DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
‘OFFICE OF THE DISTRICT ENGINEER
‘Masbate 3° Distt Engineering Ofice «Annex E-1.
Dinasing, Masa
(CONTRACT TIME EXTENSION NO. 1
(upto 60CD)
Canuat Tine Extension No.1 Isheraby gare fo the project CID No. F013
wen ARKY CONSTRUCTION & SUPPLY equivalent to twenty bx (26) clear doy, coving
{the period from February 2, 2023 to April 20, 2023 (Intermittent, In view ofthe approved
“Mlnthly Suspension Report forthe month Of February f0 Api! 2021 "or Slowdown of Work due
‘0 _umiodable weather condition.
Effecviy of Contract: November 27.2020 ¢
‘Criginal Contract Duration 209 ud. Z
(Original Expiry Date dune 23.2021
‘contract Me ae i
‘DURATION. contnacr | REVISED exPIRY DATE
[EXTENSION NO. 1 po
CHEN ea Wy Bm
‘Cre No.2 — |
t CTE No.3 ~ =
PREPARED 6Y:
susie SSinono
Project Engineer TL
Recommending Approval Apo
-euRBITO REBECCA. ROCES
Chief, Const Section District Engineor
THEREBY acknowledged receipt of this Contvact Time Extension
aes ARKY CONSTRUCTION & SUPPLY.
by fel
‘utorized RepresinaiveSUMMARY OF TIMe SUSPENSION)
As of Apri
i EXTENSILw
uote or rasecr: NETWORK DEVELOPMENT-ROAD WIDENING-SECONDARY ROADS Date Started
BUENAVISTA-KAWAYAN ROAD (CID nO. 20F30013) Orig. Expiry
vocrnos = MASBATE Duration
conmmacrok: ARKY CONST. & SUPPLY/ARIEL LIM
eT WOOF] OME foorowd ONG [rensta]wrmove | nenseo | ONE Joowrmc] ows
Jcamecroenrro wowrvveat| OMS | susreioe0 facsmama|ouarion)exinr| roe lcceacig resumed | roe frewnon Reman
“snaion)
eroaReD By: - 7 : Oven:
ALBERTO B, VALDEHORO. FLORANTRAS ZURBITO RIZAL. vERDIDA REBECCA Y, ROCES
Projet Engiasr (Chit, Cons Seton (¢-sh Opshet Eran District Englneer