Professional Documents
Culture Documents
Inf Tec de Ejecucion de Mant Quellomocco - Octubre
Inf Tec de Ejecucion de Mant Quellomocco - Octubre
#REF!
PRESUPUESTO AVANCES
SALDO
ITEM DESCRIPCION COSTO DIRECTO ANTERIOR ACTUAL ACUMULADO
S/. Valorizado S/. % Valorizado S/. % Valorizado S/. % Valorizado S/. %
PROGRAMADO 2,336,335.11 1,051,350.80 45.00% 584,083.78 25.00% 1,635,434.58 70.00% 2,160,828.91 92.49%
1 COSTO DIRECTO 2,336,335.11 156,908.15 6.72% 18,598.05 0.80% 175,506.20 7.51% 2,160,828.91 92.49%
COSTO DIRECTO TOTAL 2,336,335.11 156,908.15 6.72% 18,598.05 0.80% 175,506.20 7.51% 2,160,828.91 92.49%
Gastos generales 10.00% 233,633.19 15,690.79 1,859.80 17,550.60 216,082.60
0 0.00% - - - - -
Err:509 Err:509 Err:509 35,000.00 - 35,000.00 Err:509
Err:509 Err:509 Err:509 - - - Err:509
COSTO TOTAL Err:509 207,598.94 Err:509 20,457.85 Err:509 228,056.80 Err:509 Err:509 Err:509
MUNICIPALIDAD PROVINCIAL DE PAUCARTAMBO
GERENCIA DE INFRAESTRUCTURA
PROYECTO:
#REF!
2018
GERENCIA DE INFRAESTRUCTURA
PROYECTO:
#REF!
2018
GERENCIA DE INFRAESTRUCTURA
PROYECTO:
#REF!
2018
MUNICIPALIDAD DISTRITAL DE INKAWASI
SUB GERENCIA DE DESARROLLO SOCIAL Y SERVICIOS PUBLICOS
-
INFORME TÉCNICO DE EJECUCION DE MANTENIMIENTO
2 UNIDAD EJECUTORA
Unidad Ejecutora : MUNICIPALIDAD DISTRITAL DE INKAWASI
3 UBICACIÓN
Region : CUSCO
Provincia : LA CONVENCION
Distrito : INKAWASI
Comunidad : QUELLOMOCCO
JASS : QUELLOMOCCO
RESPONSABLE ATM
Nombre: ODILON CHIPANA QUISPE
Especialidad: Bach. Ing. Ambiental C.I.P.:
DNI: 47765944
RESPONSABLE TECNICO
Nombre: ANTONI ARCOS HUASCO
Especialidad: Bach. Ingeniero civil C.I.P.:
DNI: 70148266
7 MODALIDAD EJECUCIÓN
Modalidad de Ejecució n : ADMINISTRACION DIRECTA
8 FUENTE DE FINANCIAMIENTO
Fuente de Financiamiento: 0083 Operació n y Mantnimiento de Sistemas de Agua Potable
FONCOMUN, CANON Y SOBRECANON
PRESUPUESTO APROBADO
9
PLAN DE
DESCRIPCIÓN MANTENIMIENTO
: PLAN DE MANTENIMIENTO CORRECTIVO DEL SISTEMA DE AGUA DEL SECTOR DE
QUELLOMOCCO, DISTRITO DE INKAWASI, PROVINCIA DE LA CONVENCION –
DEPARTAMENTO DEL CUSCO DEL CUSCO S/. 30,515.69
CAPTACION 4,863.13
LINEA DE CONDUCCION 12,115.49
RESERVORIO 8,069.39
RED DE DISTRIBUCION 219.28
FLETE TERRESTRE -
KIT DE HERRAMIENTAS 2,474.24
10 VALORIZACION FISICA
PRESUPUESTO AVANCES
COSTO DIRECTO SALDO
ITEM DESCRIPCION ANTERIOR ACTUAL ACUMULADO
S/. Valorizado S/. % Valorizado S/. % Valorizado S/. % Valorizado S/. %
1 COSTO DIRECTO 27,741.54 - 0.00% 18,598.05 67.04% 18,598.05 67.04% 9,143.49 32.96%
COSTO DIRECTO TOTAL 27,741.54 - 0.00% 18,598.05 67.04% 18,598.05 67.04% 9,143.49 32.96%
Gastos generales 10.00% 2,774.15 - 0.00% 1,859.80 67.04% 1,859.80 67.04% 914.35 32.96%
COSTO TOTAL 30,515.69 - 0.00% 20,457.85 67.04% 20,457.85 67.04% 10,057.84 32.96%
11 EJECUCIÓN FINANCIERA
PRESUPUESTO DE INVERSIÓN 30,515.69
Ejecució n Directa de Obra 27,741.54
Gastos Generales 2,774.15
Realizar el mantenimiento correctivo del sistema de abastecimiento de agua potable en el centro poblado de Quellomocco, a fin de asegurar agua de calidad para
consumo humano.
LINEA DE CONDUCCION
TUBERIA PVC.- Se reemplazara la tuberia de linea de conducion una longitud de 600 m con tuberia de 1" pvc-C10; CAMARA ROMPE PRESION TIPO 6.- se Demoleran 05 camaras de
rompe presion, debido a que no se encuentran ubicados adecuadamente, asimismo se colocaran Tapas Sanitarias nuevas de 0.64x0.64m de dimesion( 04 unidades), se instalaran con
sus respectivos tubos de limpia y rebose, dados de proteccion, se refaccionara 02 unidades de CRP-T6 reemplazando sus respectivas tapas sanitarias de 0.80x0.82 m de dimension.
RESERVORIO
CERCO DE PROTECCION.- Se instalara 28 metros lineales de cero con rollizo y alambre pua; CAJA DE VALVULAS.- Se construira 01 caja de valvula de dimensiones 1.20x0.90x0.90m,
se reemplazara 03 valvula de 1 1/2" pvc, 01 unidad de valvula de 2 1/2" pvc y se refaccionara la estructura, se cambiara tapa sanitaria de 0.40 x 0.40 m en caja de valvulas, se
reemplazara 01 tapa sanitaria 0.60 x 0.60 m, se instalara 01 escalera metalica de 2.00 m de dimension, se reubicara la tuberia de limpia y rebose 2.5 m de longitud con tuberia de 2
1/2", se colocara el nivel estatico, se colocara 01 dado de proteccion con concreto de 0.012 m3, se colocara 01 grifo de enjuague, se reemplazara la tuberia de ventilacion con tub. de 2
1/2" pulgadas pvc, se colocara 01 canastilla de 1" pvc; SISTEMA DE CLORACION.- Se implementara 01 sistema de cloracion por goteo de doble recipiente.
HERRAMIENTAS.- Se entregara 01 kit de herramientas para la operació n y mantenimiento del sistema de agua.
13 PROGRAMACION DEL PROYECTO
Plazo de Ejecució n (Programado) 45 Dias Calendarios
Plazo de Ejecució n (Modificado) 90 Dias Calendarios
Fecha de Inicio 01/09/2021
Fecha de Término Programado 30/11/2021
Fecha de Paralizacion -
Fecha de Reinicio -
GASTO GASTO
MES SALDO
PROGRAMADO EJECUTADO
ENERO
FEBRERO
MARZO
ABRIL
MAYO
JUNIO
JULIO
AGOSTO
SETIEMBRE
OCTUBRE 165,235.51 27.86% 146,901.89 25.42% 18,333.62
NOVIEMBRE
DICIEMBRE
TOTAL 165,235.51 27.86% 146,901.89 25.42% 18,333.62
MODIFICACIONES DE OBRA
OBRA PRINCIPAL TOTAL GENERAL
AÑO MES MAYORES METRADOS PART. NUEVAS / OBRA COMPLEM. DEDUCTIVOS
PROGRAMADO ACUM PROG EJEC ANTER EJEC DE MES EJEC ACUM MES ANTER EN EL MES ACUMUL MES ANTER EN EL MES ACUMUL MES ANTER EN EL MES ACUMUL MES ANTER EN EL MES ACUMUL
JUNIO #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! - - - #REF! #REF! #REF!
JULIO #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! - - - #REF! #REF! #REF!
AGOSTO #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! - - - #REF! #REF! #REF!
SEPTIEMBRE #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! - - - #REF! #REF! #REF!
OCTUBRE #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! - - - #REF! #REF! #REF!
NOVIEMBRE #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! - - - #REF! #REF! #REF!
DICIEMBRE #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! - - - #REF! #REF! #REF!
MUNICIPALIDAD PROVINCIAL DE PAUCARTAMBO
“AMPLIACION Y MEJORAMIENTO DE LA DEFENSA RIBEREÑA EN LA MARGEN IZQUIERDA DEL RIO MAPACHO SECTORES MIRAFLORES-SAN ISIDRO, DISTRITO DE PAUCARTAMBO, PAUCARTAMBO – CUSCO”.
TOTAL S/. 3,759,194.15 S/. 3,744,196.16 99.60% S/. - 0.00% S/. 0.00 0.00% S/. - 0.00% S/. - 0.00% S/. - 0.00% S/. - 0.00% S/. - #DIV/0!
GASTOS GENERALES 8.22% S/. 308,849.18 S/. 307,616.97 S/. - S/. - S/. - S/. - S/. - S/. - S/. -
GASTOS DE SUPERVISION 2.10% S/. 79,062.13 S/. 78,746.70 S/. - S/. - S/. - S/. - S/. - S/. - S/. -
GASTOS DE LIQUIDACION 1.09% S/. 40,883.15 S/. 16,000.00 S/. - S/. - S/. - S/. - S/. - S/. - S/. -
GASTOS DE EXPEDIENTE TECNICO 2.70% S/. 101,389.55 S/. 100,985.04 S/. - S/. - S/. - S/. - S/. - S/. - S/. -
TOTAL S/. 4,289,378.16 S/. 4,247,544.88 S/. 0.01 S/. 0.01 S/. 0.01 S/. - S/. - S/. - S/. -
1. VALORIZACION DE PARTIDAS N° 01 - MES DE OCTUBRE 2021
OBRA : : PLAN DE MANTENIMIENTO CORRECTIVO DEL SISTEMA DE AGUA DEL SECTOR DE QUELLOMOCCO, DISTRITO DE INKAWASI, RESPONSABLE TECNICO: ANTONI ARCOS HUASCO
PROVINCIA DE LA CONVENCION – DEPARTAMENTO DEL CUSCO DEL CUSCO
SUPERVISOR ODILON CHIPANA QUISPE
FECHA 10/29/2021
AVANCES
PRESUPUESTO SALDO
PARTIDA DESCRIPCIÓN ANTERIOR ACTUAL ACUMULADO
Unid. Metrado P.U Presup. Metrado Valorizacion % Metrado Valorizacion % Metrado Valorizacion % Metrado Valorizacion %
01 CAPTACION 4,863.13
01.01 LECHO FILTRANTE 97.01
01.01.01 PICADO DEL LECHO FILTRANTE M3 0.01 927.74 8.35 0.00 0.00 0.00% 0.01 8.35 100.00% 0.01 8.35 100.00% 0.00 0.00 0%
01.01.02 INSTALACION DE LECHO FILTRANTE UND 2.00 40.80 81.60 0.00 0.00 0.00% 2.00 81.60 100.00% 2.00 81.60 100.00% 0.00 0.00 0%
01.01.03 RESANE DEL LECHO FILTRANTE M3 0.01 379.92 3.42 0.00 0.00 0.00% 0.01 3.42 100.02% 0.01 3.42 100.02% 0.00 0.00 0%
01.01.04 ACABADO Y PULIDO DEL LECHO FILTRANTE M2 0.12 30.36 3.64 0.00 0.00 0.00% 0.12 3.64 99.91% 0.12 3.64 99.91% 0.00 0.00 0%
01.02.02 PLASTICO PARA EVITAR LA FILTRACION DEL C M2 8.80 10.96 96.45 0.00 0.00 0.00% 8.80 96.45 100.00% 8.80 96.45 100.00% 0.00 0.00 0%
01.02.03 VACIADO DE CONCRETO 140 KG/CM2 M3 0.52 493.61 254.88 0.00 0.00 0.00% 0.52 254.88 100.00% 0.52 254.88 100.00% 0.00 0.00 0%
01.02.04 PINTURA ESMALTE EN EXTERIOR M2 3.40 24.81 84.28 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 3.40 84.28 100%
01.03.02 ENCOFRADO DESENCOFRADO M3 0.96 51.97 50.06 0.00 0.00 0.00% 0.96 50.06 99.99% 0.96 50.06 99.99% 0.00 0.00 0%
01.03.03 CONCRETO F`c=140 KG/CM2 M3 0.96 493.61 475.49 0.00 0.00 0.00% 0.96 475.49 100.00% 0.96 475.49 100.00% 0.00 0.00 0%
01.03.04 ACABADO Y PULIDO DE LOS ALEROS M2 6.42 30.36 194.97 0.00 0.00 0.00% 6.42 194.97 100.00% 6.42 194.97 100.00% 0.00 0.00 0%
01.03.05 PINTURA ESMALTE EN EXTERIOR M2 6.42 24.81 159.33 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 6.42 159.33 100%
01.04.02 ENCOFRADO Y DESENCOFRADO M3 0.48 51.97 24.95 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 0.48 24.95 100%
01.04.03 CONCRETO F'c =140 Kg/cm2 M3 0.20 493.61 98.72 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 0.20 98.72 100%
01.04.04 PINTURA ESMALTE EN EXTERIOR M2 8.00 24.81 198.48 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 8.00 198.48 100%
01.05.02 ENCOFRADO DESENCOFRADO M3 0.86 51.97 44.90 0.00 0.00 0.00% 0.86 44.90 100.00% 0.86 44.90 100.00% 0.00 0.00 0%
01.05.03 SOLADO DE CONCRETO F`c=100 KG/CM2 M3 0.09 256.39 23.08 0.00 0.00 0.00% 0.09 23.08 100.02% 0.09 23.08 100.02% 0.00 0.00 0%
01.05.04 FIERRO DOBLADO Y COLOCADO KG 30.00 8.02 240.60 0.00 0.00 0.00% 30.00 240.60 100.00% 30.00 240.60 100.00% 0.00 0.00 0%
01.05.05 CONCRETO F`c=140 KG/CM2 M3 1.19 493.61 587.40 0.00 0.00 0.00% 1.19 587.40 100.00% 1.19 587.40 100.00% 0.00 0.00 0%
01.05.06 TARRAJEO MUROS INTERIORES M2 4.80 31.96 153.41 0.00 0.00 0.00% 4.80 153.41 100.00% 4.80 153.41 100.00% 0.00 0.00 0%
01.05.07 ACABADO Y PULIDO DE EXTERIORES M2 5.76 30.36 174.87 0.00 0.00 0.00% 5.76 174.87 100.00% 5.76 174.87 100.00% 0.00 0.00 0%
01.05.08 PINTURA ESMALTE EN EXTERIOR M2 4.80 24.81 119.09 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 4.80 119.09 100%
01.07.02 SOLADO DE CONCRETO F`c=100 KG/CM2 M3 0.10 256.39 24.36 0.00 0.00 0.00% 0.10 24.36 100.01% 0.10 24.36 100.01% 0.00 0.00 0%
01.07.03 FIERRO DOBLADO Y COLOCADO KG 15.00 8.02 120.30 0.00 0.00 0.00% 15.00 120.30 100.00% 15.00 120.30 100.00% 0.00 0.00 0%
01.07.04 CONCRETO F`c=140 KG/CM2 M3 0.24 493.61 117.48 0.00 0.00 0.00% 0.24 117.48 100.00% 0.24 117.48 100.00% 0.00 0.00 0%
01.07.05 TARRAJEO MUROS INTERIORES M2 1.82 31.96 58.17 0.00 0.00 0.00% 1.82 58.17 100.00% 1.82 58.17 100.00% 0.00 0.00 0%
01.07.06 ACABADO Y PULIDO DE EXTERIORES M2 2.38 30.36 72.26 0.00 0.00 0.00% 2.38 72.26 100.00% 2.38 72.26 100.00% 0.00 0.00 0%
AVANCES
PRESUPUESTO SALDO
PARTIDA DESCRIPCIÓN ANTERIOR ACTUAL ACUMULADO
Unid. Metrado P.U Presup. Metrado Valorizacion % Metrado Valorizacion % Metrado Valorizacion % Metrado Valorizacion %
01.07.07 PINTURA ESMALTE EN EXTERIOR M2 2.38 24.81 59.05 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 2.38 59.05 100%
01.11.02 PINTURA ESMALTE EN EXTERIOR M2 0.20 24.81 4.96 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 0.20 4.96 100%
01.11.03 SUMINISTRO Y CAMBIO DE ACCESORIOS UND 1.00 12.10 12.10 0.00 0.00 0.00% 1.00 12.10 100.00% 1.00 12.10 100.00% 0.00 0.00 0%
01.12.02 CERCO DE ROLLIZO Y ALAMBRE PUA M 11.76 22.79 268.01 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 11.76 268.01 100%
01.12.03 PINTURA ESMALTE EN EXTERIOR M2 0.36 24.81 8.99 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 0.36 8.99 100%
02.02.01.02 SOLADO DE CONCRETO F`c=100 KG/CM2 M3 1.01 256.39 257.67 0.00 0.00 0.00% 1.01 257.67 100.00% 1.01 257.67 100.00% 0.00 0.00 0%
02.02.01.03 ENCOFRADO Y DESENCOFRADO M3 3.80 51.97 197.49 0.00 0.00 0.00% 3.80 197.49 100.00% 3.80 197.49 100.00% 0.00 0.00 0%
02.02.01.04 FIERRO DOBLADO Y COLOCADO KG 120.00 8.02 962.40 0.00 0.00 0.00% 120.00 962.40 100.00% 120.00 962.40 100.00% 0.00 0.00 0%
02.02.01.05 CONCRETO F`c=140 KG/CM2 M3 1.97 493.61 972.41 0.00 0.00 0.00% 1.97 972.41 100.00% 1.97 972.41 100.00% 0.00 0.00 0%
02.02.01.06 TARRAJEO MUROS INTERIORES M2 7.92 31.96 253.12 0.00 0.00 0.00% 7.92 253.12 100.00% 7.92 253.12 100.00% 0.00 0.00 0%
02.02.01.07 ACABADO Y PULIDO DE EXTERIORES M2 9.68 30.36 293.88 0.00 0.00 0.00% 9.68 293.88 100.00% 9.68 293.88 100.00% 0.00 0.00 0%
02.02.01.08 PINTURA ESMALTE EN EXTERIOR M2 9.68 24.81 240.16 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 9.68 240.16 100%
02.02.02.02 TAPA METALICA DE INSPECCION 0.50M X 0.40M UND 3.00 208.83 626.49 0.00 0.00 0.00% 3.00 626.49 100.00% 3.00 626.49 100.00% 0.00 0.00 0%
02.02.04.02 PINTURA ESMALTE EN EXTERIOR M2 1.00 24.81 24.81 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 1.00 24.81 100%
02.02.04.03 SUMINISTRO DE ACCESORIOS UND 1.00 16.74 16.74 0.00 0.00 0.00% 1.00 16.74 100.00% 1.00 16.74 100.00% 0.00 0.00 0%
02.03.01.02 PINTURA ESMALTE EN EXTERIOR M2 2.40 24.81 59.54 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 2.40 59.48 100%
02.03.04.02 PINTURA ESMALTE EN EXTERIOR M2 0.20 24.81 4.96 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 0.20 4.96 100%
02.03.04.03 SUMINISTRO DE ACCESORIOS UND 1.00 12.10 12.10 0.00 0.00 0.00% 1.00 12.10 100.00% 1.00 12.10 100.00% 0.00 0.00 0%
02.04.01.02 PINTURA ESMALTE EN EXTERIOR M2 2.62 24.81 65.00 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 2.62 65.10 100%
02.04.05.02 PINTURA ESMALTE EN EXTERIOR M2 0.20 24.81 4.96 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 0.20 4.96 100%
02.04.05.03 SUMINISTRO DE ACCESORIOS UND 1.00 12.10 12.10 0.00 0.00 0.00% 1.00 12.10 100.00% 1.00 12.10 100.00% 0.00 0.00 0%
03 RESERVORIO 8,069.39
03.01 CERCO DE PROTECCION 656.99
03.01.01 CONCRETO F`c=140 KG/CM2 M3 0.02 493.61 9.87 0.00 0.00 0.00% 0.02 9.87 99.98% 0.02 9.87 99.98% 0.00 0.00 0%
03.01.02 CERCO DE ROLLIZO Y ALAMBRE PUA M 28.00 22.79 638.12 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 28.00 638.12 100%
03.01.03 PINTURA ESMALTE EN EXTERIOR M2 0.36 24.81 8.99 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 0.36 8.99 100%
03.02.02 ENCOFRADO Y DESENCOFRADO M3 0.57 51.97 29.47 0.00 0.00 0.00% 0.57 29.62 100.52% 0.57 29.62 100.52% 0.00 -0.16 -1%
03.02.03 FIERRO DOBLADO Y COLOCADO KG 40.00 8.02 320.80 0.00 0.00 0.00% 40.00 320.80 100.00% 40.00 320.80 100.00% 0.00 0.00 0%
03.02.04 CONCRETO F`c=140 KG/CM2 M3 0.38 493.61 186.58 0.00 0.00 0.00% 0.38 186.58 100.00% 0.38 186.58 100.00% 0.00 0.00 0%
03.02.05 ACABADO Y PULIDO DE EXTERIORES M2 3.78 30.36 114.76 0.00 0.00 0.00% 3.78 114.76 100.00% 3.78 114.76 100.00% 0.00 0.00 0%
03.02.06 PINTURA ESMALTE EN EXTERIOR M2 3.78 24.81 93.78 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 3.78 93.78 100%
03.02.07 SUMINISTRO DE ACCESORIOS GBL 1.00 270.11 270.11 0.00 0.00 0.00% 1.00 270.11 100.00% 1.00 270.11 100.00% 0.00 0.00 0%
03.05.02 PINTURA ESMALTE EN EXTERIOR M2 17.78 24.81 441.01 0.00 0.00 0.00% 17.78 441.01 100.00% 17.78 441.01 100.00% 0.00 0.00 0%
03.10.02 PINTURA ESMALTE EN EXTERIOR M2 0.20 24.81 4.96 0.00 0.00 0.00% 0.20 4.96 99.96% 0.20 4.96 99.96% 0.00 0.00 0%
03.10.03 SUMINISTRO DE ACCESORIOS UND 1.00 12.10 12.10 0.00 0.00 0.00% 1.00 12.10 100.00% 1.00 12.10 100.00% 0.00 0.00 0%
AVANCES
PRESUPUESTO SALDO
PARTIDA DESCRIPCIÓN ANTERIOR ACTUAL ACUMULADO
Unid. Metrado P.U Presup. Metrado Valorizacion % Metrado Valorizacion % Metrado Valorizacion % Metrado Valorizacion %
03.11 TUBERIA DE VENTILACION 35.85
03.11.01 PICADO Y DEMOLICION DE CONCRETO ARMADO M3 0.01 139.16 1.39 0.00 0.00 0.00% 0.01 1.39 99.89% 0.01 1.39 99.89% 0.00 0.00 0%
03.11.02 SUMINISTRO Y CAMBIO DE ACCESORIOS UND 1.00 34.46 34.46 0.00 0.00 0.00% 1.00 34.46 100.00% 1.00 34.46 100.00% 0.00 0.00 0%
04.01.02 ENCOFRADO Y DESENCOFRADO M3 0.08 51.97 4.16 0.00 0.00 0.00% 0.08 4.16 100.06% 0.08 4.16 100.06% 0.00 0.00 0%
04.01.03 CONCRETO F`c=140 KG/CM2 M3 0.08 493.61 39.49 0.00 0.00 0.00% 0.08 39.49 100.00% 0.08 39.49 100.00% 0.00 0.00 0%
04.01.04 TARRAJEO MUROS INTERIORES M2 0.80 31.96 25.57 0.00 0.00 0.00% 0.80 25.57 100.01% 0.80 25.57 100.01% 0.00 0.00 0%
04.01.05 ACABADO Y PULIDO DE EXTERIORES M2 0.64 30.36 19.43 0.00 0.00 0.00% 0.64 19.43 100.00% 0.64 19.43 100.00% 0.00 0.00 0%
04.01.06 PINTURA ESMALTE EN EXTERIOR M2 0.80 24.81 19.85 0.00 0.00 0.00% 0.80 19.85 100.01% 0.80 19.85 100.01% 0.00 0.00 0%
04.01.07 SUMINISTRO DE ACCESORIOS GBL 1.00 98.22 98.22 0.00 0.00 0.00% 1.00 98.22 100.00% 1.00 98.22 100.00% 0.00 0.00 0%
05 HERRAMIENTAS 2,474.24
04.02.01 KIT DE HERRAMIENTAS DE GASFITERIA KIT 1.00 2,474.24 2,474.24 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 1.00 2,474.24 100%
COSTO DIRECTO S/.27,741.54 S/.0.00 0.00% S/.18,598.05 67.04% 18,598.05 67.04% 9,143.49 32.96%
0.14111393 GASTOS GENERALES 10.00% S/.2,774.15 S/.1,859.80 67.04% S/.1,859.80 67.04% S/.914.35 32.96%
TOTAL 30,515.69 0.00 0.00% 20,457.85 67.04% 20,457.85 67.04% 10,057.84 32.96%
FORMATO - 13
SUPERVISOR #REF!
