1.

            Generation License


2.            Power Purchase Agreement
3.            Grid connection Agreement
4.            Detailed Project Report/Updated Feasibility Study Report (Main Report with Annexes)
              a.              Detail design/Updated feasibility stage Drawings (Both hard copy and Auto-cad files): Civil drawings, Ge
                                Electrical drawings.
              b.              Transmission line and sub-station study report.
              c.               Geotechnical/ Geophysical Investigation report.
              d.              Hydrological Calculations including measured river flow data(by current meter) and discharge measurem
              e.              Hydraulic Calculations.
              f.               Sedimentological Investigations / Report (if conducted).
              g.              Energy Estimates.
              h.              Quantity estimate , Rate Analysis/ Adopted rates and Project cost estimates.
              i.                Financial Analysis including its debt and interest obligation during the project loan period.
5.            EIA report.
6.            Type of contract for Civil, Mechanical and Electro-mechanical works and status report
7.            Developer’s plan for internal control mechanism with respect to bill verification, quality control etc.
8.            Construction material availability and its quality testing report.
9.            Construction methodology to be adopted on the project implementation.
10.          If possible make available the execution team and organization structure of the Client for this project.
Provided
Provided
Included in PPA

Provided

Provided
Provided
Refer DPR
Refer DPR
Provided
Refer PPA
Refer PPA

Provided
Doc File
Doc File
Provided
Refer DPR
Refer DPR