OROPHIL SHIPPING INT’L. CO., INC.
ONLINE TRAINING
WORK SHOP AND CASE STUDY

Name Rank Date


Pulido, Jessie A. Fitter February 16, 2022

Case Study Title: Boiler Burn Out

Identify the title of Procedure in your Company SMS Manual:


Boiler pressure and inspection

Under what IMO Regulation applies: SOLAS II-1/32

Root Cause
1. Leaking for a long time and seawater gets into the boiler

2. Tubes are overheating

3.

Preventive and Corrective Measures (Write as many as you can )


1. Conduct testing

2. Follow proper maintenance

3. Add chemicals compound as needed

4.

5.

6.

7.

8.