01.02.01.02 TRAZO Y REEPLAMTEO PRELIMINAR KM 1.32 452.65 597.50 0.00 0.00 0.00% 0.96 436.04 72.98% 0.96 436.04 72.98% 0.36 161.46 27.02%
01.02.01.03 CONTROL TOPOOGRAFICO DURANTE LA EJECUCION ML 1323.31 0.85 1,124.81 0.00 0.00 0.00% 6.42 5.46 0.49% 6.42 5.46 0.49% 1316.89 1,119.35 99.51%
01.02.01.04 EXCAVACION MANUAL ZANJA EN MATERIA COMPACTO M3 487.54 10.73 5,231.30 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 487.54 5,231.30 100.00%
01.02.01.05
EXCAVACION MANUAL ZANJA EN ROCA SUELTA: PERFORACION Y VOLADURA
M3 33.37 24.40 814.23 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 33.37 814.23 100.00%
01.02.01.07 LIMPIEZA DE MATERIAL RESULTANTE DE LA VOLADURA M3 68.27 12.90 880.68 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 68.27 880.68 100.00%
01.02.01.08 REFINE Y NIVELACION FONDO ZANJA EN MATERIAL COMPACTO ML 1218.86 0.28 341.28 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 1218.86 341.28 100.00%
01.02.01.09 REFINE Y NIVELACION FONDO ZANJA EN ROCA SUELTA ML 84.34 0.78 65.79 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 84.34 65.79 100.00%
01.02.01.10 REFINE Y NIVELACION FONDO ZANJA EN ROCA FIJA ML 52.21 1.18 61.61 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 52.21 61.61 100.00%
01.02.01.11 CAMA DE APOYO CON TIERRA CERNIDA E=0.01M M3 66.17 6.44 426.13 0.00 0.00 0.00% 0.33 2.15 0.50% 0.33 2.15 0.50% 65.84 423.98 99.50%
01.02.01.12 RELLENO COMPACTO CON MATERIAL SELECCIONADO M3 238.20 11.45 2,727.39 0.00 0.00 0.00% 0.86 9.89 0.36% 0.86 9.89 0.36% 237.34 2,717.50 99.64%
01.02.01.13 RELLENO COMPACTO CON MATERIAL PROPIO M3 486.32 5.81 2,825.52 0.00 0.00 0.00% 0.09 0.52 0.02% 0.09 0.52 0.02% 486.23 2,825.00 99.98%
01.02.01.14 SUMINISTRO E INSTALACION TUB.PVC SAP Q 1.5" C-10 ML 1022.08 7.80 7,972.22 0.00 0.00 0.00% 30.00 234.00 2.94% 30.00 234.00 2.94% 992.08 7,738.22 97.06%
01.02.01.15 SUMINISTRO E INSTALACION TUB.PVC Q 1" C-10 ML 367.40 4.07 1,495.32 0.00 0.00 0.00% 1.19 4.84 0.32% 1.19 4.84 0.32% 366.21 1,490.47 99.68%
01.02.01.15 SUMINISTRO E INSTALACION TUB.PVC Q 1" C-10 ML 367.40 4.07 1,495.32 0.00 0.00 0.00% 1.19 4.84 0.32% 1.19 4.84 0.32% 366.21 1,490.47 99.68%
01.02.01.16 SUMINISTRO E INSTALACION ACCESORIOS P.V.C GLB 1.00 193.98 193.98 0.00 0.00 0.00% 4.80 931.10 480.00% 4.80 931.10 ### -3.80 -737.12 -380.00%
01.02.01.17 PRUEBA HIDRAULICA Y DESIFECCION TUBERIA ML 1323.31 0.45 595.49 0.00 0.00 0.00% 5.76 2.59 0.43% 5.76 2.59 0.43% 1317.55 592.90 99.56%
01.02.02 OBRAS DE ARTE DE CONDUCCION
01.02.02.01 MEJORAMIENTO CAMARAS DE CAPACITACION MANANTE C-01 (03 UNID.)
01.02.02.01.01 LIMPIEZA Y NIVELACION DE TERRENO MANUAL M2 74.82 0.45 33.67 0.00 0.00 0.00% 1.00 0.45 1.34% 1.00 0.45 1.34% 73.82 33.22 98.66%
01.02.02.01.02 TRAZO, NIVELACION Y REEPLANTEO M2 24.38 1.89 46.08 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 24.38 46.08 100.00%
01.02.02.01.03 EXCAVACION MANUAL PARA EXTRUTURAS EN MATERIAL COMPA M3 15.51 13.80 214.04 0.00 0.00 0.00% 0.24 3.28 1.53% 0.24 3.28 1.53% 15.27 210.75 98.47%
01.02.02.01.04 ELIMINACION MANUAL MATERIAL EXC.DM=30M M3 13.89 3.50 48.62 0.00 0.00 0.00% 0.10 0.33 0.68% 0.10 0.33 0.68% 13.80 48.28 99.32%
01.02.02.01.05 ENROCADO PERIMETRAL CON PIEDRA MEDIANA TAM.4"-6" M3 2.30 61.07 140.46 0.00 0.00 0.00% 15.00 916.05 652.17% 15.00 916.05 ### -12.70 -775.59 -552.17%
01.02.02.01.06 FILTRO CON PIEDRA PEQUEÑA TAM.MAX.2" M3 0.38 56.00 21.28 0.00 0.00 0.00% 0.24 13.33 62.64% 0.24 13.33 62.64% 0.14 7.95 37.37%
01.02.02.01.07 FILTRO CON GRAVA SELECCIONADA DE 3/4" -1" M3 0.82 114.50 93.89 0.00 0.00 0.00% 1.82 208.39 221.95% 1.82 208.39 ### -1.00 -114.50 -121.95%
01.02.02.01.08 FILTRO CON GRAVA SELECCIONADA DE 1/2" M3 2.80 56.58 158.42 0.00 0.00 0.00% 2.38 134.66 85.00% 2.38 134.66 85.00% 0.42 23.76 15.00%
01.02.02.01.09 TRARRAJEO E IMPERMEABILIZACION MEZCLA C.A-1:5,E=1.5 CM M2 8.67 23.06 199.93 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 8.67 199.93 100.00%
01.02.02.01.10 PINTURA ESMALTE EN EXTERIORES M2 4.38 7.14 31.27 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 4.38 31.27 100.00%
01.02.02.01.11 INSTALACION TUBERIAS DE INGRESO PVC Q=2"- PERFORADO Und 3.00 59.60 178.80 0.00 0.00 0.00% 1.00 59.60 33.33% 1.00 59.60 33.33% 2.00 119.20 66.67%
01.02.02.01.12 INSTALACION SISTEMA DE SALIDA CON VALVULAS Q 1" Und 1.00 138.31 138.31 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 1.00 138.31 100.00%
01.02.02.01.13 INSTALACION SISTEMA DE SALIDA CON VALVULAS Q=1.50" Und 2.00 138.66 277.32 0.00 0.00 0.00% 1.00 138.66 50.00% 1.00 138.66 50.00% 1.00 138.66 50.00%
01.02.02.01.14 INSTALCION SISTEMA DE LIMPIA Y REBOSE Q=2" Und 3.00 172.78 518.34 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 3.00 518.34 100.00%
01.02.02.01.15 INSTALACION TAPA METALICA DE INSPECCION 0.75x0.75 M Und 3.00 266.25 798.75 0.00 0.00 0.00% 1.00 266.25 33.33% 1.00 266.25 33.33% 2.00 532.50 66.67%
01.02.02.01.16 INSTALACION TAPA METALICA CAJA VALVULAS 0.56x0.40 M Und 3.00 177.50 532.50 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 3.00 532.50 100.00%
01.02.02.01.17. CERCO PERIMETRICO
01.02.02.01.17.01 LIMPIEZA Y NIVELACION DE TERRENO MANUAL M2 270.00 0.45 121.50 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 270.00 121.50 100.00%
01.02.02.01.17.02 TRAZO, NIVELACION Y REEPLAMTEO M2 108.00 1.89 204.12 0.00 0.00 0.00% 1.00 1.89 0.93% 1.00 1.89 0.93% 107.00 202.23 99.07%
01.02.02.01.17.03 EXCAVACION PARA ESTRUCTURAS EN MATERIA COMPACTO M3 6.24 13.80 86.11 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 6.24 86.11 100.00%
01.02.02.01.17.04 CONCRETO F C=175KG/CM° + 30% P.M. (SIN MEZCLADORA) M3 6.05 246.24 1,489.75 0.00 0.00 0.00% 0.02 4.62 0.31% 0.02 4.62 0.31% 6.03 1,485.14 99.69%
01.02.02.01.17.05 SUMINISTRO E INSTALACION DE RODILLOS DE MADERA L=2.1mx4"Und 60.00 14.10 846.00 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 60.00 846.00 100.00%
01.02.02.01.17.06 SUMINISTRO E INSTALACION ALAMBRE DE PUAS PARA CERCO N°ML 1134.00 1.33 1,508.22 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 1134.00 1,508.22 100.00%
01.02.02.01.17.07 INSTALACION DE PUERTA DE INGRSO RUSTICO (0.90x1.55M) Und 3.00 66.87 200.61 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 3.00 200.61 100.00%
01.02.02.02 MEJORAMIENTO DE CAMARA DE REUNION (01 UND)
01.02.02.02.01 TARRAJEO EN INTERIORES Y EXTERIORES MEZCLA C.A-1.5,E=1.5 M2 8.00 20.43 163.44 0.00 0.00 0.00% 600.00 12,258.00 7500.00% 600.00 12,258.00 ### -592.00 -12,094.56 -7400.00%
01.02.02.02.02 TARRAJEO E IMPERMEABILIZACIOM MEZCLA C.A-1.5,E=1.5CM M2 4.20 23.06 96.85 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 4.20 96.85 100.00%
01.02.02.02.03 PINTURA ESMALTE EN EXTERIORES M2 3.19 7.14 22.78 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 3.19 22.78 100.00%
01.02.02.02.04 INSTALACION DE ACCESORIOS DE INGRESO A CAJA DE REUNIONUnd 1.00 198.50 198.50 0.00 0.00 0.00% 0.47 92.90 46.80% 0.47 92.90 46.80% 0.53 105.60 53.20%
01.02.02.02.05 INSTALACION SISTEMA DE SALIDA CON VALVULAS Q=1.50" Und 1.00 138.66 138.66 0.00 0.00 0.00% 1.01 139.35 100.50% 1.01 139.35 ### -0.01 -0.69 -0.50%
01.02.02.02.06 INSTALACION SISTEMA DE LIMPIA Y REBOSE Q=2" Und 1.00 172.78 172.78 0.00 0.00 0.00% 3.80 656.56 380.00% 3.80 656.56 ### -2.80 -483.78 -280.00%
01.02.02.02.07 INSTALACION TAPA METALICA DE INSPECCION 0.75x0.75 M Und 1.00 266.25 266.25 0.00 0.00 0.00% 120.00 31,950.00 12000.00% 120.00 31,950.00 ### -119.00 -31,683.75 ###
01.02.02.02.08 INSTALACION TAPA METALICA CAJA VALVULAS 0.56x0.40 M Und 1.00 177.50 177.50 0.00 0.00 0.00% 1.97 349.68 197.00% 1.97 349.68 ### -0.97 -172.18 -97.00%
01.02.02.03 MEJRAMIENTO CAMARA ROMPE PRESION T-VI (04 UNID) LINEA DE CONDUCTO
01.02.02.03.01 REVOQUES ENLUCIDOS Y MOLDURAS
01.02.02.03.01.01 TARRAJEOS EN INTERIORES Y ESTERIORES MEZCLA C;A 1.5, E=1.M2 15.94 20.43 325.65 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 15.94 325.65 100.00%
01.02.02.03.01.02 TARRAJEO E IMPERMEABILIZACIOM MEZCLA C.A-1.5,E=1.5CM M2 10.56 23.06 243.51 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 10.56 243.51 100.00%
01.02.02.03.02 PINTURA
01.02.02.03.02.01 PINTURA ESMALTE EN EXTERIORES M2 10.92 7.14 77.97 0.00 0.00 0.00% 3.00 21.42 27.47% 3.00 21.42 27.47% 7.92 56.55 72.53%
01.02.02.03.03 VALVULAS Y ACCESORIOS
01.02.02.03.03.01 INSTALACION INGRESO CON VALVULAS DE Q 1.50" Und 4.00 139.97 559.88 0.00 0.00 0.00% 1.00 139.97 25.00% 1.00 139.97 25.00% 3.00 419.91 75.00%
01.02.02.03.03.02 INSTALACION DE SALIDA CON TUBERIA PVC SAP Q 1.50" Und 4.00 81.75 327.00 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 4.00 327.00 100.00%
01.02.02.03.03.03 INSTALACION DE LIMPIA Y REBOSEO Q=2" Und 4.00 172.78 691.12 0.00 0.00 0.00% 0.01 1.73 0.25% 0.01 1.73 0.25% 3.99 689.39 99.75%
01.02.02.03.04 VARIOS
01.02.02.03.04.01 ENROCADO PERIMETRAL CON PIEDRA MEDIANA TAM.4"-6" M3 1.14 61.07 69.62 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.02.04 RESERVORIO RECTANGULAR APOYADO CAP=12.00 M3 (01 UND)
01.02.02.04.01 TRABAJOS PRELIMINARES
01.02.02.04.01.01 LIMPIEZA DEL TERRENO MANUAL M2 38.90 0.45 17.51 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.02.04.01.02 TRAZO DE NIVELACION Y REEMPLANTEO M2 15.70 1.89 29.67 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.02.04.02 MOVIMIENTO DE TIERRAS
01.02.02.04.02.01 EXCAVACION MANUAL ZANJA EN MATERIA COMPACTO M3 13.18 13.80 181.88 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.02.04.02.02 EXAVACION MANUAL PARA ESTRUCTURAS EN ROCAS SUELTAS M3 30.74 47.06 1,446.62 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.02.04.02.03 PERFILADO Y CONPACTADO EN FUNDACIONES M3 37.60 1.72 64.67 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.02.04.02.04 CAMA DE APOYO CON TIERRA CERNIDA E=0.01M M3 0.60 6.44 3.86 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.02.04.02.05 RELLENO COMPACTADO CON MATERIAL SELECCIONADO M3 1.80 11.45 20.61 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.02.04.02.06 RELLENO COMPACTADO CON MATERIAL PROPIO M3 20.44 5.81 118.76 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.02.04.02.07 ELIMINACION MANUAL MATERIAL EXC.DM=30M M3 30.46 3.50 106.61 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.02.04.03 OBRAS DE CONCRETO SIMPLE
01.02.02.04.03.01 CONCRETO F C=100 KG/M2 SOLADO (SIN MEZCLADORA) M3 1.30 212.44 276.17 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.02.04.03.01 CONCRETO FC=175KL/M2 (SIN MEZCLADORA) M3 0.05 341.89 17.09 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.02.04.04 OBRAS DE CONCRETO ARMADO
01.02.02.04.04.01 CONCRETO FC=200KG/M2 (SIN MEZCLADORA) M3 13.19 371.95 4,906.02 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.02.04.04.02 ENCOFRADO Y DESENCOFRADO M2 76.02 20.03 1,522.68 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.02.04.04.03 ACERO FY=4200 KG/M2 KG 943.68 4.71 4,444.73 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.02.04.05 REVOQUES ENLUCIDOS Y MOLDURAS
01.02.02.04.05.01 TARRAJEO EN INTERIORES Y EXTERIORES MEZCLA C.A-1.5,E=1.5 M2 44.57 20.43 910.57 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.02.04.05.02 TARRAJEO E IMPERMEABILIZACIOM MEZCLA C.A-1.5,E=1.5CM M2 28.60 23.06 659.52 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.02.04.05.03 MORTERO 1.5 E=2.5 CM. PARA PENDIENTES DE FONDO M2 7.10 20.45 145.20 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.02.04.06 PINTRA
01.02.02.04.06.01 PINTURA ESMALTE EN EXTERIORES M2 22.50 7.14 160.65 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.02.04.07 VARIOS
01.02.02.04.07.01 INSTALACION INGRESO Y BY PASS CON TUB. PVC SAP Q=1" Und 1.00 270.37 270.37 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.02.04.07.02 INSTALACION SISTEMA DE SALIDA CON VALVULAS Q=1" Und 1.00 193.07 193.07 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.02.04.07.03 INSTALACION DE SISTEMA DE LIMPI Y REBOSE Q=2" Und 1.00 285.86 285.86 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.02.04.07.04 SUMINISTRO E INSTALACION DE ESCALERAS H=1.10 M.E HIPOCL Und 1.00 463.00 463.00 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.02.04.07.05 ENROCADO PERIMETRAL CON PIEDRA MEDIANA TAM.4"-6" M3 2.99 61.07 182.60 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.02.04.08 CERCO PERIMETRICO
01.02.02.04.08.01 LIMPIEZA Y NIVELACION DE TERRENO MANUAL M2 30.00 0.45 13.50 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.02.04.08.02 TRAZO NIVELACION Y REPLANTEO M2 12.00 1.89 22.68 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.02.04.08.03 EXCAVACION PARA ESTRUCTURAS EN MATERIA COMPACTO M3 1.46 13.80 20.15 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.02.04.08.04 CONCRETO F.C=175 KG/CM2 +30 P.M (SIN MEZCLADORA) M3 1.41 246.24 347.20 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.02.04.08.05 SUMINISTRO E INSTALACION DE ROLLIZOS DE MADERA L=2.10Mx4Und 14.00 14.10 197.40 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.02.04.08.06 SUMINISTRO E INSTALACION ALAMBRE DE PUAS PARA CERCO N°ML 252.00 1.33 335.16 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.02.04.08.07 INSTALACION DE PUERTA DE INGRESO RUSTICO (0.90x1.55M) Und 1.00 66.87 66.87 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.03 LINEA DE ADUCCION Y RED DE DISTRIBUCION CON TUBERIA PVC SAP
01.02.03.01 REDES DE DISTRIBUCION AGUA POTABLE
01.02.03.01.01 LIMPIEZA DEL TERRENO MANUAL ML 8688.26 0.22 1,911.42 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.03.01.02 TRAZO Y REPLANTEO PRELIMINAR KM 8.69 452.65 3,933.53 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.03.01.03 CONTROL TOPOGRAFICO DURANTE LA EJECUCION ML 8688.26 0.85 7,385.02 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.03.01.04 EXCAVACION MANUAL ZANJA EN MATERIA COMPACTO M3 3475.30 10.73 37,289.97 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.03.01.05 REFINE Y NIVELACION FONDO ZANJA EN MATRIAL COMPACTO ML 8688.26 0.28 2,432.71 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.03.01.06 CAMA DE APOYO CON TIERRA CERNIDA E=0.01M M3 434.41 6.44 2,797.60 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.03.01.07 RELLENO COMPACTO CON MATERIAL SELECCIONADA M3 1563.89 11.45 17,906.54 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.03.01.08 RELLENO COMPACTO CON MATERIAL PROPIO M3 1251.11 5.81 7,268.95 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.03.01.09 SUMINISTRO E INSTALACION TUB,PVC,SAP Q 3/4" C-10 ML 3397.87 4.23 14,372.99 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.03.01.10 SUMINISTRO E INSTALACION TUB,PVC,SAP Q 3/4" C-15 ML 909.74 8.22 7,478.06 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.03.01.11 SUMINISTRO E INSTALACION TUB,PVC,SAP Q 1" C-10 ML 3867.32 4.07 15,739.99 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.03.01.12 SUMINISTRO R INSTALACION TUB,PVC,SAP Q 1.5" C-10 ML 673.16 7.80 5,250.65 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.03.01.13 SUMINISTRO R INSTALACION TUB,PVC,SAP Q 2" C-10 ML 274.59 8.46 2,323.03 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.03.01.14 SUMINISTRO E INSTALACION DE ACCESORIOS PVC SAP 1"Y 2" (YIGLB 1.00 1138.17 1,138.17 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.03.01.15 PRUEBA HIDRAULICA Y DESIFECCION TUBERIA ML 8688.26 0.45 3,909.72 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.04 OBRA DE ARTE RED DE DISTRIBUCION 0.00
01.02.04.01 CAMARA DE ROMPE PRESIONES Q 2" TIPO -VIP (01 UNID)
01.02.04.01.01 TRABAJOS PRELIMINARES
01.02.04.01.01.01 LIMPIEZA Y NIVELACION DE TERRENO MANUAL M2 11.57 0.45 5.21 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.04.01.01.02 TRAZO DE NIVELACION Y REEMPLANTEO M2 3.39 1.89 6.41 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.04.01.02 MOVIMIENTO DE TIERRAS
01.02.04.01.02.01 ESCAVACION MANUAL PARA ESTRUCTURA EN MATERIAL COMPA M3 8.31 13.80 114.68 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.04.01.02.02 PERFILADO Y CONPACTADO EN FUNDACIONES M2 3.37 1.72 5.80 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.04.01.02.03 CAMA DE APOYO CON TIERRA CERNIDA E=0.01M M3 0.25 6.44 1.61 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.04.01.02.04 RELLENO COMPACTO CON MATERIAL SELECCIONADA M3 0.90 11.45 10.31 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.02.04.02.05 RELLENO COMPACTO CON MATERIAL PROPIO M3 5.10 5.81 29.63 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.04.01.02.06 ELIMINACION MANUAL MATERIAL EXC.DM=30M M3 5.29 3.50 18.52 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.04.01.03 OBRAS DE CONCRETO SIMPLE
01.02.04.01.03.01 CONCRETO F C=100 KG/M2 SOLADO (SIN MEZCLADORA) M3 0.09 212.44 19.12 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.04.01.03.02 CONCRETO FC=175KL/M2 (SIN MEZCLADORA) M3 0.06 341.89 20.51 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.04.01.04 OBRAS DE CONCRETO ARMADO
01.02.04.01.04.01 CONCRETO FC=210KG/CM2 (SIN MEZCLADORA) M3 1.10 371.95 409.15 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.04.01.04.02 ENCOFRADO Y DESENCOFRADO M2 12.45 20.03 249.37 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.04.01.04.03 ACERO FY=4200 KG/CM2 KG 79.04 4.71 372.28 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.04.01.05 REVOQUES ENLUCIDOS Y MOLDURAS
01.02.04.01.05.01 TARRAJEO EN INTERIORES Y EXTERIORES MEZCLA C.A-1.5,E=1.5 M2 5.18 20.43 105.83 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.04.01.05.02 TARRAJEO E IMPERMEABILIZACIOM MEZCLA C.A-1.5,E=1.5CM M2 3.30 23.06 76.10 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.04.01.06 PINTURA
