11.98 M. 1.50 M.

M.
1.00 M. 1.00 M. 1.00 M. 1.00 M. 1.00 M. 1.00 M. 1.00 M. 1.00 M. 1.00 M. 1.00 M. 1.00 M. 0.98 M. 2.40 0.77 M.
0.77 M. 0.75 M.0.75 M.
12.00 M. 0.77 M.

0.90 M.

0.90 M.
FLOOR LINE
FLOOR LINE
NOTE: USE 2" G.I. PIPE SCHED.40
LOCATION: WORLD VISION BUILDING NOTE: USE 2" G.I. PIPE SCHED.40
QTY: 1 UNIT LOCATION: SENIOR HIGH SCHOOL BUILDING
QTY: 1 UNIT
2" G.I. PIPE SCHED. 40
6.00 M. FLOOR LINE
1.00 M. 1.00 M. 1.00 M. 1.00 M. 1.00 M. 1.00 M. 10mm Ø RSB

0.30 M.
0.90 M.
FLOOR LINE CONCRETE MIXTURE

0.05 M.
2" GRAVEL IN BED
NOTE: USE 2" G.I. PIPE SCHED.40
LOCATION: DOWN TO BAGONG LIPUNAN BUILDING
0.20 M.
QTY: 1 UNIT
COLUMN FOOTING DETAIL
SCALE: 1:10 MTS
DEPARTMENT OF EDCATION PROJECT TITLE: PREPARED BY: CHECKED BY: RECOMMENDING APPROVAL: SHEET NO.
DIVISION OF AKLAN
DISTRICT OF BATAN
BAY-ANG MAGPAG-ONG NATIONAL HIGH SCHOOL CONSTRUCTION OF CORRIDOR RAILINGS FREDD SHERWIN N. PANIM
TEACHER 1 / ARCH. DRAFTSMAN
RAMAR B. BALADJAY
HEAD TEACHER 1
1/1
BAY-ANG, BATAN, AKLAN