO Levels machinery, Routine check parameters nunning machinery ‘Check and inspected of all v/v and pipes line in E/R ‘Check spare part in engine room ‘Clean E/R floor pl Transferred fuel oil to Both day tank ‘Wednesday 28/07/2021 | Daily routine check of all LO Levels machinery. Routine check parameters running machinery inspected of al v/v and pipes ine im ER resistant test / taken Megzer test of all electrical and pump, General cleaned in E/8, “Arranged some stored in bwin deck workshop. Replaced blower fuse in Et Thursday Daily routine check of all LO Levels machinery. Routing check parameters running machinery "| Check and inspected of all v/v and pipes line in E/R Insulation resistant test J taken Megzer test of all electrical and pump | Check all of machinery in Engine roorn | ‘Added LO = 2Lt0 AEL Ro water maker production = 3 Friday 30/07/2084 Gil level of AE#1 and air compressor were checked Replaced fuse of blower Engine room = 1 pe [Operation of fresh water maker ‘The fresh water pump of AE # 3 repaired at workshop is being installed back. ayo ne check: Oil level and bilge. _ _ 15 of AE HiT The AEH3 coolant pump was installed back (Leaking). The coolant purnp of AEs being removed again, Page 6.af7 DENMARINE ce Rev 01; 05/03/2021 To be filed: ISM Fil Approved by: Manager Prep. by:Denmarine Form No.P14 Ships mame: Mv.narie Vessel Copy [TRADER Prepared by: Roelio Torres Sardi Chief Engineer ull Page of 7

You might also like