01.02.04.01.06.01 PINTURA ESMALTE EN EXTERIORES M2 3.33 7.14 23.78 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.04.01.07 VALVULAS Y ACCESORIOS
01.02.04.01.07.01 INSTALACION DE INGRESO CON VALVULAS DE Q 2" Y BOYA Und 1 373.37 373.37 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.04.01.07.02 INSTA DE SALIDA CON TUBERIAS PVC SAP Q 2" Und 1 84.5 84.50 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.04.01.07.03 INSTALACION SISTEMA DE LIMPIA Y REBOSE Q=2" Und 1 172.78 172.78 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.04.01.08 VARIOS
01.02.04.01.08.01 ENROCADO PERIMETRAL CON PIEDRA MEDIANA TAM.4"-6" M3 0.37 61.07 22.60 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.04.02 CAMARA DE ROMPE PRESIONES Q 1.50" TIPO -VIP (01 UNID)
01.02.04.02.01 TRABAJOS PRELIMINARES
01.02.04.02.01.01 LIMPIEZA Y NIVELACION DE TERRENO MANUAL M2 11.57 0.45 5.21 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.04.02.01.02 TRAZO NIVELACION Y REPLANTEO M2 3.39 1.89 6.41 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.04.02.02 MOVIMIENTO DE TIERRAS
01.02.04.02.02.01 ESCAVACION MANUAL PARA ESTRUCTURA EN MATERIAL COMPA M3 8.31 13.80 114.68 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.04.02.02.02 PERFILADO Y CONPACTADO EN FUNDACIONES M2 3.37 1.72 5.80 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.04.02.02.03 CAMA DE APOYO CON TIERRA CERNIDA E=0.01M M3 0.25 6.44 1.61 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.04.02.02.04 RELLENO COMPACTO CON MATERIAL SELECCIONADA M3 0.90 11.45 10.31 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.04.02.02.05 RELLENO COMPACTO CON MATERIAL PROPIO M3 5.10 5.81 29.63 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.04.02.02.06 ELIMINACION MANUAL MATERIAL EXC.DM=30M M3 5.29 3.50 18.52 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.04.02.03 OBRAS DE CONCRETO SIMPLE
01.02.04.02.03.01 CONCRETO F C=100 KG/M2 SOLADO (SIN MEZCLADORA) M3 0.09 212.44 19.12 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.04.02.03.02 CONCRETO FC=175KL/M2 (SIN MEZCLADORA) M3 0.06 341.89 20.51 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.04.02.04 OBRAS DE CONCRETO ARMADO
01.02.04.02.04.01 CONCRETO FC=200KL/M2 (SIN MEZCLADORA) M3 1.10 371.95 409.15 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.04.02.04.02 ENCOFRADO Y DESENCOFRADO M2 12.45 20.03 249.37 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.04.02.04.03 ACERO FY=4200 KG/M2 KG 79.04 4.71 372.28 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.04.02.05 REVOQUES ENLUCIDOS Y MOLDURAS
01.02.04.02.05.01 TARRAJEO EN INTERIORES Y EXTERIORES MEZCLA C.A-1.5,E=1.5 M2 5.18 20.43 105.83 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.04.02.05.02 TARRAJEO E IMPERMEABILIZACIOM MEZCLA C.A-1.5,E=1.5CM M2 3.3 23.06 76.10 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.04.02.06 PINTURA
01.02.04.02.06.01 PINTURA ESMALTE EN EXTERIORES M2 3.33 7.14 23.78 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.04.02.07 VALVULAS Y ACCESORIOS
01.02.04.02.07.01 INSTALACION DE INGRESO CON VALVULAS DE Q 2" Y BOYA Und 1.00 290.97 290.97 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.04.02.07.02 INSTA DE SALIDA CON TUBERIAS PVC SAP Q 2" Und 1.00 81.75 81.75 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.04.02.07.03 INSTALACION SISTEMA DE LIMPIA Y REBOSE Q=2" Und 1.00 172.78 172.78 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.04.02.08 VARIOS
01.02.04.02.08.01 ENROCADO PERIMETRAL CON PIEDRA MEDIANA TAM.4"-6" M3 0.37 61.07 22.60 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.04.03 CAMARA ROMPE PRESIONES Q 1" TIPO - VII (11 UNID9
01.02.04.03.01 TRABAJOS PRELIMINARES
01.02.04.03.01.01 LIMPIEZA Y NIVELACION DE TERRENO MANUAL M2 127.27 0.45 57.27 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.04.03.01.02 TRAZO NIVELACION Y REPLANTEO M2 37.29 1.89 70.48 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.04.03.02 MOVIMIENTO DE TIERRAS
01.02.04.03.02.01 EXCAVACION MANUAL PARA ESTRUCTURA EN MATERIAL COMPAC M3 91.42 13.80 1,261.60 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.04.03.02.02 PERFILADO Y CONPACTADO EN FUNDACIONES M2 37.03 1.72 63.69 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.04.03.02.03 CAMA DE APOYO CON TIERRA CERNIDA E=0.01M M3 2.75 6.44 17.71 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.04.03.02.04 RELLENO COMPACTO CON MATERIAL SELECCIONADA M3 9.90 11.45 113.36 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.04.03.02.05 RELLENO COMPACTO CON MATERIAL PROPIO M3 56.09 5.81 325.88 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.04.03.02.06 ELIMINACION MANUAL MATERIAL EXC.DM=30M M3 58.19 3.5 203.67 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.04.03.03 OBRAS DE CONCRETO SIMPLE
01.02.04.03.03.01 CONCRETO F C=100 KG/M2 SOLADO (SIN MEZCLADORA) M3 1.04 212.44 220.94 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.04.03.03.02 CONCRETO FC=175KL/M2 (SIN MEZCLADORA) M3 0.64 341.89 218.81 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.04.03.04 OBRAS DE CONCRETO ARMADO
01.02.04.03.04.01 CONCRETO FC=200KL/M2 (SIN MEZCLADORA) M3 12.08 371.95 4,493.16 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.04.03.04.02 ENCOFRADO Y DESENCOFRADO M2 136.92 20.03 2,742.51 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.04.03.04.03 ACERO FY=4200 KG/M2 KG 869.44 4.71 4,095.06 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.04.03.05 REVOQUES ENLUCIDOS Y MOLDURAS
01.02.04.03.05.01 TARRAJEO EN INTERIORES Y EXTERIORES MEZCLA C.A-1.5,E=1.5 M2 57.02 20.43 1,164.92 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.04.03.05.02 TARRAJEO E IMPERMEABILIZACIOM MEZCLA C.A-1.5,E=1.5CM M2 36.30 23.06 837.08 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.04.03.06 PINTURA
01.02.04.03.06.01 PINTURA ESMALTE EN EXTERIORES M2 36.63 7.14 261.54 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.04.03.07 VALVULAS Y ACCESORIOS
01.02.04.03.07.01 INSTALACION DE INGRESO CON VALVULAS DE Q 2" Y BOYA Und 11.00 267.84 2,946.24 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.04.03.07.02 INSTA DE SALIDA CON TUBERIAS PVC SAP Q 2" Und 11.00 45.76 503.36 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.04.03.07.03 INSTALACION SISTEMA DE LIMPIA Y REBOSE Q=2" Und 11.00 172.78 1,900.58 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.04.03.08 VARIOS
01.02.04.03.08.01 ENROCADO PERIMETRAL CON PIEDRA MEDIANA TAM.4"-6" M3 4.11 61.07 251.00 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.04.04 CAMARA ROMPE PRESIONES Q 1" TIPO - VII (03UNID9
01.02.04.04.01 TRABAJOS PRELIMINARES
01.02.04.04.01.01 LIMPIEZA Y NIVELACION DE TERRENO MANUAL M2 34.71 0.45 15.62 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.04.04.01.02 TRAZO NIVELACION Y REPLANTEO M2 10.17 1.89 19.22 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.04.04.02 MOVIMIENTO DE TIERRAS
01.02.04.04.02.01 EXCAVACION MANUAL PARA ESTRUCTURA EN MATERIAL COMPA M3 24.93 13.80 344.03 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.04.04.02.02 PERFILADO Y CONPACTADO EN FUNDACIONES M2 10.10 1.72 17.37 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.04.04.02.03 CAMA DE APOYO CON TIERRA CERNIDA E=0.01M M3 0.75 6.44 4.83 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.04.04.02.04 RELLENO COMPACTO CON MATERIAL SELECCIONADA M3 2.7 11.45 30.92 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.04.04.02.05 RELLENO COMPACTO CON MATERIAL PROPIO M3 15.3 5.81 88.89 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.04.04.02.06 ELIMINACION MANUAL MATERIAL EXC.DM=30M M3 15.87 3.50 55.55 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.04.04.03 OBRAS DE CONCRETO SIMPLE
01.02.04.04.03.01 CONCRETO F C=100 KG/M2 SOLADO (SIN MEZCLADORA) M3 0.28 212.44 59.48 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.04.04.03.02 CONCRETO FC=175KL/M2 (SIN MEZCLADORA) M3 0.18 341.89 61.54 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.04.04.04 OBRAS DE CONCRETO ARMADO
01.02.04.04.01 CONCRETO FC=200KL/M2 (SIN MEZCLADORA) M3 3.29 371.95 1,223.72 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.04.04.02 ENCOFRADO Y DESENCOFRADO KG 37.34 20.03 747.92 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.04.04.03 ACERO FY=4200 KG/M2 M2 237.12 4.71 1,116.84 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.04.05 REVOQUES ENLUCIDOS Y MOLDURAS
01.02.04.05.01 TARRAJEO EN INTERIORES Y EXTERIORES MEZCLA C.A-1.5,E=1.5 M2 15.55 20.43 317.69 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.04.05.02 TARRAJEO E IMPERMEABILIZACIOM MEZCLA C.A-1.5,E=1.5CM M2 9.90 23.06 228.29 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.04.06 PINTURA
01.02.04.06.01 PINTURA ESMALTE EN EXTERIORES M2 9.99 7.14 71.33 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.04.07 VALVULAS Y ACCESORIOS
01.02..04.07.01 INSTALACION DE INGRESO CON VALVULAS DE Q 2" Y BOYA Und 3.00 237.34 712.02 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.04.07.02 INSTA DE SALIDA CON TUBERIAS PVC SAP Q 2" Und 3.00 51.98 155.94 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.04.07.03 INSTALACION SISTEMA DE LIMPIA Y REBOSE Q=2" Und 3.00 172.78 518.34 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.04.08 VARIOS
01.02.04.08.01 ENCOFRADO PERIMETRAL CON PIEDRA MEDIANA TAM 4"6" M3 1.12 61.07 68.40 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.04.05 VALVULA DE CONTROL DE Q 2" RED DE DISTRIBUCION (01 UNID)
01.02.04.05.01 LIMPIEZA Y NIVELACION DE TERRENO MANUAL M2 5.04 0.45 2.27 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.04.05.02 TRAZO NIVELACION Y REPLANTEO M3 1.36 1.89 2.57 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.04.05.03 EXCAVACION MANUAL PARA ESTRUCTURA EN MATERIAL COMPAC M2 1.01 13.8 13.94 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.04.05.04 PERFILADO Y CONPACTADO EN FUNDACIONES M3 1.10 1.72 1.89 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.04.05.05 CAMA DE APOYO CON TIERRA CERNIDA E=0.01M M3 0.08 6.44 0.52 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.04.05.06 RELLENO COMPACTADO CON MATERIAL SELECCIONADA M3 0.29 11.45 3.32 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.04.05.07 RELLENO COMPACTADO CON MATERIAL PROPIO M3 0.32 5.81 1.86 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.04.05.08 ELIMINACION MANUAL MATERIAL EXC.DM=30M M3 0.83 3.50 2.91 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.04.05.09 CONCRETO FC=175KL/M2 (SIN MEZCLADORA) M3 0.29 341.89 99.15 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.04.05.10 ENCOFRADO Y DESENCOFRADO M3 4.79 20.03 95.94 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.04.05.11 TARRAJEO EN INTERIORES Y EXTERIORES MEZCLA C.A-1.5,E=1.5 M3 1.49 20.43 30.44 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.04.05.12 ACERO FY=4200 KG/M2 KG 5.00 4.71 23.55 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.04.05.13 SUMINISTRO E INSTALACION DE VALVULAS Y ACCESORIO Q 2" ( Und 1.00 168.19 168.19 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.04.06 VALVULA DE CONTROL DE Q 1.50" RED DE DISTRIBUCION (01 UNID)
01.02.04.06.01 LIMPIEZA Y NIVELACION DE TERRENO MANUAL M2 5.04 0.45 2.27 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.04.06.02 TRAZO NIVELACION Y REPLANTEO M2 1.36 1.89 2.57 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.04.06.03 EXCAVACION MANUAL PARA ESTRUCTURA EN MATERIAL COMPAM3 1.01 13.80 13.94 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.04.06.04 PERFILADO Y CONPACTADO EN FUNDACIONES M2 1.10 1.72 1.89 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.04.06.05 CAMA DE APOYO CON TIERRA CERNIDA E=0.01M M3 0.08 6.44 0.52 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.04.06.06 RELLENO COMPACTODO CON MATERIAL SELECCIONADO M3 0.29 11.45 3.32 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.04.06.07 RELLENO COMPACTADO CON MATERIAL PROPIO M3 0.32 5.81 1.86 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.04.06.08 ELIMINACION MANUAL MATERIAL EXC.DM=30M M3 0.83 3.50 2.91 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.04.06.09 CONCRETO FC=175KL/M2 (SIN MEZCLADORA) M3 0.29 341.89 99.15 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.04.06.10 ENCOFRADO Y DESENCOFRADO M2 4.79 20.03 95.94 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.04.06.11 TARRAJEO EN INTERIORES Y EXTERIORES MEZCLA C.A-1.5,E=1.5 M2 1.49 20.43 30.44 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.04.06.12 ACERO FY=4200 KG/M2 KG 5.00 4.71 23.55 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.04.06.13 SUMINISTRO E INSTALACION DE VALVULAS Y ACCESORIO Q 2" ( Und 1.00 87.96 87.96 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.04.07 VALVULA DE CONTROL DE Q 2" RED DE DISTRIBUCION (08 UNID)
01.02.04.07.01 LIMPIEZA Y NIVELACION DE TERRENO MANUAL M2 40.42 0.45 18.19 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.04.07.02 TRAZO NIVELACION Y REPLANTEO M2 10.88 1.89 20.56 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.04.07.03 EXCAVACION MANUAL PARA ESTRUCTURA EN MATERIAL COMPAC M3 8.08 13.8 111.50 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.04.07.04 PERFILADO Y CONPACTADO EN FUNDACIONES M2 8.80 1.72 15.14 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.04.07.05 CAMA DE APOYO CON TIERRA CERNIDA E=0.01M M3 0.64 6.44 4.12 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.04.07.06 RELLENO COMPACTADO CON MATERIAL SELECCIONADA M3 2.30 11.45 26.34 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.04.07.07 RELLENO COMPACTADO CON MATERIAL PROPIO M3 2.56 5.81 14.87 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.04.07.08 ELIMINACION MANUAL MATERIAL EXC.DM=30M M3 6.62 3.50 23.17 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.04.07.09 CONCRETO FC=175KL/M2 (SIN MEZCLADORA) M3 2.32 341.89 793.18 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.04.07.10 ENCOFRADO Y DESENCOFRADO M2 38.28 20.03 766.75 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.04.07.11 TARRAJEO EN INTERIORES Y EXTERIORES MEZCLA C.A-1.5,E=1.5 M2 11.56 20.43 236.17 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.04.07.12 ACERO FY=4200 KG/M2 KG 39.98 4.71 188.31 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.04.07.13 SUMINISTRO E INSTALACION DE VALVULAS Y ACCESORIO Q 2" ( Und 8.00 101.22 809.76 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.04.08 VALVULA DE PURGA Q 1"/ Q 3/4 TIPO II . RED DE DISTRIBUCION (08 UNID)
01.02.04.08.01 LIMPIEZA Y NIVELACION DE TERRENO MANUAL M2 66.24 0.45 29.81 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.04.08.02 TRAZO NIVELACION Y REPLANTEO M2 14.72 1.89 27.82 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.04.08.03 EXCAVACION MANUAL PARA ESTRUCTURAS EN MATERIAL COMP M3 10.37 13.8 143.11 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.04.08.04 PERFILADO Y CONPACTADO EN FUNDACIONES M2 12.00 1.72 20.64 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.04.08.05 CAMA DE APOYO CON TIERRA CERNIDA E=0.01M M3 0.96 6.44 6.18 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.04.08.06 RELLENO COMPACTADO CON MATERIAL SELECCIONADA M3 3.46 11.45 39.62 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.04.08.07 RELLENO COMPACTADO CON MATERIAL PROPIO M3 3.84 5.81 22.31 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.04.08.08 ELIMINACION MANUAL MATERIAL EXC.DM=30M M3 7.84 3.50 27.44 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.04.08.09 CONCRETO F.C=175 KG/CM2 (SIN MEZCLADORA) M3 2.45 341.89 837.63 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.04.08.10 ENCOFRADO Y DESENCOFRADO M2 40.84 20.03 818.03 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.04.08.11 TARRAJEO EN INTERIORES Y EXTERIORES MEZCLA C.A-1.5,E=1.5 M2 11.56 20.43 236.17 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.04.08.12 ACERO FY=4200 KG/M2 KG 39.98 4.71 188.31 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.04.08.13 SUMINISTRO E INSTALACION DE VALVULAS Y ACCESORIO Q 2" (PU Und 8.00 115.66 925.28 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.04.09 CONEXIONES DOMICILIARIAS - LAVADERO DE CONCRETO (72 UNID)
01.02.04.09.01 TRABAJO PRELIMINARES
01.02.04.09.01.01 LIMPIEZA Y NIVELACION DE TERRENO MANUAL M2 910.80 0.45 409.86 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.04.09.01.02 TRAZO NIVELACION Y REPLANTEO M2 463.68 1.89 876.36 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.04.09.01.02 MOVIMIENTO DE TIERRAS
01.02.04.09.01.02.01EXCAVACION MANUAL PARA ESTRUCTURA EN MATERIAL COMPA M2 316.51 13.80 4,367.84 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.04.09.01.02.02PERFILADO Y CONPACTADO EN FUNDACIONES M2 118.08 1.72 203.10 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.04.09.01.02.03CAMA DE APOYO CON TIERRA CERNIDA E=0.01M M3 28.80 6.44 185.47 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.04.09.01.02.04RELLENO COMPACTO CON MATERIAL SELECCIONADA M3 86.40 11.45 989.28 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.04.09.01.02.05RELLENO COMPACTO CON MATERIAL PROPIO M3 86.40 5.81 501.98 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.04.09.01.02.06ELIMINACION MANUAL MATERIAL EXC.DM=30M M3 293.41 3.50 1,026.94 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.04.09.01.03 OBRAS DE CONCRETO SIMPLE
