Professional Documents
Culture Documents
Pto Ae
Pto Ae
MCRPTO 500kW
PPTO 500kW 0.75 375kW
MCRME 20 000kW
PME 0.75 MCRME PPTO 0.75 20 000kW 375kW 14 719kW
PAE 0.025 MCRME 250kW 750kW
vref 19.89kn The s eed t PME determ ned from the o er curve
EEDI PME CF ME SCFME 0.75 PPTO CF ME SCFME AE 0.75 PPTO CF AE SFCAE ref
23.8 g CO2 / t nm 1
MCRPTO 1 333kW
PPTO 1 333kW 0.75 1 000kW
MCRME 20 000kW
PME 0.75 MCRME PPTO 0.75 20 000 kW 1 000 kW 14 250kW
PAE 0.025 MCRME 250kW 750kW
vref 19.71kn The s eed t PME determ ned from the o er curve
EEDI PME CF ME SCFME 0.75 PPTO CF ME SCFME /DWT v
ref
23.2 g CO2 / t nm 4
6.5.4 One main engine with shaft generator, 0.75 x PPTO PAE, option 1
MCRPTO 2 000kW
0.75 PPTO 0.75 2 000kW 0.75 1 125kW PAE PPTO PAE / 0.75 1 000kW
MCRME 20 000kW
PME 0.75 MCRME PPTO 0.75 20 000 kW 1 000 kW 14 250 kW
PAE 0.025 MCRME 250kW 750kW
vref 19.71kn The s eed t PME determ ned from the o er curve
EEDI PME CF ME SCFME 0.75 PPTO CF ME SCFME ref
23.2 g CO2 / t nm 4
6.5.5 One main engine with shaft generator, 0.75 x PPTO PAE, option 2
MCRPTO 2 000kW
MCRME 20 000kW
PShaft,limit 18 000kW
PME 0.75 PShaft,limit 0.75 18 000kW 13 500kW
22.4 g CO2 / t nm 7
Page 11 of 74