Professional Documents
Culture Documents
M.
1.00 M. 1.00 M. 1.00 M. 1.00 M. 1.00 M. 1.00 M. 1.00 M. 1.00 M. 1.00 M. 1.00 M. 1.00 M. 0.98 M. 2.40 0.77 M.
0.77 M. 0.75 M.0.75 M.
12.00 M. 0.77 M.
0.90 M.
0.90 M.
FLOOR LINE
FLOOR LINE
NOTE: USE 2" G.I. PIPE SCHED.40
LOCATION: WORLD VISION BUILDING NOTE: USE 2" G.I. PIPE SCHED.40
QTY: 1 UNIT LOCATION: SENIOR HIGH SCHOOL BUILDING
QTY: 1 UNIT
2" G.I. PIPE SCHED. 40
6.00 M. FLOOR LINE
1.00 M. 1.00 M. 1.00 M. 1.00 M. 1.00 M. 1.00 M. 10mm Ø RSB
0.30 M.
0.90 M.
FLOOR LINE CONCRETE MIXTURE
0.05 M.
2" GRAVEL IN BED
NOTE: USE 2" G.I. PIPE SCHED.40
LOCATION: DOWN TO BAGONG LIPUNAN BUILDING
0.20 M.
QTY: 1 UNIT
COLUMN FOOTING DETAIL
SCALE: 1:10 MTS
DEPARTMENT OF EDCATION PROJECT TITLE: PREPARED BY: CHECKED BY: RECOMMENDING APPROVAL: SHEET NO.
DIVISION OF AKLAN
DISTRICT OF BATAN
BAY-ANG MAGPAG-ONG NATIONAL HIGH SCHOOL CONSTRUCTION OF CORRIDOR RAILINGS FREDD SHERWIN N. PANIM
TEACHER 1 / ARCH. DRAFTSMAN
RAMAR B. BALADJAY
HEAD TEACHER 1
1/1
BAY-ANG, BATAN, AKLAN