01.02.04.09.01.03.01CONCRETO F C=100 KG/M2 +30P.M (SIN MEZCLADORA) M3 6.8 246.24 1,674.43 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.04.09.01.04 OBRAS DE CONCRETO ARMADO
01.02.04.09.01.04.01CONCRETO FC=200KL/M2 (SIN MEZCLADORA) M3 17.31 371.95 6,438.45 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.04.09.01.04.02ENCOFRADO Y DESENCOFRADO M2 348.35 20.03 6,977.45 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.04.09.01.04.03ACERO FY=4200 KG/M2 KG 2351.76 4.71 11,076.79 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.04.09.01.05 REVOQUES ENLUCIDOS Y MOLDURAS
01.02.04.09.01.05.01TARRAJEO EN EXTERIORES MEZCLA E=1.5 CM. PULIDO CON OCRM2 267.80 30.18 8,082.20 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.04.09.01.06 VARIOS
01.02.04.09.01.06.01ENCOFRADO PERIMETRAL CON PIEDRA MEDIANA TAM 4"6" M3 10.82 61.07 660.78 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.04.09.01.06.02POZO DRENAJE DE AGUAS SERVIDAS (1.0x1.0x20M) UNID 72 79.5 5,724.00 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.04.09.01.07 CAJA VALVULA DE CONTROL
01.02.04.09.01.07.01CONCRETO F.C=210 KG/CM2 (SIN MEZCLADORA) M3 1.94 371.95 721.58 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.04.09.01.07.02CONCRETO F.C=175 KG/CM2 (SIN MEZCLADORA) M3 0.51 341.89 174.36 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.04.09.01.07.03ENCOFRADO Y DESENCOFRADO M2 89.28 20.03 1,788.28 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.04.09.01.07.04ACERO FY=4200 KG/M2 KG 189.97 4.71 894.76 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.04.09.08 INSTALACION SANITARIA
01.02.04.09.08.01 SISTEMA DE AGUA FRIA
01.02.04.09.08.01.01INSTALACION ACCESORIOS SISTEMA DE AGUA FRIA UNID 72.00 135.12 9,728.64 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.04.09.08.02 SISTEMA DE DESAGUE
01.02.04.09.08.02.01INSTALACION ACCESORIOS SISTEMA DE DESGUE Y DRENAJE UNID 72.00 92.68 6,672.96 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.04.09.08.03 CONEXIÓN A RED PUBLICA
01.02.04.09.08.03.01SUNIMISTRO E INSTALACION VALVULAS DE CONTROL DE 3/4" UNID 72.00 129.66 9,335.52 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.05 AMPLIACION Y MEJORAMIENTO SISTEMA DE TRATAMIENTO DE AGUAS SERVIDAS
01.02.05.01 UBS CON LETRINAS DE ARRASTRE HIDRAULICO Y BIODIGESTOR (72 UNID)
01.02.05.01.01 ESTRUCTURA
01.02.05.01.01.01 TRABAJOS PRELIMINARES
01.02.05.01.01.01.01LIMPIEZA Y NIVELACION DE TERRENO MANUAL M2 2856.96 0.45 1,285.63 392.96 176.83 13.75% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.05.01.01.01.02TRAZO NIVELACION Y REPLANTEO M2 1839.42 1.89 3,476.50 263.80 498.57 14.34% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.05.01.01.02 MOVIMIENTO DE TIERRAS
01.02.05.01.01.02.01EXCAVACION MANUAL PARA ESTRUCTURA EN MATERIAL COMPA M3 549.50 13.80 7,583.10 71.24 983.11 12.96% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.05.01.01.02.02PERFILADO Y CONPACTADO EN FUNDACIONES M2 320.40 1.72 551.09 20.74 35.67 6.47% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.05.01.01.02.03RELLENO COMPACTO CON MATERIAL SELECCIONADA M3 232.99 5.81 1,353.67 6.47 37.59 2.78% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.05.01.01.02.04ELIMINACION MANUAL MATERIAL EXC.DM=30M M3 511.70 3.50 1,790.95 14.60 51.10 2.85% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.05.01.01.03 OBRAS DE CONCRETO SIMPLE
01.02.05.01.01.03.01CIMIENTOS CORRIDOS MEZCLA C;H-1.10 +30% PG. M3 136.08 166.05 22,596.08 33.60 5,579.28 24.69% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.05.01.01.03.02SOBRE CIMIENTOS MEZCLA C;H 1.8 +25% P.M M3 21.09 196.96 4,153.89 7.81 1,538.26 37.03% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.05.01.01.03.03FALSO PISO DE 4" CON MEZCLA C;H - 1.8 M2 208.66 28.15 5,873.78 13.80 388.47 6.61% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.05.01.01.03.04CONCRETO F C=175 KG/CM2 (SIN MEZCLADORA) M3 27.25 341.89 9,316.50 27.25 9,316.50 ### Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.05.01.01.03.05ENCOFRADO Y DESENCOFRADO M2 605.16 30.99 18,753.91 104.16 3,227.92 17.21% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.05.01.01.04 OBRAS DE CONCRETO ARMADO
01.02.05.01.01.04.01LAVADERO DE CONCRETO
01.02.05.01.01.04.01CONCRETO F C=210 KG/CM2 (SIN MEZCLADORA) M3 19.77 371.95 7,353.45 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.05.01.01.04.01ENCOFRADO Y DESENCOFRADO M2 343.08 29.65 10,172.32 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.05.01.01.04.01ACERO FY=4200 KG/M2 KG 2749.72 4.71 12,951.18 609.84 2,872.35 22.18% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.05.01.01.04.02COLUMNAS
01.02.05.01.01.04.02CONCRETO F C=210 KG/CM2 (SIN MEZCLADORA) M3 17.69 371.95 6,579.80 7.32 2,722.67 41.38% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.05.01.01.04.02ENCOFRADO Y DESENCOFRADO M2 449.28 39.25 17,634.24 110.51 4,337.52 24.60% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.05.01.01.04.02ACERO FY=4200 KG/M2 KG 3104.67 4.71 14,623.00 ### 6,775.76 46.34% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.05.01.01.04.03VIGAS
01.02.05.01.01.04.03CONCRETO F C=210 KG/CM2 (SIN MEZCLADORA) M3 16.87 371.95 6,274.80 4.78 1,777.92 28.33% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.05.01.01.04.03ENCOFRADO Y DESENCOFRADO M2 240.55 40.15 9,658.08 64.22 2,578.43 26.70% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.05.01.01.04.03ACERO FY=4200 KG/M2 KG 3957.85 4.71 18,641.47 738.90 3,480.22 18.67% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.05.01.01.04.04CAJA VALVULA DE CONTROL
01.02.05.01.01.04.04CONCRETO F C=175 KG/CM2 (SIN MEZCLADORA) M3 1.94 341.89 663.27 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.05.01.01.04.04CONCRETO F C=210 KG/CM2 (SIN MEZCLADORA) M3 0.51 371.95 189.69 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.05.01.01.04.04ENCOFRADO Y DESENCOFRADO M2 89.28 20.03 1,788.28 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.05.01.01.04.04ACERO FY=4200 KG/M2 KG 189.97 4.71 894.76 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.05.01.01.04.05ESTRUCTURA MADERA TECHO
01.02.05.01.01.04.05VIGA DE APOYO DE MADERA 3"x2"x2.10M P2 781.30 9.42 7,359.85 75.95 715.45 9.72% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.05.01.01.04.05CORREAS DE MADERA 2"x2"X3m P2 744.09 6.96 5,178.87 72.32 503.35 9.72% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.05.01.02 ARQUITECTURA
01.02.05.01.02.01 MUROS Y TABIQUE SE ALBAÑERIA
01.02.05.01.02.01.01MUROS DE SOGA CON LADRILLO DE ARCILLA 0..09x0.12x0.24 M M2 863.28 55.22 47,670.32 341.04 18,832.23 39.51% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.05.01.02.02 REVOQUES ENLUCIDOS Y MOLDURAS
01.02.05.01.02.02.01TARRAJEO EN INTERIORES MEZCLA C.A-1.5,E=1.5CM M2 537.84 22.63 12,171.32 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.05.01.02.02.02FROTACHADO Y ACABADOS MUROS CARAVISTAS EXTERIORES M3 812.88 6.26 5,088.63 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.05.01.02.02.03TARRAJEO EN INTERIORES MEZCLA C.A-1.5,E=1.5CM/PULIDO CO M2 475.20 31.31 14,878.51 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.05.01.02.02.04TARRAJEO DE VIGAS Y COLUMNAS MEZCLA C.A-1.5,E=1.5 CM M2 404.28 24.91 10,070.61 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.05.01.02.02.05TARRAJEO EN EXTERIORES MEZCLA C.A-1.5,E=1.5 CM7PULIDO C M2 274.25 30.18 8,276.87 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.05.01.02.03 ZOCALOS
01.02.05.01.02.03.01ZOCALOS DE CEMENTO PULIDO C.A 1.5 H=0.20 M M2 46.08 30.18 1,390.69 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.05.01.02.04 CONTRAZOCALOS
01.02.05.01.02.04.01CONTRA ZOCALOS DE CEMENTO PULIDO C.A 1.5 H=0.20 M M2 82.80 30.18 2,498.90 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.05.01.02.05 PISOS Y PAVIMENTOS
01.02.05.01.02.05.01PISO DE CEMENTO PULIOD Y BRUÑADO E=2" CON OCRE M2 207.36 30.08 6,237.39 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.05.01.02.06 COBERTURA
01.02.05.01.02.06.01COBERTURA CON PLANCHA ENTERNIT DE 1.10x2.44x4M (ONDA 100M2 532.22 45.23 24,072.31 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.05.01.02.07 CARPINTERIA DE MADERA
01.02.05.01.02.07.01PUERTA DE MADERA MACHIHEMBRADA M2 120.96 249.03 30,122.67 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.05.01.02.07.02VENTANA DE MADERA CON MALLA MOSQUITERO M2 19.44 121.32 2,358.46 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.05.01.02.08 CERRAJERIA
01.02.05.01.02.08.01CERRADURA TIPO PEDILLA PARA BAÑOS UNID 72.00 45.00 3,240.00 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.05.01.02.08.02BISAGRA ALUMINIZADA CAPUCHINA DE 4"x4" UNID 216.00 13.28 2,868.48 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.05.01.02.09 PINTURA
01.02.05.01.02.09.01PINTURA AL LATEX MATE INTERIORES 2 MANOS M2 630.72 8.31 5,241.28 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.05.01.02.09.02PINTURA AL LATEX MATE EXTERIORES 2 MANOS M2 1124.28 8.06 9,061.70 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.05.01.02.09.03PINTURA ESMALTE EN ZOCALOS H=0.20M M2 128.88 7.52 969.18 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.05.01.03 INTALACIONES SANITARIAS
01.02.05.01.03.01 SISTEMA DE AGUA FRIA
01.02.05.01.03.01.01EXCAVACIONES MANUAL EN MATERIAL COMPACTO M3 175.23 10.73 1,880.22 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.05.01.03.01.02CAMA DE APOYO CON TIERRA CERNIDA E=0.01M M3 28.80 6.44 185.47 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.05.01.03.01.03RELLENO COMPACTADO CON MATERIAL SELECCIONADA M3 103.68 11.45 1,187.14 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.05.01.03.01.04RELLENO COMPACTADO CON MATERIAL PROPIO M3 69.12 5.81 401.59 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.05.01.03.01.05ELIMINACION MANUAL MATERIAL EXC.DM=30M M3 37.48 3.50 131.18 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.05.01.03.01.06SUMINISTRO E INSTALACION TUB, PVB, SAP, Q 1/2" C-10 ML 2145.60 6.95 14,911.92 258.00 1,793.10 12.02% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.05.01.03.01.07SALIDA DE AGUA FRIA 1/2" PTO 72.00 21.65 1,558.80 29.00 627.85 40.28% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.05.01.03.01.08LLAVE DE PASO Q1/2" UNID 72.00 47.33 3,407.76 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.05.01.03.01.09GRIFO CROMADO DE 1/2" UNID 72.00 29.37 2,114.64 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.05.01.03.01.10SUMINISTRO E INSTALACION ACCESORIOS SISTEMA DE AGUA FRIGLB 72.00 114.70 8,258.40 29.00 3,326.30 40.28% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.05.01.03.01.11SUMINISTRO E INSTALACION ACCESORIOS CAJA DE VALVULA COUNID 72.00 95.92 6,906.24 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.05.01.03.02 SISTEMA DE DESAGUE
01.02.05.01.03.02.01EXCAVACION MANUAL ZANJA EN MATERIAL COMPACTADO ME 219.89 10.73 2,359.42 84.93 911.30 38.62% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.05.01.03.02.02CAMA DE APOYO CON TIERRA CERNIDA E=0.01M M3 40.18 6.44 258.76 20.87 134.40 51.94% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.05.01.03.02.03RELLENO COMPACTADO CON MATERIAL SELECCIONADA M3 144.63 11.45 1,656.01 54.00 618.30 37.34% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.05.01.03.02.04RELLENO COMPACTADO CON MATERIAL PROPIO M3 48.21 5.81 280.10 17.82 103.53 36.96% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.05.01.03.02.05ELIMINACION MANUAL MATERIAL EXC.DM=30M M3 71.02 3.50 248.57 27.44 96.04 38.64% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.05.01.03.02.06TUBERIA PVC DE 2 ML 1166.40 6.75 7,873.20 343.50 2,318.63 29.45% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.05.01.03.02.07TUBERIA PVC DE 4 ML 921.6 10.91 10,054.66 87.60 955.72 9.51% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.05.01.03.02.08SALIDA DE DESAGUE EN PVC SAL 2 PTO 216.00 30.98 6,691.68 129.00 3,996.42 59.72% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.05.01.03.02.09SALIDA DE DESAGUE EN PVC SAL 4 PTO 144.00 58.19 8,379.36 56.00 3,258.64 38.89% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.05.01.03.02.10SALIDA DE VENTILACION EN PVC 2 PTO 72.00 59.22 4,263.84 28.00 1,658.16 38.89% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.05.01.03.02.11SUMIDERO C/TRAMPA PVC SAL 2 UNID 144.00 30.64 4,412.16 56.00 1,715.84 38.89% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.05.01.03.02.12SUMIDERO C/TRAMPA "P" CON REGISTRO UNID 72.00 43.08 3,101.76 28.00 1,206.24 38.89% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.05.01.03.02.13REGISTRO DE BRONCE 4 UNID 72.00 35.06 2,524.32 28.00 981.68 38.89% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.05.01.03.02.14SUMINISTRO E INSTALACION ACCESORIOS SISTEMA DE DESAGU GLB 72.00 204.64 14,734.08 41.75 8,543.72 57.99% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.05.01.03.02.15COLOCACION DE CAJA DE REGISTRO DE 12x24" UNID 72.00 135.2 9,734.40 32.00 4,326.40 44.44% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.05.01.03.03 APARATOS SANITARIOS Y ACCESORIOS
01.02.05.01.03.03.01INODORO BLANCO 6.0 LITROS PZA 72.00 194.99 14,039.28 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.05.01.03.03.02LAVATORIO DE PARED BLANCO 1 LLAVE PZA 72.00 141.81 10,210.32 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.05.01.03.03.03DUCHA CON TERMA ELLETRICA PZA 72.00 149.07 10,733.04 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.05.01.04 INSTALACIONES ELECTRICAS
01.02.05.01.04.O1 SALIDA DE TECHO C/CABLE TW 2.5MM(14)+PVC SEL 19MM(3/4) PTO 72.00 56.06 4,036.32 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.05.01.04.O2 SALIDA DE INTERRUPTOR C7CABLE AWG TW 2.5MM(14)+D PVC SELPTO 72.00 32.61 2,347.92 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.05.01.04.O3 SALIDA PARED PARA TERMA C/CABLE AWG TW 2.5MM(12)+D PVC P STO 72.00 71.02 5,113.44 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.05.01.04.O4 TABLERO DE DISTRIBUCION DE 02 LLAVES UNID 72.00 84.85 6,109.20 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.05.01.04.O5 ACOMETIDA DESDE VIVIENDA PROM=15.0M.(2.1x2.5MM THW) ML 1440.00 2.09 3,009.60 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.05.01.05 BIODIGESTOR
01.02.05.01.05.01 EXCAVACION MANUAL PARA ESTRUCTURA EN MATERIAL COMPA M3 306.00 13.80 4,222.80 67.42 930.40 22.03% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.05.01.05.02 PERFILADO Y CONPACTADO EN FUNDACIONES M2 765.00 1.72 1,315.80 38.35 65.96 5.01% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.05.01.05.03 RELLENO COMPACTADO CON MATERIAL PROPIO M3 217.26 5.81 1,262.28 37.97 220.61 17.48% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.05.01.05.04 ELIMINACION MANUAL MATERIAL EXC.DM=30M M3 117.97 3.50 412.90 33.37 116.80 28.29% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.05.01.05.05 CONCRETO FC=175 KG/CM2 (SIN MEZCLADORA) M3 1.08 341.89 369.24 1.08 369.24 ### Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.05.01.05.06 ACERO FY=4200 KG/M2 KG 254.02 4.71 1,196.43 100.55 473.59 39.58% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.05.01.05.07 BIODIGESTOR DE 600L.T.(INC.ACCESORIOS E INSTALACION) UNID 72.00 2005.32 144,383.04 28.00 56,148.96 38.89% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.05.01.06 CAJA DE REGISTRO LODOS
01.02.05.01.06.01 EXCAVACION MANUAL PARA ESTRUCTURA EN MATERIAL COMPA M3 27.65 13.80 381.57 15.67 216.25 56.67% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.05.01.06.02 CONCRETO FC=175 KG/CM2 (SIN MEZCLADORA) M3 20.28 341.89 6,933.53 5.21 1,781.25 25.69% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.05.01.06.03 ENCOFRADO Y DESENCOFRADO M2 211.68 20.03 4,239.95 87.78 1,758.23 41.47% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.05.01.06.04 TARRAJEO E IMPLEMETACION MEZCLA C.A-1.5,E=1.6 CM M2 106.56 23.06 2,457.27 25.16 580.19 23.61% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.05.01.06.05 INSTALACION TAPA METALICA ESTRADA DE 75x0.75M UNID 72.00 147.00 10,584.00 26.00 3,822.00 36.11% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.05.01.07 POZO PERCOLADOR VOL=1.50 M3
01.02.05.01.07.01 TRABAJOS PRELIMINARES
01.02.05.01.07.01.01LIMPIEZA Y NIVELACION DE TERRENO MANUAL M2 414.72 0.45 186.62 214.29 96.43 51.67% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.05.01.07.01.02TRAZO NIVELACION Y REPLANTEO M2 141.12 1.89 266.72 57.40 108.49 40.68% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.05.01.07.02 MOVIMIENTO DE TIERRAS
01.02.05.01.07.02.01CORTE DE TERRRENO MANUAL P/NIVELACION M3 103.68 13.65 1,415.23 38.88 530.71 37.50% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.05.01.07.02.02ESCAVACION MANUAL PARA ESTRUCTURAS EN MATERIAL COMP M3 313.56 13.80 4,327.13 115.00 1,587.04 36.68% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.05.01.07.02.03PERFILADO Y CONPACTADO EN FUNDACIONES M2 672.48 1.72 1,156.67 101.74 174.99 15.13% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.05.01.07.02.04CAMA DE APOYO CON TIERRA CERNIDA E=0.01M M3 5.40 6.44 34.78 0.75 4.83 13.89% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.05.01.07.02.05RELLENO COMPACTADO CON MATERIAL PROPIO M3 147.79 5.81 858.66 20.50 119.11 13.87% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.05.01.07.02.06ELIMINACION MANUAL MATERIAL EXC.DM=30M M3 352.9 3.5 1,235.15 43.30 151.55 12.27% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.05.01.07.03 OBRAS DE CONCRTO SIMPLE
