Professional Documents
Culture Documents
Reference For Break Down
Reference For Break Down
Bailey Bridge
Calculation
Location Description Material Unit Total Quantity
chat
Bridge abutment Nos 1824
Subtotal kg 2616
16x1cm wood plate
108
Wood Plate
Expansion joint 20x2.4cm wood plate 54
Subtotal 162
M30 Concrete › 23.05
Capping beam
Reinforcement kg 4664.85
Tie beam M30 Concrete jyj3 19.9
Reinforcement kg 2099.5
Pier M30 Concrete a 44.25
Column
Reinforcement kg 8159.45
M30 Concrete Under Water m' 127.3
Pile foundation
Reinforcement kg 5J95.3
Table hat M30 Concrete m3 106.6
Reinforcement kg 13338
M20 Concrete m3 992.0
Abutment Platform body
Reinforcement kg 57536.0
Anti collision post M20 Concrete m' 2.4
Reinforcement kg 342.0
Reinforcement kg 1638.0
Approach slab M30 Concrete 30.4
Cement stabilized broken m’ 30.4
stone layer
Reinforcement kg 3751
Foundation M20 Concrete 387.1
Rock excavation p3 1150
Earth excavation 765
Backfill earthwork 242
Installation cost of Bridge superstructure kg 367205.4
Construction measure cost of temporary support and steel sheet pile LS 1
124.1' 6,704.00
16,760.00 0%
24,976.7t 575,714.20
160.01 746,646.51
20,659.3f 411,121.60
161.9£ 339,912.41
24,693.If 1,092,673.14
158.21 1,290,942.45
16,307.31 2,075,920.80
161.90 265,194.82
20,659.38 628,045.20
3,998.79 121,563.22