01.02.05.01.07.03.01CONCRETO FC=175 KG/CM2 +30 P.M (SIN MEZCLADORA) M3 17.01 246.24 4,188.54 6.54 1,610.41 38.45% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.05.01.07.03.02CONCRETO FC=140 KG/CM2 (SIN MEZCLADORA) M3 1.81 307.68 556.90 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.05.01.07.03.03ENCOFRADO Y DESENCOFRADO M2 20.52 26.86 551.17 20.52 551.17 ### Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.05.01.07.04 OBRAS DE CONCRETO ARMADO
01.02.05.01.07.04.01LOSA TECHO
01.02.05.01.07.04.01CONCRETO PC=210 KG/CM2 (SIN MEZCLADORA) M3 13.15 371.95 4,891.14 3.25 1,208.84 24.71% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.05.01.07.04.01ACERO FY=4200 KG/M2 KG 836.56 4.71 3,940.20 275.19 1,296.14 32.90% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.05.01.07.04.01ENCOFRADO Y DESENCOFRADO LOSA M2 163.44 36.94 6,037.47 33.51 1,237.86 20.50% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.05.01.07.04.02TAPA DE CONCRETO
01.02.05.01.07.04.02CONCRETO PC=210 KG/CM2 (SIN MEZCLADORA) M3 5.45 371.95 2,027.13 1.39 515.15 25.41% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.05.01.07.04.02ACERO FY=4200 KG/M2 KG 685.96 4.71 3,230.87 144.69 681.49 21.09% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.05.01.07.04.02ENCOFRADO Y DESENCOFRADO TAPA M2 105.87 26.86 2,843.67 24.05 645.98 22.72% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.05.01.07.05 FILTROS
01.02.05.01.07.05.01MURO CILINDRICO CON LADRILLO CORRIENTE CABEZA Y MORTE M2 276.48 103.18 28,527.21 105.56 10,891.68 38.18% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.05.01.07.05.02GRAVA FILTRANTE CON PIEDRA CHANCADA DE 1/2 M3 44.28 112.88 4,998.33 22.02 2,485.62 49.73% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.05.01.07.05.03GRAVA FILTRANTE CON PIEDRA SELECCIONADA DEL RIO 2" M3 8.64 49.88 430.96 2.54 126.70 29.40% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.05.01.07.06 INSTALACIONES SANITARIAS
01.02.05.01.07.06.01SUMINISTRO Y COLOCACION DE ACCESORIOS Y OTRO (PERCOL UNID 72.00 83.57 6,017.04 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03 SUBSISTEMA DE SANEAMIENTO BASICO-CALLIPATA MEDIA
01.03.01 LINEA DE CONDUCCION CON TUBERIA PVC SAP (L=273.21 ML)
.01.03.01.01 LIMPIEZA Y NIVELACION DE TERRENO MANUAL ML 273.21 0.22 60.11 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
.01.03.01.02 TRAZO NIVELACION Y REPLANTEO KM 0.27 452.66 122.22 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
.01.03.01.03 CONTROL TOPOGRAFICO DURANTE LA EJECUCION ML 273.21 0.85 232.23 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
.01.03.01.04 EXCAVACION MANUAL ZANJA E MATERIAL COMPACTO M3 107.63 10.73 1,154.87 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
.01.03.01.05 EXCAVACION MANUAL ZANJA EN ROCA SUELTA : PERFORACION M3 4.42 24.40 107.85 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
.01.03.01.06 EXCAVACION MANUAL ZANJA EN ROCA FIJA : PERFORACION Y V M3 0.40 34.61 13.84 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
.01.03.01.07 LIMPIEZA DE MATERIAL RESULTANTE DE VOLADURA M3 6.02 12.90 77.66 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
.01.03.01.08 REFINE Y NIVELACION DE FONDO ZANJA EN MATERIAL COMPACTML 269.70 0.28 75.52 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
.01.03.01.09 REFINE Y NIVELACION DE FONDO ZANJA EN ROCA SUELTA ML 11.04 0.78 8.61 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
.01.03.01.10 REFINE Y NIVELACION DE FONDO ZANJA EN ROCA FIJA ML 1 1.18 1.18 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
.01.03.01.11 CAMA DE APOYO CON TIERRA CERNIDA E=0.01M M3 13.66 6.44 87.97 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
.01.03.01.12 RELLENO COMPACTADO CON MATERIAL SELECCIONADA M3 49.18 11.45 563.11 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
.01.03.01.13 RELLENO COMPACTADO CON MATERIAL PROPIO M3 100.4 5.81 583.32 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
.01.03.01.14 SUMINISTRO E INSTALACION TUB, PVC. SAP Q 2" C-10 ML 153.10 8.46 1,295.23 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
.01.03.01.15 SUMINISTRO E INSTALACION TUB, PVC. SAP Q 1" C-10 ML 133.77 4.07 544.44 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
.01.03.01.16 SUMINISTRO E INSTALACION ACCESORIOS P.V.C GLB 1.00 193.98 193.98 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
.01.03.01.17 PRUEVA HIDRAULICA Y DESIFECCION DTUBERIA ML 273.21 0.45 122.94 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.02 OBRAS DE ARTE LINEA DE CONDUCCION
01.03.02 MEJORAMIENTO CAMARAS DE CAPACITACION MANANTE C-01 (02 UNID)
01.03.02.01 LIMPIEZA Y NIVELACION DE TERRENO MANUAL M2 49.88 0.45 22.45 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.02.02 TRAZO NIVELACION Y REPLANTEO M2 16.25 1.89 30.71 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.02.03 EXCAVACION MANUAL PARA ESTRUCTURA EN MATERIAL COMPA M3 10.34 13.80 142.69 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.02.04 ELIMINACION MANUAL MATERIAL EXC.DM=30M M3 9.26 3.50 32.41 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.02.05 ENROCADO PERIMETRAL CON PIEDRA MEDIANA TAM 4"-6" M3 1.53 61.07 93.44 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.02.06 FILTRO CON PIEDRA PEQUEÑA TAM MAX 2" M3 0.25 56.00 14.00 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.02.07 FILTRO CON GRAVA SELECIONADA DE 3/4-1" M3 0.54 114.50 61.83 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.02.08 FILTRO CON GRAVA SELECIONADA DE 1/2 M3 1.86 56.58 105.24 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.02.09 TARRAJEO E IMPLEMETACION MEZCLA C.A-1.5,E=1.5 CM M2 5.78 23.06 133.29 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.02.10 PINTURA ESMALTE EN EXTERIORES M2 2.92 7.14 20.85 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.02.11 INSTALACION TUBERIAS DE INGRESO PVC Q=2" PERFORADO UNID 2.00 59.60 119.20 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.02.12 INSTALACION TUBERIAS DE SALIDA CON VALVULAS Q 1" UNID 2.00 138.31 276.62 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.02.13 INSTALACION TUBERIAS SISTEMA LIMPIA Y REBOSE Q=2" UNID 2.00 172.78 345.56 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.02.14 INSTALACION TAPA METALICA ESTRADA DE 75x0.75M UNID 2.00 266.25 532.50 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.02.15 INSTALACION TAPA METALICA ESTRADA DE 55x0.40M UNID 2.00 177.50 355.00 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.02.16 CERCO PERIMETRICO
01.03.02.16.01 LIMPIEZA Y NIVELACION DE TERRENO MANUAL M2 180.00 0.45 81.00 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.02.16.02 TRAZO NIVELACION Y REPLANTEO M2 72.00 1.89 136.08 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.02.16.03 EXCAVACION PARA ESTRUTUTAS EN MATERIAL COMPACTADO M3 4.16 13.80 57.41 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.02.16.04 CONCRETO FC=175 KG/CM2 +30 P.M (SIN MEZCLADORA) M3 4.03 246.24 992.35 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.02.16.05 SUMINISTRO E INSTALACION DE RODILLOS DE MADERA L=2.10Mx4UNID 40.00 14.10 564.00 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.02.16.06 SUMINISTRO E INSTALACION ALAMBRE DE PUAS PARA CERCO N°ML 756.00 1.33 1,005.48 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.02.16.07 INSTALACION DE PUERTA DE INGRESO RUSTICO (0.90x1.55M) UNID 2.00 66.87 133.74 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.02.02 CAMARA DE REUNION
01.03.02.02.01 LIMPIEZA Y NIVELACION DE TERRENO MANUAL M2 16.00 0.45 7.20 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.02.02.02 EXCAVACION MANUAL PARA ESTRUCTURA EN MATERIAL COMPA M2 7.18 1.89 13.57 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.02.02.03 PERFILADO Y CONPACTADO EN FUNDACIONES M3 3.35 13.80 46.23 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.02.02.04 RELLENO COMPACTADO EN FUNDACIONES M2 4.02 1.72 6.91 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.02.02.05 RELLENO COMPACTADO CON MATERIAL PROPIO M3 0.59 5.81 3.43 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.02.02.06 ELIMINACION MANUAL MATERIAL EXC.DM=30M M3 3.43 3.50 12.01 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.02.02.07 ENROCADO PERIMETRAL CON PIEDRA MEDIANA TAM 4"-6" M3 0.50 61.07 30.54 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.02.02.08 CONCRETO FC=100 KG/CM2 SOLDADO (SIN MEZCLADORA) M3 0.06 212.44 12.75 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.02.02.09 CONCRETO FC=210 KG/CM2 (SIN MEZCLADORA) M3 1.28 371.95 476.10 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.02.02.10 ENCOFRADO Y DESENCOFRADO M2 13.44 20.03 269.20 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.02.02.11 TARRAJEO EN INTERIORES Y EXTERIORES MEZCLA C.A-1.5,E=1.5M2 8.00 20.43 163.44 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.02.02.12 TARRAJEO E IMPERMEABILIZACION MEZCLA C.A-1.5,E=1.5 CM M2 4.20 23.06 96.85 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.02.02.13 ACERO FY=4200 KG/M2 KG 61.09 4.71 287.73 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.02.02.14 PINTURA ESMALTE EN EXTERIORES M2 3.19 7.14 22.78 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.02.02.15 INSTALACIONES DE ACCESORIOS CJA DE REUNION Und 1.00 121.5 121.50 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.02.02.16 INSTALACION SISTEMA DE SALIDA CON VALVULAS 2" Und 1.00 335.57 335.57 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.02.02.17 INSTALACION SISTEMA DE LIMPIA Y REBOSE 2" Und 1.00 172.78 172.78 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.02.02.18 INTALACION TTAPA MECANICA DE INSPECCION 0.75xO.75 M Und 1.00 266.25 266.25 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.02.02.19 INTALACION TTAPA MECANICA CAJA DE VALVULAS 0.55xO.45 M Und 1.00 177.50 177.50 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.02.03 RESERVORIO RECTANGULAR APOYADO CAP=11.00 M3 (01 UNID)
01.03.02.03.01 TRABAJOS PRELIMINARES
01.03.02.03.01.01 LIMPIEZA Y NIVELACION DE TERRENO MANUAL M2 39.80 0.45 17.91 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.02.03.01.02 TRAZO NIVELACION Y REPLANTEO M2 15.70 1.89 29.67 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.02.03.02 MOVIMIENTO DE TIERRAS
01.03.02.03.02.01 EXCAVACION MANUAL PARA ESTRUCTURA EN MATERIAL COMPA M3 13.18 19.32 254.64 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.02.03.02.02 EXCAVACION MANUAL ZANJA EN ROCA SUELTA . PERFORACION M3 30.74 24.40 750.06 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.02.03.02.03 PERFILADO Y CONPACTADO EN FUNDACIONES M2 37.60 1.72 64.67 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.02.03.02.04 CAMA DE APOYO CON TIERRA CERNIDA E=0.01M M3 0.60 6.44 3.86 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.02.03.02.05 RELLENO COMPACTO CON MATERIAL SELECCIONADA M3 1.80 11.45 20.61 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.02.03.02.06 RELLENO COMPACTO CON MATERIAL PROPIO M3 20.44 5.81 118.76 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.02.03.02.07 ELIMINACION MANUAL MATERIAL EXC.DM=30M M3 34.46 3.5 120.61 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.02.03.03 OBRAS DE CONCRETO SIMPLE
01.03.02.03.03.01 CONCRETO F C=100 KG/M2 SOLADO (SIN MEZCLADORA) M3 1.3 212.44 276.17 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.02.03.03.02 CONCRETO FC=175KL/M2 (SIN MEZCLADORA) M3 0.05 341.89 17.09 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.02.03.04 OBRAS DE CONCRETO ARMADO
01.03.02.03.04.01 CONCRETO FC=200KL/M2 (SIN MEZCLADORA) M3 12.93 371.95 4,809.31 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.02.03.04.02 ENCOFRADO Y DESENCOFRADO KG 72.72 20.03 1,456.58 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.02.03.04.03 ACERO FY=4200 KG/M2 M2 923.50 4.71 4,349.69 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.02.03.05 REVOQUES ENLUCIDOS Y MOLDURAS
01.03.02.03.05.01 TARRAJEO EN INTERIORES Y EXTERIORES MEZCLA C.A-1.5,E=1.5 M2 43.01 20.43 878.69 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.02.03.05.02 TARRAJEO E IMPERMEABILIZACIOM MEZCLA C.A-1.5,E=1.5CM M2 27.04 23.06 623.54 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.02.03.05.03 MORTERO 1.5 E=2.5, PARA PENDIIENTES DE FONDO M2 7.1 20.45 145.20 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.02.03.06 PINTURA
01.03.02.03.06.01 PINTURA ESMALTE EN EXTERIORES M2 22.50 7.14 160.65 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.02.03.07 VARIOS
01.03.02.03.07.01 INSTALACION DE INGRESO Y BAY PASS CON TUB PVC Q 2" Und 1.00 449.47 449.47 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.02.03.07.02 INSTALACION SISTEMA DE SALIDA CON VALVULAS 2" Und 1.00 335.57 335.57 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.02.03.07.03 INSTALACION SISTEMA DE LIMPIA Y REBOSE Q=2" Und 1.00 285.86 285.86 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.02.03.07.04 SUMINISTRO E INSTALACION DE ESCALERAS H=1.10 M, E HIPOC GLB 1.00 463 463.00 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.02.03.07.05 ENROCADO PERIMETRAL CON PIEDRA MEDIANA TAM 4"-6" M3 2.99 61.07 182.60 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.02.03.08 CERCO PERIMETRICO
01.03.02.03.08.01 LIMPIEZA DEL TERRENO MANUAL M2 30.00 0.45 13.50 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.02.03.08.02 TRAZO NIVELACION Y REPLANTEO M2 12.00 1.89 22.68 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.02.03.08.03 EXCAVACION MANUAL PARA ESTRUCTURA EN MATERIAL COMPA M3 1.46 19.32 28.21 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.02.03.08.04 CONCRETO FC=175KL/M2 +30%(SIN MEZCLADORA) M3 1.41 246.24 347.20 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.02.03.08.05 SUMINISTRO E INSTALACIONES DE ROLLISOS DE MADERA L=2.10Und 14.00 14.10 197.40 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.02.03.08.06 SUMINISTRO E INSTALACIONES DE ALAMBRE DE PUAS PARA CERC ML 252.00 1.33 335.16 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.02.03.08.07 INTSTLALCION DE PUERTA DE INGRESO RUSTICO (0.90x1.55M) Und 1.00 66.87 66.87 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.03 LINEA DE ADUCCION Y DISTRIBUCION CON TUBERIA PVC SAP
01.03.03.01 RED DE SISTRIBUCION CON TUBERIA PVC SAP (L=2319.11ML)
01.03.03.01.01 LIMPIEZA DEL TERRENO MANUAL ML 2319.11 0.22 510.20 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.03.01.02 TRAZO Y REPLANTEO PRELIMINAR KM 2.32 452.65 1,050.15 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.03.01.03 CONTRO FOTOGRAFICO FURANTE LA EJECUCION ML 2319.11 0.85 1,971.24 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.03.01.04 EXCAVACION MANUAL ZANJA EN MATERIA COMPACTO M3 927.64 10.73 9,953.58 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.03.01.05 REFINE Y NIVELACION FONDO ZANJA EN MATRIAL COMPACTO ML 2319.11 0.28 649.35 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.03.01.06 CAMA DE APOYO CON TIERRA CERNIDA E=0.01M M3 115.96 6.44 746.78 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.03.01.07 RELLENO COMPACTO CON MATERIAL SELECCIONADA M3 417.44 11.45 4,779.69 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.03.01.08 RELLENO COMPACTO CON MATERIAL PROPIO M3 654.34 5.81 3,801.72 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.03.01.09 SUMINISTRO R INSTALACION TUB,PVC,SAP Q 3/4" C-10 ML 930.00 4.23 3,933.90 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.03.01.10 SUMINISTRO R INSTALACION TUB,PVC,SAP Q 1" C-10 ML 1158.31 4.07 4,714.32 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.03.01.11 SUMINISTRO R INSTALACION TUB,PVC,SAP Q 1.5" C-10 ML 40.90 7.8 319.02 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.03.01.12 SUMINISTRO R INSTALACION TUB,PVC,SAP Q 2" C-10 ML 305.87 8.46 2,587.66 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.03.01.13 SUMINISTRO E INSTALACION DE ACCESORIOS PVC SAP 1"Y 2" (YIGLB 1 1138.17 1,138.17 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.03.01.14 PRUEBA HIDRAULICA Y DESIFECCION TUBERIA ML 2319.11 0.45 1,043.60 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.04 OBRAS DE ARTE RED DISTRIBUCION
01.03.04.01 CAMARA ROMPE PRESIONES Q2" TIPO-VII (02 UNID)
01.03.04.01.01 TRABAJOS PRELIMINARES
01.03.04.01.01.01 LIMPIEZA Y NIVELACION DE TERRENO MANUAL M2 23.14 0.45 10.41 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.04.01.01.02 TRAZO NIVELACION Y REPLANTEO M2 6.78 1.89 12.81 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.04..01.02 MOVIMIENTO DE TIERRAS
01.03.04..01.02.01 EXCAVACION MANUAL PARA ESTRUCTURA EN MATERIAL COMPA M3 16.62 13.8 229.36 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.04..01.02.02 PERFILADO Y CONPACTADO EN FUNDACIONES M2 6.73 1.72 11.58 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.04..01.02.03 CAMA DE APOYO CON TIERRA CERNIDA E=0.01M M3 0.50 6.44 3.22 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.04..01.02.04 RELLENO COMPACTO CON MATERIAL SELECCIONADA M3 1.8 11.45 20.61 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.04..01.02.05 RELLENO COMPACTO CON MATERIAL PROPIO M3 10.20 5.81 59.26 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.04..01.02.06 ELIMINACION MANUAL MATERIAL EXC.DM=30M M3 10.58 3.50 37.03 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.04..01.03 OBRAS DE CONCRETO SIMPLE
01.03.04..01.03.01 CONCRETO F C=100 KG/M2 SOLADO (SIN MEZCLADORA) M3 0.19 212.44 40.36 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.04..01.03.02 CONCRETO FC=175KL/M2 (SIN MEZCLADORA) M3 0.12 341.89 41.03 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.04..01.04 OBRAS DE CONCRETO ARMADO
01.03.04..01.04.01 CONCRETO FC=200KL/M2 (SIN MEZCLADORA) M3 2.20 371.95 818.29 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.04..01.04.02 ENCOFRADO Y DESENCOFRADO KG 24.89 20.03 498.55 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.04..01.04.03 ACERO FY=4200 KG/M2 M2 158.08 4.71 744.56 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.04..01.05 REVOQUES ENLUCIDOS Y MOLDURAS
01.03.04..01.05.01 TARRAJEO EN INTERIORES Y EXTERIORES MEZCLA C.A-1.5,E=1.5 M2 10.37 20.43 211.86 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.04..01.05.02 TARRAJEO E IMPERMEABILIZACIOM MEZCLA C.A-1.5,E=1.5CM M2 6.60 23.06 152.20 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.04..01.06 PINTURA
01.03.04..01.06.01 PINTURA ESMALTE EN EXTERIORES M2 6.66 7.14 47.55 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.04..01.07 VALVULAS Y ACCESORIOS
01.03.04..01.07.01 INSTALACION DE INGRESO CON VALVULAS DE Q 2" Y BOYA Und 2.00 373.37 746.74 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.04..01.07.02 INSTA DE SALIDA CON TUBERIAS PVC SAP Q 2" Und 2.00 84.50 169.00 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.04..01.07.03 INSTALACION SISTEMA DE LIMPIA Y REBOSE Q=2" Und 2.00 172.78 345.56 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.04..01.08 VARIOS
01.03.04..01.08.01 ENCOFRADO PERIMETRAL CON PIEDRA MEDIANA TAM 4"6" M3 0.75 61.07 45.80 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.04..02 VALVULA DE CONTROL DE Q 2" RED DE DISTRIBUCION (01 UNID)
01.03.04.02.01 LIMPIEZA Y NIVELACION DE TERRENO MANUAL M2 5.04 0.45 2.27 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.04.02.02 TRAZO NIVELACION Y REPLANTEO M2 1.36 1.89 2.57 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.04.02.03 EXCAVACION MANUAL PARA ESTRUCTURA EN MATERIAL COMPAC M3 1.01 13.8 13.94 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.04.02.04 PERFILADO Y CONPACTADO EN FUNDACIONES M2 1.10 1.72 1.89 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.04.02.05 CAMA DE APOYO CON TIERRA CERNIDA E=0.01M M3 0.08 6.44 0.52 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.04.02.06 RELLENO COMPACTADO CON MATERIAL SELECCIONADA M3 0.29 11.45 3.32 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.04.02.07 RELLENO COMPACTADO CON MATERIAL PROPIO M3 0.32 5.81 1.86 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.04.02.08 ELIMINACION MANUAL MATERIAL EXC.DM=30M M3 0.83 3.50 2.91 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.04.02.09 CONCRETO FC=175KL/M2 (SIN MEZCLADORA) M3 0.29 341.89 99.15 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.04.02.10 ENCOFRADO Y DESENCOFRADO M3 4.79 20.03 95.94 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.04.02.11 TARRAJEO EN INTERIORES Y EXTERIORES MEZCLA C.A-1.5,E=1.5 M3 1.45 20.43 29.62 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.04.02.12 ACERO FY=4200 KG/M2 KG 5.00 4.71 23.55 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.04.02.13 SUMINISTRO E INSTALACION DE VALVULAS Y ACCESORIO Q 2" ( Und 1.00 168.19 168.19 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.04.03 VALVULA DE CONTROL DE Q 1" RED DE DISTRIBUCION (04 UNID)
01.03.04.03.01 LIMPIEZA Y NIVELACION DE TERRENO MANUAL M2 20.16 0.45 9.07 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.04.03.02 TRAZO NIVELACION Y REPLANTEO M2 5.44 1.89 10.28 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.04.03.03 EXCAVACION MANUAL PARA ESTRUCTURA EN MATERIAL COMPAC M3 4.04 13.8 55.75 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.04.03.04 PERFILADO Y CONPACTADO EN FUNDACIONES M2 4.40 1.72 7.57 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.04.03.05 CAMA DE APOYO CON TIERRA CERNIDA E=0.01M M3 0.32 6.44 2.06 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.04.03.06 RELLENO COMPACTADO CON MATERIAL SELECCIONADA M3 1.15 11.45 13.17 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.04.03.07 RELLENO COMPACTADO CON MATERIAL PROPIO M3 1.28 5.81 7.44 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.04.03.08 ELIMINACION MANUAL MATERIAL EXC.DM=30M M3 3.31 3.50 11.59 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.04.03.09 CONCRETO FC=175KL/M2 (SIN MEZCLADORA) M3 1.16 341.89 396.59 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.04.03.10 ENCOFRADO Y DESENCOFRADO M3 19.14 20.03 383.37 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.04.03.11 TARRAJEO EN INTERIORES Y EXTERIORES MEZCLA C.A-1.5,E=1.5 M3 5.78 20.43 118.09 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.04.03.12 ACERO FY=4200 KG/M2 KG 19.99 4.71 94.15 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.04.03.13 SUMINISTRO E INSTALACION DE VALVULAS Y ACCESORIO Q 2" ( Und 4.00 101.22 404.88 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.04.04 VALVULA DE PURGA DE Q 1" @ Q 3/4" TIPO II- RED DE DISTRIBUCION (03UNID)
01.03.04.04.01 LIMPIEZA Y NIVELACION DE TERRENO MANUAL M2 24.84 0.45 11.18 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.04.04.02 TRAZO NIVELACION Y REPLANTEO M2 5.52 1.89 10.43 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.04.04.03 EXCAVACION MANUAL PARA ESTRUCTURA EN MATERIAL COMPAC M3 3.89 13.8 53.68 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.04.04.04 PERFILADO Y CONPACTADO EN FUNDACIONES M2 4.50 1.72 7.74 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.04.04.05 CAMA DE APOYO CON TIERRA CERNIDA E=0.01M M3 0.36 6.44 2.32 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.04.04.06 RELLENO COMPACTADO CON MATERIAL SELECCIONADA M3 1.3 11.45 14.89 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.04.04.07 RELLENO COMPACTADO CON MATERIAL PROPIO M3 1.44 5.81 8.37 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.04.04.08 ELIMINACION MANUAL MATERIAL EXC.DM=30M M3 2.94 3.50 10.29 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.04.04.09 CONCRETO FC=175KL/M2 (SIN MEZCLADORA) M3 0.92 341.89 314.54 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.04.04.10 ENCOFRADO Y DESENCOFRADO M3 15.32 20.03 306.86 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.04.04.11 TARRAJEO EN INTERIORES Y EXTERIORES MEZCLA C.A-1.5,E=1.5 M3 4.34 20.43 88.67 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.04.04.12 ACERO FY=4200 KG/M2 KG 14.99 4.71 70.60 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.04.04.13 SUMINISTRO E INSTALACION DE VALVULAS Y ACCESORIO Q 1"/ Q3/Und 3.00 115.66 346.98 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.04..05 CONEXIONES DOMICILIARIAS -LAVADEROS DE CONCRETO (62 UNID)
01.03.04..05.01 TRABAJOS PRELIMINARES
01.03.04..05.01.01 LIMPIEZA Y NIVELACION DE TERRENO MANUAL M2 784.30 0.45 352.94 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.04..05.01.02 TRAZO NIVELACION Y REPLANTEO M2 399.28 1.89 754.64 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.04.05.02 MOVIMIENTO DE TIERRAS
01.03.04.05.02.01 EXCAVACION MANUAL PARA ESTRUCTURA EN MATERIAL COMPA M3 272.55 13.8 3,761.19 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.04.05.02.02 PERFILADO Y CONPACTADO EN FUNDACIONES M2 101.68 1.72 174.89 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.04.05.02.03 CAMA DE APOYO CON TIERRA CERNIDA E=0.01M M3 24.80 6.44 159.71 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.04.05.02.04 RELLENO COMPACTO CON MATERIAL SELECCIONADA M3 74.4 11.45 851.88 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.04.05.02.05 RELLENO COMPACTO CON MATERIAL PROPIO M3 74.4 5.81 432.26 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.04.05.02.06 ELIMINACION MANUAL MATERIAL EXC.DM=30M M3 252.66 3.50 884.31 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.04.05.03 OBRAS DE CONCRETO SIMPLE
01.03.04.05.03.01 CONCRETO F C=100 KG/M2 SOLADO (SIN MEZCLADORA) M3 5.86 246.24 1,442.97 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.04.05.04 OBRAS DE CONCRETO ARMADO Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.04.05.04.01 CONCRETO FC=200KL/M2 (SIN MEZCLADORA) M3 14.90 371.95 5,542.06 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.04.05.04.02 ENCOFRADO Y DESENCOFRADO M2 299.97 20.03 6,008.40 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.04.05.04.03 ACERO FY=4200 KG/M2 KG 2025.13 4.71 9,538.36 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.04.05.05 REVOQUES ENLUCIDOS Y MOLDURAS
01.03.04.05.05.01 TARRAJEO EN INTERIORES Y EXTERIORES MEZCLA C.A-1.5,E=1.5 M2 230.69 30.18 6,962.22 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.04.05.06 VARIOS
01.03.04.05.06.01 ENCOFRADO PERIMETRAL CON PIEDRA MEDIANA TAM 4"6" M3 9.32 61.07 569.17 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.04.05.06.02 POZO DE DRNAJE DE AGUA SERVDAS 1.0x1.0x1.20 M Und 62.00 79.50 4,929.00 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.04.05.07 CAJA DE VALVULA DE CONTROL
01.03.04.05.07.01 CONCRETO FC=175KL/M2 (SIN MEZCLADORA) M3 1.67 341.89 570.96 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.04.05.07.02 CONCRETO FC=210KL/M2 (SIN MEZCLADORA) M3 0.44 371.95 163.66 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.04.05.07.03 ENCOFRADO Y DESENCOFRADO M2 76.88 20.03 1,539.91 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.04.05.07.04 ACERO FY=4200 KG/M2 KG 163.58 4.71 770.46 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.04.05.08 INSTALACIONES SANITARIAS
01.03.04.05.08.01 SISTEMA DE AGUA FRIA
01.03.04.05.08.01.01INSTALACION ACCESORIOS SISTEMA DE AGUA FRIA Und 62.00 135.12 8,377.44 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.04.05.08.02 SISTEMA DE DESAGUE
01.03.04.05.08.02.01INSTALACION ACCESORIOS SISTEMA DE DESAGUE Y DRENAJE Und 62.00 92.68 5,746.16 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.04.05.08.03 CONEXIÓN A RED PUBLICA
01.03.04.05.08.03.01SUMINISTRO E INSTALACION VALVULA DE CONTROL DE 3/4 Und 62.00 129.66 8,038.92 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05 AMPLIACION DE MEJORAMIENTO SISTEMA DE TRATAMIENTO DE AGUAS SERVIDAS
01.03.05.01 RED COLECTOR Y EMISOR DE DESAGUE (1588.24 ML)
01.03.05.01.01 TRAZO Y REPLANTEO PRELIMINAR KM 1.59 452.65 719.71 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.01.02 CONTROL TOPOGRAFICO DURANTE LA EJECUCION ML 1588.24 0.85 1,350.00 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.01.03 EXCAVACION ZANJA EN MATERIAL NO CALIFICADO C/MAQUINARI M3 1334.12 12.12 16,169.53 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.01.04 REFINE Y NIVELACION FONDO ZANJA EN MATERIAL COMPACTAD ML 952.94 0.28 266.82 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.01.05 CAMA DE APOYO CON TIERRA CERNIDA H=0.15M M3 142.94 12.15 1,736.72 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.01.06 RELLENO COMPACTADO CON MATERIAL SELECCIONADA M3 285.88 11.45 3,273.33 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.01.07 RELLENO COMPACTADO CON MATERIAL PROPIO M3 905.30 5.81 5,259.79 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.01.08 SUMINISTRO Y COLOCACION DE TUB PVC SAL 6" ISO 4435 ML 1362.21 37.77 51,450.67 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.01.09 SUMINISTRO Y COLOCACION DE TUB PVC SAL 6" ISO 4435 ML 305.44 41.97 12,819.32 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.01.10 PRUEBA HIDRAULICA RED DE TUBERIA 5"A 8" M 1588.24 0.79 1,254.71 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.02 BUSONES DE CONCRETO T-I (H=1.20)- RED COLECTOR Y EMISOR (02 UNID)
01.03.05.02.01 TRAZO NIVELACION Y REPLANTEO M2 3.90 1.89 7.37 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.02.02 EXCAVACION MANUAL PARA ESTRUCTURAS EN MATERIAL COMP M3 5.13 13.80 70.79 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.02.03 REFILADO Y COMPACTADO EN FUNDACIONES M2 13.92 1.72 23.94 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.02.04 RELLENO COMPACTADO CON MATERIAL PROPIO M3 0.80 5.81 4.65 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.02.05 ELIMINACION MANUAL MATERIAL EXC.DM=30M M3 5.36 3.50 18.76 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.02.06 CONCRETO FC=100KL/M2 SOLDADO (SIN MEZCLADORA) M3 0.42 212.44 89.22 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.02.07 CONCRETO FC=175KL/M2 (SIN MEZCLADORA) M3 1.95 341.89 666.69 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.02.08 CONCRETO FC=2100KL/M2 (SIN MEZCLADORA) M3 0.73 371.95 271.52 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.02.09 ENCOFRADO Y DESENCOFRADO DE BUZON M2 16.62 43.67 725.80 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.02.10 ENLUCIDOS DE INTERIORES E=1/2, MEZCLA 1.5- MEDIA CAÑA M2 9.10 15.42 140.32 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.02.11 ACERO FY=4200 KG/M2 KG 55.81 4.71 262.87 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.02.12 SUMINISTRO Y COLOCACION DE TUB PVC SAL 6" ISO 4435 ML 4.2 37.77 158.63 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.02.13 SUMINISTRO Y COLOCACION TAPA DE F°F° CHARNELA Und 2.00 336.75 673.50 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.03 BUZONES DE CONCRETO T_II Y III (H=1.20) RED COLECTOR Y EMISOR (39 UNID)
01.03.05.03.01 TRAZO NIVELACION Y REPLANTEO M2 83.07 1.89 157.00 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.03.02 EXCAVACION MANUAL PARA ESTRUCTURAS EN MATERIAL COMP M3 100.09 13.80 1,381.24 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.03.03 REFILADO Y COMPACTADO EN FUNDACIONES M2 271.52 1.72 467.01 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.03.04 RELLENO COMPACTADO CON MATERIAL PROPIO M3 15.60 5.81 90.64 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.03.05 ELIMINACION MANUAL MATERIAL EXC.DM=30M M3 104.51 3.50 365.79 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.03.06 CONCRETO FC=100KL/M2 SOLDADO (SIN MEZCLADORA) M3 12.24 212.44 2,600.27 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.03.07 CONCRETO FC=175KL/M2 (SIN MEZCLADORA) M3 38.05 341.89 13,008.91 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.03.08 CONCRETO FC=2100KL/M2 (SIN MEZCLADORA) M3 14.2 371.95 5,281.69 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.03.09 ENCOFRADO Y DESENCOFRADO DE BUZON M2 345.07 43.67 15,069.21 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.03.10 ENLUCIDOS DE INTERIORES E=1/2, MEZCLA 1.5- MEDIA CAÑA M2 177.53 15.42 2,737.51 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.03.11 ACERO FY=4200 KG/M2 KG 1088.39 4.71 5,126.32 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.03.12 SUMINISTRO Y COLOCACION DE TUB PVC SAL 6" ISO 4435 ML 163.8 37.77 6,186.73 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.03.13 SUMINISTRO Y COLOCACION TAPA DE F°F° CHARNELA Und 39.00 336.75 13,133.25 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.04 BUSONES DE CONCRETO T-IV (H=1.60)- RED COLECTOR Y EMISOR (01 UNID)
01.03.05.04.01 TRAZO NIVELACION Y REPLANTEO M2 2.04 1.89 3.86 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.04.02 EXCAVACION MANUAL PARA ESTRUCTURAS EN MATERIAL COMP M3 3.27 13.80 45.13 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.04.03 REFILADO Y COMPACTADO EN FUNDACIONES M2 1.77 1.72 3.04 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.04.04 RELLENO COMPACTADO CON MATERIAL PROPIO M3 0.4 5.81 2.32 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.04.05 ELIMINACION MANUAL MATERIAL EXC.DM=30M M3 3.53 3.50 12.36 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.04.06 CONCRETO FC=100KL/M2 SOLDADO (SIN MEZCLADORA) M3 0.26 212.44 55.23 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.04.07 CONCRETO FC=175KL/M2 (SIN MEZCLADORA) M3 1.24 341.89 423.94 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.04.08 CONCRETO FC=2100KL/M2 (SIN MEZCLADORA) M3 0.36 371.95 133.90 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.04.09 ENCOFRADO Y DESENCOFRADO DE BUZON M2 10.09 43.67 440.63 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.04.10 ENLUCIDOS DE INTERIORES E=1/2, MEZCLA 1.5- MEDIA CAÑA M2 6.06 15.42 93.45 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.04.11 ACERO FY=4200 KG/M2 KG 87.26 4.71 410.99 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.04.12 SUMINISTRO Y COLOCACION DE TUB PVC SAL 6" ISO 4435 ML 3.15 37.77 118.98 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.04.13 SUMINISTRO Y COLOCACION TAPA DE F°F° CHARNELA Und 1.00 336.75 336.75 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.05 CONEXIONES DOMICILIARIAS DESAGUE (58 UND)
01.03.05.05.01 TRAZO Y REPLANTEO PRELIMINAR M2 158.78 1.89 300.09 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.05.02 CONTROL TOPOGRAFICO DURANTE LA EJECUCION M3 125.06 13.80 1,725.83 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.05.03 EXCAVACION ZANJA EN MATERIAL NO CALIFICADO C/MAQUINARI M2 158.78 1.72 273.10 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.05.04 REFINE Y NIVELACION FONDO ZANJA EN MATERIAL COMPACTAD M3 13.92 6.44 89.64 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.05.05 CAMA DE APOYO CON TIERRA CERNIDA H=0.15M M3 50.11 11.45 573.76 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.05.06 RELLENO COMPACTADO CON MATERIAL SELECCIONADA M3 66.82 5.81 388.22 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.05.07 ELIMINACION MANUAL MATERIAL EXC.DM=30M M3 33.15 3.5 116.03 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.05.08 CONCRETO FC=175KL/M2 (SIN MEZCLADORA) M2 8.95 341.89 3,059.92 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.05.09 ENCOFRADO Y DESENCOFRADO ML 160.08 20.03 3,206.40 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.05.10 TUBERIA PVC NTP-ISO 4435 S-25 DN 110 MM Und 609.00 32.19 19,603.71 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.05.11 SUMINISTRO E INSTALACION ACCESORIOS PVC SAL Y TAPA F°F° 58.00 257.56 14,938.48 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.06 SISTEMA LOCAL DE TRATAMIENTO DE AGUAS SERVIDAS
01.03.05.06.01 CAMARA DE REJAS (01 UNID)
01.03.05.06.01.01 LIMPIEZA Y NIVELACION DE TERRENO MANUAL M2 27.90 0.45 12.56 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.06.01.02 TRAZO NIVELACION Y REPLANTEO M2 8.36 3.7 30.93 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.06.01.03 EXCAVACION MANUAL PARA ESTRUCTURAS EN MATERIAL COMP M3 12.26 16.1 197.39 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.06.01.04 REFILADO FINAL DE TERRENO POSTERIOR DE CORTE M2 8.45 0.48 4.06 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.06.01.05 CAMA DE APOYO CON TIERRA CERNIDA H=0.15M M3 0.64 16.71 10.69 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.06.01.06 RELLENO COMPACTADO CON MATERIAL PROPIO M2 2.29 30.25 69.27 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.06.01.07 RELLENO COMPACTADO CON MATERIAL PROPIO M3 3.10 9.08 28.15 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.06.01.08 ELIMINACION MANUAL MATERIAL EXC.DM=30M M3 9.32 4.95 46.13 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.06.01.09 CONCRETO SIMPLE FC=100KL/M2 SOLDADO M3 0.07 214.10 14.99 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.06.01.10 CONCRETO FC=210KL/M2 (SIN MEZCLADORA) M3 0.75 371.95 278.96 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.06.01.11 ENCOFRADO Y DESENCOFRADO DE BUZON M3 7.24 20.03 145.02 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.06.01.12 TARRAJERO , IMPERMEABILIZACION Y ACABADOS M3 4.41 20.17 88.95 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.06.01.13 ACERO FY=4200 KG/M2 KG 49.88 4.71 234.93 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.06.01.14 SUMINISTRO Y COLOCACION DE REJILLAS CON FIERRO LISO D=1/ML 6.30 13.43 84.61 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.06.01.15 COLOCACION DE PARRILLA DE PROTECCION DE PLATINA (0.98x0.Und 1.00 636.69 636.69 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.06.01.16 SUMINISTRO Y COLOCACION DE TUB PVC SAL 6" ISO 4435 ML 11.34 41.97 475.94 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.06.01.17 SUMINISTRO Y COLOCACION DE ACCESORIOS Y OTROS (CAMARA Und 1.00 23.80 23.80 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.06.02 CAJA DE INSPECCION -REGISTRO (05 UNID)
01.03.05.06.02.01 LIMPIEZA Y NIVELACION DE TERRENO MANUAL M2 73.95 0.45 33.28 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.06.02.02 TRAZO NIVELACION Y REPLANTEO M2 17.45 3.70 64.57 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.06.02.03 EXCAVACION PARA ESTRUCTURAS EN MATERIAL SUELTO M3 20.62 16.10 331.98 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.06.02.04 PERFILADO FINAL DE TERRENO POSTERIOR AL CORTE M2 17.45 0.48 8.38 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.06.02.05 CAMA DE APOYO CON TIERRA CERNIDA H=0.10M M3 1.50 16.71 25.07 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.06.02.06 RELLENO COMPACTADO C/EQUIPO MATERIAL ZARANDEADO M3 5.40 30.25 163.35 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.06.02.07 RELLENO COMPACTADO A MANO- MATERIAL PROPIO M3 5.37 9.08 48.76 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.06.02.08 ELIMINACION MANUAL MATERIAL EXC.DM=30M M3 13.97 4.95 69.15 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.06.02.09 CONCRETO SIMPLE FC=100 KG/CM2, SOLDADO M3 0.13 214.1 27.83 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.06.02.10 CONCRETO FC=210 KG/CM2 (SIN MEZCLADORA) M3 1.27 371.95 472.38 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.06.02.11 ENCOFRADO Y DESENCOFRADO DE MUROS- LOSA M2 21.40 36.40 778.96 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.06.02.12 TARRAJERO , IMPERMEABILIZACION Y ACABADOS M2 6.00 20.17 121.02 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.06.02.13 ACERO FY=4200 KG/M2 KG 26.24 4.70 123.33 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.06.02.14 TUBERIA PVC NTP-ISO 4435 S-25 DN 110 MM ML 15.75 32.19 506.99 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.06.02.15 SUMINISTRO Y COLOCACION DE TUB PVC SAL 6" ISO 4435 ML 10.50 37.77 396.59 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.06.02.16 SUMINISTRO Y COLOCACION DE ACCESORIOS Y OTROS D=4" Und 3.00 6.69 20.07 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.06.02.17 SUMINISTRO Y COLOCACION DE ACCESORIOS Y OTROS D=6" Und 2.00 10.71 21.42 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.06.03 DISTRIBUIDOR DE CAUDALES (3 UND)
01.03.05.06.03.01 LIMPIEZA Y NIVELACION DE TERRENO MANUAL M2 71.55 0.45 32.20 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.06.03.02 TRAZO, NIVELES Y REPLANTEO PRELIMINAR COM VALLAS AISLADM2 21.13 3.70 78.18 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.06.03.03 EXCAVACION PARA ESTRUCTURAS EN MATERIAL SUELTO M3 28.31 16.10 455.79 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.06.03.04 PERFILADO FINAL DE TERRENO POSTERIOR AL CORTE M2 22 0.48 10.56 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.06.03.05 CAMA DE APOYO CON MATERIAL ZARANDEADO H=10CM M3 1.19 16.71 19.88 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.06.03.06 RELLENO COMPACTADO C/EQUIPO MATERIAL ZARANDEADO M3 4.28 30.25 129.47 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.06.03.07 RELLENO COMPACTADO A MANO- MATERIAL PROPIO M3 4.72 9.08 42.86 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.06.03.08 ELIMINACION MANUAL MATERIAL EXC.DM=30M M3 24.97 4.95 123.60 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.06.03.09 CONCRETO SIMPLE FC=100 KG/CM2, SOLDADO M3 0.16 214.10 34.26 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.06.03.10 CONCRETO FC=210 KG/CM2 (SIN MEZCLADORA) M3 1.69 371.95 628.60 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.06.03.11 ENCOFRADO Y DESENCOFRADO MUROS-LOSA M2 21.87 36.40 796.07 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.06.03.12 TARRAJERO , IMPERMEABILIZACION Y ACABADOS M2 9.97 20.17 201.09 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.06.03.13 ACERO FY=4200 KG/M2 KG 73.7 4.70 346.39 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.06.03.14 TUBERIA PVC NTP-ISO 4435 S-25 DN 110 MM ML 20.79 32.19 669.23 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.06.03.15 SUMINISTRO Y COLOCACION DE TUB PVC SAL 6" ISO 4435 ML 20.79 37.77 785.24 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.06.03.16 SUMINISTRO Y COLOCACION DE ACCESORIOS Y OTROS D=4" Und 2.00 6.69 13.38 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.06.03.17 SUMINISTRO Y COLOCACION DE ACCESORIOS Y OTROS D=6" Und 1.00 10.71 10.71 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.06.04 TANQUE SEPTICO DE CONCRETO CAP=25.00 M3 (02 UNID)
01.03.05.06.04.01 LIMPIEZA Y NIVELACION DE TERRENO MANUAL M2 95.00 0.45 42.75 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.06.04.02 TRAZO NIVELACION Y REPLANTEO M2 47.72 3.70 176.56 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.06.04.03 EXCAVACION MANUAL PARA ESTRUCTURAS EN MATERIAL COMP M3 192.46 16.10 3,098.61 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.06.04.04 REFILADO FINAL DE TERRENO POSTERIOR DE CORTE M2 47.72 0.48 22.91 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.06.04.05 CAMA DE APOYO CON TIERRA CERNIDA H=0.15M M3 0.60 16.71 10.03 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.06.04.06 RELLENO COMPACTADO CON MATERIAL SELECCIONADA M3 2.16 30.25 65.34 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.06.04.07 RELLENO COMPACTADO CON MATERIAL PROPIO M3 33.62 9.08 305.27 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.06.04.08 ELIMINACION MANUAL MATERIAL EXC.DM=30M M3 195.17 4.95 966.09 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.06.04.09 CONCRETO SIMPLE FC=100KL/M2 SOLDADO M3 2.19 214.10 468.88 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.06.04.10 CONCRETO FC=210KL/M2 (SIN MEZCLADORA) M3 28.19 371.95 10,485.27 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.06.04.11 ENCOFRADO Y DESENCOFRADO DE BUZON M2 248.43 36.4 9,042.85 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.06.04.12 TARRAJERO , IMPERMEABILIZACION Y ACABADOS M2 182.95 20.17 3,690.10 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.06.04.13 ACERO FY=4200 KG/M2 KG 1383.23 4.7 6,501.18 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.06.04.14 SUMINISTRO Y COLOCACION DE TUB PVC SAL 6" ISO 4435 ML 13.02 37.77 491.77 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.06.04.15 TUBERIA PVC NTP-ISO 4435 S-25 DN 110 MM ML 12.60 32.19 405.59 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.06.04.16 SUMINISTRO Y COLOCACION DE ACCESORIOS Y OTROS (TANQUEUnd 2.00 474.01 948.02 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.06.05 POZO PERCOLADOR (04 UNI)
01.03.05.06.05.01 LIMPIEZA Y NIVELACION DE TERRENO MANUAL M2 136.00 0.45 61.20 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.06.05.02 TRAZO NIVELACION Y REPLANTEO M2 57.40 3.7 212.38 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.06.05.03 EXCAVACION MANUAL PARA ESTRUCTURAS EN MATERIAL COMP M3 249.68 16.1 4,019.85 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.06.05.04 REFILADO FINAL DE TERRENO POSTERIOR DE CORTE M2 57.40 0.48 27.55 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.06.05.05 CAMA DE APOYO CON TIERRA CERNIDA H=0.15M M3 1.92 16.71 32.08 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.06.05.06 RELLENO COMPACTADO CON MATERIAL ZARANDEADO M3 6.91 30.25 209.03 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.06.05.07 RELLENO COMPACTADO A MANO -MATERIAL PROPIO M3 5.49 9.08 49.85 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.06.05.08 ELIMINACION MANUAL MATERIAL EXC.DM=30M M3 287.21 4.95 1,421.69 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.06.05.09 MURO DE CIMIENTACION MEZCLA 1.10 +30% P.G M3 14.62 167.09 2,442.86 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.06.05.10 CONCRETO FC=210KL/M2 (SIN MEZCLADORA) M3 10.04 371.95 3,734.38 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.06.05.11 ENCOFRADO Y DESENCOFRADO DE BUZON M2 82.40 36.40 2,999.36 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.06.05.12 ACERO FY=4200 KG/M2 KG 144.00 4.70 676.80 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.06.05.13 MURO ESTABLE CON PIEDRA Y MORTERO M2 655.56 35.00 22,944.60 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.06.05.14 GRAVA FILTRANTE CON PIEDRA DE 6" Y GRAVA DE 1"- BASE M3 15.52 47.70 740.30 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.06.05.15 RELLENO CON GRAVA SELECCIONADA DE 1/2 ESPALDON MURO M3 43.36 44.63 1,935.16 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.06.05.16 TUBERIA PVC NTP-ISO 4435 S-25 DN 110 MM ML 18.06 32.19 581.35 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.06.05.17 SUMINISTRO Y COLOCACION DE ACCESORIOS Y OTROS (PERCOUnd 4.00 83.57 334.28 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.06.06 LECHO DE SECADO (01 UNID)
01.03.05.06.06.01 LIMPIEZA Y NIVELACION DE TERRENO MANUAL M2 225.00 0.45 101.25 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.06.06.02 TRAZO NIVELACION Y REPLANTEO M2 118.76 3.70 439.41 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.06.06.03 EXCAVACION MANUAL PARA ESTRUCTURAS EN MATERIAL COMP M3 102.38 16.10 1,648.32 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.06.06.04 REFILADO FINAL DE TERRENO POSTERIOR DE CORTE M2 128.64 0.48 61.75 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.06.06.05 MATERIAL BASE SELECCIONADO H=0.10 M M3 9.40 16.71 157.07 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.06.06.06 RELLENO COMPACTADO A MANO -MATERIAL PROPIO M3 15.79 9.08 143.37 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.06.06.07 ELIMINACION MANUAL MATERIAL EXC.DM=30M M3 107.06 4.95 529.95 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.06.06.08 CONCRETO FC=175 KG/CM2 (SIN MEZCLADORA) M3 8.49 341.89 2,902.65 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.06.06.09 CIMIENTOS CORRIDOS MEZCLA C.H - 1.10 + 30% PG M3 18.95 170.63 3,233.44 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.06.06.10 SOBRE CIMIENTO MEZCLA C.H - 1.8 +25% P.M M2 6.61 205.96 1,361.40 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.06.06.11 MURO DE PIEDRA EN MORTERO C.H= 1.10 KG 27.96 164.01 4,585.72 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.06.06.12 ENROCADO CANALETA CON PIEDRA MEDIANA TAM 4"-6" M2 49.40 35.31 1,744.31 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.06.06.13 ENCOFRADO Y DESENCOFRADO M3 31.64 20.03 633.75 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.06.06.14 TARRAJEO EN INTERIORES Y EXTERIORES MEZCLA C.A-1.5, E=1.5M3 96.73 20.85 2,016.82 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.06.06.15 SUMINISTRO Y COLOCACION DE COLUMNAS DE MADERA D=6" ML 41.58 21.63 899.38 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.06.06.16 ESTRUCTURA DE TECHO CON MADERA - SOLERAS Y CORREAS Und 511.88 28.27 14,470.85 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.06.06.17 COBERTURA DE TECHO CON CALAMINA N°22(1.83x0.83) 129.95 15.39 1,999.93 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.06.06.18 PUERTA RUSTICA DE MADERA (2.00x1.10) DOBLE HOJA M2 1 259.13 259.13 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.06.07 CERCO PERIMETRICO (150.50ML)
01.03.05.06.07.01 LIMPIEZA Y NIVELACION DE TERRENO MANUAL M2 225.75 0.45 101.59 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.06.07.02 TRAZO NIVELACION Y REPLANTEO M2 90.3 1.89 170.67 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.06.07.03 EXCAVACION MANUAL PARA ESTRUCTURAS EN MATERIAL COMP M3 5.51 13.8 76.04 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.06.07.04 CONCRETO FC=175 KG/CM2 (SIN MEZCLADORA) M3 5.34 246.24 1,314.92 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.06.07.05 SUMINISTRO E INSTALACION DE ROLLISOS DE MADERA L=2.10Mx4Und 53.00 14.1 747.30 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.06.07.06 SUMINISTRO E INSTALACION ALAMBRE DE PUAS PARA CERCO N°ML 790.13 1.33 1,050.87 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.06.07.07 INSTALACION DE PUERTA DE INGRESO RUSTICO (0.90x1.55M) Und 1 66.87 66.87 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.07 UBS CON LETRINAS DE ARRASTRE HIDRAULICO (58 UNID)
01.03.05.07.01 ESTRUCTURA
01.03.05.07.01.01 TRABAJOS PRELIMINARES
01.03.05.07.01.01.01LIMPIEZA Y NIVELACION DE TERRENO MANUAL M2 2301.44 0.45 1,035.65 951.72 428.27 41.35% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.07.01.01.02TRAZO NIVELACION Y REPLANTEO M2 1481.76 1.89 2,800.53 611.78 1,156.26 41.29% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.07.01.02 MOVIMIENTO DE TIERRAS
01.03.05.07.01.02.01EXCAVACION MANUAL PARA ESTRUCTURA EN MATERIAL COMPA M3 442.66 13.80 6,108.71 96.00 1,324.80 21.69% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.07.01.02.02PERFILADO Y CONPACTADO EN FUNDACIONES M2 258.10 1.72 443.93 106.75 183.61 41.36% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.07.01.02.03RELLENO COMPACTO CON MATERIAL SELECCIONADA M3 187.69 5.81 1,090.48 77.01 447.43 41.03% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.07.01.02.04ELIMINACION MANUAL MATERIAL EXC.DM=30M M3 412.20 3.50 1,442.70 96.00 336.00 23.29% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.07.01.03 OBRAS DE CONCRETO SIMPLE
01.03.05.07.01.03.01CIMIENTOS CORRIDOS MEZCLA C;H-1.10 +30% PG. M3 109.62 166.05 18,202.40 22.19 3,684.65 20.24% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.07.01.03.02SOBRE CIMIENTOS MEZCLA C;H 1.8 +25% P.M M3 16.99 196.96 3,346.35 5.40 1,063.58 31.78% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.07.01.03.03FALSO PISO DE 4" CON MEZCLA C;H - 1.8 M2 168.08 28.15 4,731.45 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.07.01.03.04CONCRETO F C=175 KG/CM2 (SIN MEZCLADORA) M3 21.95 341.89 7,504.49 20.33 6,951.31 92.63% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.07.01.03.05ENCOFRADO Y DESENCOFRADO M2 487.49 30.99 15,107.32 124.00 3,842.76 25.44% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.07.01.04 OBRAS DE CONCRETO ARMADO
01.03.05.07.01.04.01LAVADERO DE CONCRETO
01.03.05.07.01.04.01CONCRETO F C=210 KG/CM2 (SIN MEZCLADORA) M3 15.93 371.95 5,925.16 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.07.01.04.01ENCOFRADO Y DESENCOFRADO M2 276.37 29.65 8,194.37 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.07.01.04.01ACERO FY=4200 KG/M2 KG 2215.05 4.71 10,432.89 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.07.01.04.02COLUMNAS
01.03.05.07.01.04.02CONCRETO F C=210 KG/CM2 (SIN MEZCLADORA) M3 14.25 371.95 5,300.29 2.30 855.49 16.14% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.07.01.04.02ENCOFRADO Y DESENCOFRADO M2 361.92 39.25 14,205.36 68.64 2,694.12 18.97% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.07.01.04.02ACERO FY=4200 KG/M2 KG 2500.98 4.71 11,779.62 ### 4,935.04 41.89% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.07.01.04.03VIGAS
01.03.05.07.01.04.03CONCRETO F C=210 KG/CM2 (SIN MEZCLADORA) M3 13.59 371.95 5,054.80 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.07.01.04.03ENCOFRADO Y DESENCOFRADO M2 193.78 40.15 7,780.27 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.07.01.04.03ACERO FY=4200 KG/M2 KG 3188.07 4.71 15,015.81 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.07.01.04.04CAJA VALVULA DE CONTROL
01.03.05.07.01.04.04CONCRETO F C=175 KG/CM2 (SIN MEZCLADORA) M3 1.56 341.89 533.35 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.07.01.04.04CONCRETO F C=210 KG/CM2 (SIN MEZCLADORA) M3 0.41 371.95 152.50 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.07.01.04.04ENCOFRADO Y DESENCOFRADO M2 71.92 20.03 1,440.56 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.07.01.04.04ACERO FY=4200 KG/M2 KG 153.03 4.71 720.77 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.07.01.04.05ESTRUCTURA MADERA TECHO
01.03.05.07.01.04.05VIGA DE APOYO DE MADERA 2"x2"x2.10M P2 629.38 9.42 5,928.76 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.07.01.04.05CORREAS DE MADERA 2"x2"X3m P2 599.41 6.96 4,171.89 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.07.02 ARQUITECTURA
01.03.05.07.02.01 MUROS Y TABIQUE SE ALBAÑERIA
01.03.05.07.02.01.01MUROS DE SOGA CON LADRILLO DE ARCILLA 0..09x0.12x0.24 M M2 695.32 55.22 38,395.57 239.64 13,232.92 34.46% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.07.02.02 REVOQUES ENLUCIDOS Y MOLDURAS
01.03.05.07.02.02.01TARRAJEO EN INTERIORES MEZCLA C.A-1.5,E=1.5CM M2 433.26 22.63 9,804.67 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.07.02.02.02FROTACHADO Y ACABADOS MUROS CARAVISTAS EXTERIORES M2 654.82 6.26 4,099.17 181.90 1,138.69 27.78% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.07.02.02.03TARRAJEO EN INTERIORES MEZCLA C.A-1.5,E=1.5CM/PULIDO CO M2 382.80 31.31 11,985.47 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.07.02.02.04TARRAJEO DE VIGAS Y COLUMNAS MEZCLA C.A-1.5,E=1.5 CM M2 325.87 24.91 8,117.42 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.07.02.02.05TARRAJEO EN EXTERIORES MEZCLA C.A-1.5,E=1.5 CM7PULIDO C M2 220.92 30.18 6,667.37 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.07.02.03 ZOCALOS
01.03.05.07.02.03.01ZOCALOS DE CEMENTO PULIDO C.A 1.5 H=0.20 M M2 37.12 30.18 1,120.28 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.07.02.04 CONTRAZOCALOS
01.03.05.07.02.04.01CONTRA ZOCALOS DE CEMENTO PULIDO C.A 1.5 H=0.20 M M2 66.70 30.18 2,013.01 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.07.02.05 PISOS Y PAVIMENTOS
01.03.05.07.02.05.01PISO DE CEMENTO PULIOD Y BRUÑADO E=2" CON OCRE M2 167.04 30.08 5,024.56 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.07.02.06 COBERTURA
01.03.05.07.02.06.01COBERTURA CON PLANCHA ENTERNIT DE 1.10x2.44x4M (ONDA 100M2 428.74 45.23 19,391.91 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.07.02.07 CARPINTERIA DE MADERA
01.03.05.07.02.07.01PUERTA DE MADERA MACHIHEMBRADA M2 97.44 249.03 24,265.48 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.07.02.07.02VENTANA DE MADERA CON MALLA MOSQUITERO M2 15.66 121.32 1,899.87 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.07.02.08 CERRAJERIA
01.03.05.07.02.08.01CERRADURA TIPO PEDILLA PARA BAÑOS Und 58.00 45.00 2,610.00 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.07.02.08.02BISAGRA ALUMINIZADA CAPUCHINA DE 4"x4" Und 174.00 13.28 2,310.72 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.07.02.09 PINTURA
01.03.05.07.02.09.01PINTURA AL LATEX MATE INTERIORES 2 MANOS M2 508.08 8.31 4,222.14 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.07.02.09.02PINTURA AL LATEX MATE EXTERIORES 2 MANOS M2 905.67 8.06 7,299.70 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.07.02.09.03PINTURA ESMALTE EN ZOCALOS H=0.20M M2 103.82 7.52 780.73 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.07.03 INSTALACIONES SANITARIAS
01.03.05.07.03.01 SISTTEMA DE AGUA FRIA
01.03.05.07.03.01.01EXCAVACION MANUAL PARA ESTRUCTURAS EN MATERIAL COMP M3 141.16 10.73 1,514.65 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.07.03.01.02CAMA DE APOYO CON TIERRA CERNIDA E=0.10M M3 23.2 6.44 149.41 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.07.03.01.03RELLENO COMPACTO CON MATERIAL SELECCIONADA M3 83.52 11.45 956.30 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.07.03.01.04RELLENO COMPACTO CON MATERIAL PROPIO M3 55.68 5.81 323.50 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.07.03.01.05ELIMINACION MANUAL MATERIAL EXC.DM=30M M3 30.19 3.5 105.67 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.07.03.01.06SUMINISTRO E INSTALACION TUB, PVC SAP Q 1/2" C-10 ML 1728.4 6.95 12,012.38 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.07.03.01.07SALIDA DE AGUA FRIA 1/2" PTO 58.00 21.65 1,255.70 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.07.03.01.08LLAVE DE PASO Q 1/2" Und 58.00 47.33 2,745.14 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.07.03.01.09GRIFO CROMADO DE 1/2" Und 58.00 29.37 1,703.46 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.07.03.01.10SUMINISTRO E INSTALACION ACCESORIOS SISTEMA DE AGUA FRIGLB 58.00 114.70 6,652.60 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.07.03.01.11SUMINISTRO E INSTALACION ACCESORIOS CAJA DE VALVULA C Und 58.00 95.92 5,563.36 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.07.03.02 SISTEMA DE DESAGUE
01.03.05.07.03.02.01EXCAVACION MANUAL PARA ESTRUCTURAS EN MATERIAL COMP M3 177.13 10.73 1,900.60 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.07.03.02.02CAMA DE APOYO CON TIERRA CERNIDA E=0.10M M3 32.36 6.44 208.40 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.07.03.02.03RELLENO COMPACTADO CON MATERIAL SELECCIONADA M3 116.51 11.45 1,334.04 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.07.03.02.04RELLENO COMPACTADO CON MATERIAL PROPIO M3 38.84 5.81 225.66 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.07.03.02.05ELIMINACION MANUAL MATERIAL EXC.DM=30M M3 57.21 3.50 200.24 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.07.03.02.06TUBERIA PVC SAL DE 2" ML 939.60 6.75 6,342.30 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.07.03.02.07TUBERIA PVC SAL DE 4" ML 742.40 10.91 8,099.58 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.07.03.02.08SALIDA DE DESAGUE PVC SAL 2" M2 174.00 30.98 5,390.52 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.07.03.02.09SALIDA DE DESAGUE PVC SAL 4" KG 116.00 58.19 6,750.04 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.07.03.02.10SALIDA DE VENTILACION EN PVC SAL 2" M2 58.00 59.22 3,434.76 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.07.03.02.11SUMIDERO C/TRAMPA PVC SAL 2" M3 116.00 30.64 3,554.24 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.07.03.02.12SUMIDERO C/TRAMPA "P" CON REGISTRO UND 58.00 43.08 2,498.64 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.07.03.02.13REGISTRO DE BRONCE 4" Und 58.00 35.06 2,033.48 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.07.03.02.14SUMINISTRO E INSTALACION DE ACCESORIO SISTEMA DE DESAGM3 58.00 204.64 11,869.12 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.07.03.02.15COLOCACION DE CAJA DE REGISTRO DE 12"x24" ML 58.00 135.20 7,841.60 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.07.03.03 APARATOS SANITARIO Y ACCESORIOS
01.03.05.07.03.03.01IDORO BLANCO 6.0 LITROS PZA 58.00 194.99 11,309.42 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.07.03.03.02LAVATORIO DE PARED BLANCO 1 LLAVE PZA 58.00 141.81 8,224.98 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.07.03.03.03DUCHA CON TERMA ELECTRICA PZA 58.00 149.07 8,646.06 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.07.03.04 INSTALACIONES ELECTRICAS
01.03.05.07.03.0.01 SALIDA DE TECHO C/CABLE AWG TW 2.5MM(14)+D PVC SEL 19MM(3
PTO 58.00 56.06 3,251.48 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.07.03.0.02 SALIDA DE INTERRUPTOR PTO 58.00 32.61 1,891.38 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.07.03.0.03 SALIDA DE PARED PARA TERMA PTO 58.00 71.02 4,119.16 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.07.03.0.04 TABLERO DE DISTRIBUCION DE 02 LLAVES Und 58.00 84.85 4,921.30 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.07.03.0.05 ACOMETIDA DESDE VIVIENDA PROM=15.00M ML 1160.00 2.09 2,424.40 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.08 UBS CON LETRINAS DE ARRASTRE HIDRAULICO Y BIODIGESTOTORES (04 UNID)
01.03.05.08.01 ESTRUCTURAS
01.03.05.08.01.01 TRABJAJOS PRELIMINARES
01.03.05.08.01.01.01LIMPIEZA Y NIVELACION DE TERRENO MANUAL M2 158.72 0.45 71.42 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.08.01.01.02TROZO, NIVELACION Y REPLANTEO M2 102.19 1.89 193.14 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.08.01.02 MOVIMIENTO DE TIERRA 0.00 0.00 0.00 #DIV/0! Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.08.01.02.01EXCAVACION MANUAL PARA ESTRUCTURAS EN MATERIAL COMP M3 30.53 13.80 421.31 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.08.01.02.02PERFILADO Y COMPACTADO EN FUNDACIONES M2 17.80 1.72 30.62 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.08.01.02.03RELLENO COMPACTADO CON MATERIAL PROPIO M3 12.94 5.81 75.18 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.08.01.02.04ELIMINACION MANUAL MATERIAL EXC.PM=30M M3 28.43 3.5 99.51 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.08.01.03 OBRAS DE CONCRETO SIMPLE
01.03.05.08.01.03.01CIMIENTOS CORRIDOS MEZCLA CH-1.10 +30% PG M3 7.56 166.05 1,255.34 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.08.01.03.02SOBRE CIMIENTOS CORRIDOS MEZCLA CH-1.18 +25% P.M M3 1.17 196.96 230.44 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.08.01.03.03FALSO PISO DE 4" CON MEZCLA C.H-1.8 M2 11.59 28.15 326.26 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.08.01.03.04CONCRETO FC=175KG/CM2 (SIN MEZCLADORA) M3 1.51 341.89 516.25 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.08.01.03.05ENCOFRADO Y DESENCOFRADO, SOBRE CIMIENTOS M3 33.62 30.99 1,041.88 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.08.01.04 OBRAS DE CONCRETO ARMADO
01.03.05.08.01.04.01LAVADERO DE CONCRETO
01.03.05.08.01.04.01CONCRETO FC=210KG/CM2 (SIN MEZCLADORA) M3 1.10 371.95 409.15 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.08.01.04.01ACERO FY=4200 KG/CM2 KG 19.06 29.65 565.13 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.08.01.04.01ENCOFRADO Y DESENCOFRADO LOSA M2 152.76 4.71 719.50 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.08.01.04.02COLUMNAS
01.03.05.08.01.04.02CONCRETO F C=210 KG/CM2 (SIN MEZCLADORA) M3 0.98 371.95 364.51 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.08.01.04.02ENCOFRADO Y DESENCOFRADO M2 24.96 39.25 979.68 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.08.01.04.02ACERO FY=4200 KG/M2 KG 172.76 4.71 813.70 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.08.01.04.03VIGAS
01.03.05.08.01.04.03CONCRETO F C=210 KG/CM2 (SIN MEZCLADORA) M3 0.94 371.95 349.63 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.08.01.04.03ENCOFRADO Y DESENCOFRADO CV. COLUMNAS M2 13.36 40.15 536.40 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.08.01.04.03ACERO FY=4200 KG/M2 KG 219.88 4.71 1,035.63 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.08.01.04.04CAJA VALVULA DE CONTROL
01.03.05.08.01.04.04CONCRETO F C=175 KG/CM2 (SIN MEZCLADORA) M3 0.11 341.89 37.61 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.08.01.04.04CONCRETO F C=210 KG/CM2 (SIN MEZCLADORA) M3 0.03 371.95 11.16 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.08.01.04.04ENCOFRADO Y DESENCOFRADO M2 4.96 20.03 99.35 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.08.01.04.04ACERO FY=4200 KG/M2 KG 10.55 4.71 49.69 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.08.01.04.05ESTRUCTURA MADERA TECHO
01.03.05.08.01.04.05VIGA DE APOYO DE MADERA 2"x2"x2.10M P2 43.41 9.42 408.92 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.08.01.04.05CORREAS DE MADERA 2"x2"X3m P2 41.34 6.96 287.73 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.08.02 ARQUITECTURA
01.03.05.08.02.01 MURO Y TABIQUES DE ALBAÑILERIA
01.03.05.08.02.01.01MURO DE SOGA CON LADRILLO DE ARCILLA 0.09x0.12x3.00 M. M2 47.96 55.22 2,648.35 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.08.02.02 REBOQUES EN LUCIDOS Y MOLDURAS
01.03.0508..02.02.01TARRAJEO EN INTERIORES MEZCLA C.A-1.5,E=1.5CM M2 29.88 22.63 676.18 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.0508..02.02.02FROTACHADOS Y ACABOS MUROS CARAVISTAS EXTERIORES M2 45.16 6.26 282.70 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.0508..02.02.03TARRAJEO EN INTERIORES MEZCLA C.A-1.5,E=1.5CM / PULIDO C M2 26.40 31.31 826.58 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.0508..02.02.04TARRAJEO EN INTERIORES MEZCLA C.A-1.5,E=1.5CM M2 22.46 24.91 559.48 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.0508..02.02.05TARRAJEO EN INTERIORES MEZCLA C.A-1.5,E=1.5CM / PULIDO C M2 15.24 30.18 459.94 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.08.02.03 ZOCALOS
01.03.05.08.02.03.01ZOCALOS DE CEMENTO PULIDO C.A 1.5 H=0.20 M M2 2.56 30.18 77.26 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.08.02.04 COTRAZOCALOS
01.03.05.08.02.04.01CONTRAZOCALOS DE CEMENTO PULIDO C.A 1.5 H=0.20 M M2 4.60 30.18 138.83 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.08.02.05 PISO Y PADIMENTOS
01.03.05.08.02.05.01PISOS DE CEMENTO PULIDO Y BRUÑADO E=2" CON OCRE M2 11.52 30.08 346.52 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.08.02.06 COBERTURA
01.03.05.08.02.06.01COBERTURA CON PLANCHA ENTERNIT DE 1.10x2.44x4MM M2 29.57 45.23 1,337.45 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.08.02.07 CARPINTERIA DE MADERA
01.03.05.08.02.07.01PUERTA DE MADERA MACHIHEMBRADA M2 6.72 249.03 1,673.48 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.08.02.07.02VENTANA DE MADERA CON MALLA MOSQUITERO M2 1.08 121.32 131.03 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.08.02.08 CERRAJERIA
01.03.05.08.02.08.01CERRAJERIA TIPO PEDILLA PARA BAÑOS UNID 4.00 45.00 180.00 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.08.02.08.02BIZAGRA ALUMINIZADA CAPUCHINA DE 4"x4" UNID 12.00 13.28 159.36 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.08.02.09 PINTURA
01.03.05.08.02.09.01PINTURA ESMALTE EN EXTERIORES 2 MANOS M2 35.02 8.31 291.02 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.08.02.09.02PINTURA ESMALTE EN EXTERIORES 2 MANOS M2 62.46 8.06 503.43 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.08.02.09.03PINTRURA ESMALTE EN ZOCALOS H=O.20 M M2 7.16 7.52 53.84 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.08.03 INSTALACIONES SANITARIA
01.03.05.08.03.01 SISTEMA DE AGUA FRIA
01.03.05.08.03.01.01EXCAVACIONES MANUAL EN MATERIAL COMPACTO M3 9.74 10.73 104.51 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.08.03.01.02CAMA DE APOYO CON TIERRA CERNIDA E=0.01M M3 1.60 6.44 10.30 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.08.03.01.03RELLENO COMPACTADO CON MATERIAL SELECCIONADA M3 5.76 11.45 65.95 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.08.03.01.04RELLENO COMPACTADO CON MATERIAL PROPIO M3 3.84 5.81 22.31 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.08.03.01.05ELIMINACION MANUAL MATERIAL EXC.DM=30M M3 2.08 3.50 7.28 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.08.03.01.06SUMINISTRO E INSTALACION TUB, PVB, SAP, Q 1/2" C-10 ML 119.20 6.95 828.44 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.08.03.01.07SALIDA DE AGUA FRIA 1/2 PTO 4.00 21.65 86.60 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.08.03.01.08LLAVE DE GRIFO Q1/2 UNID 4.00 47.33 189.32 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.08.03.01.09GRIFO CROMADO DE 1/2 UNID 4.00 29.37 117.48 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.08.03.01.10SUMINISTRO E INSTALACION ACCESORIOS SISTEMA DE AGUA FRIGLB 4.00 114.70 458.80 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.08.03.01.11SUMINISTRO E INSTALACION ACCESORIOS CAJA DE VALVULA COUND 4.00 95.92 383.68 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.08.03.02 SISTEMA DE DESAGUE
01.03.05.08.03.02.01EXCAVACION MANUAL ZANJA EN MATERIAL COMPACTADO M3 12.22 10.73 131.12 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.08.03.02.02CAMA DE APOYO CON TIERRA CERNIDA E=0.01M M3 2.23 6.44 14.36 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.08.03.02.03RELLENO COMPACTADO CON MATERIAL SELECCIONADA M3 8.04 11.45 92.06 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.08.03.02.04RELLENO COMPACTADO CON MATERIAL PROPIO ME 2.68 5.81 15.57 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.08.03.02.05ELIMINACION MANUAL MATERIAL EXC.DM=30M M3 3.95 3.50 13.83 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.08.03.02.06TUBERIA PVC DE 2 ML 64.80 6.75 437.40 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.08.03.02.07TUBERIA PVC DE 4 ML 51.20 10.91 558.59 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.08.03.02.08SALIDA DE DESAGUE EN PVC SAL 2 PTO 12.00 30.98 371.76 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.08.03.02.09SALIDA DE DESAGUE EN PVC SAL 4 PTO 8.00 58.19 465.52 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.08.03.02.10SALIDA DE VENTILACION EN PVC 2 PTO 4.00 59.22 236.88 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.08.03.02.11SUMIDERO C/TRAMPA PVC SAL 2 UNID 8.00 30.64 245.12 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.08.03.02.12SUMIDERO C/TRAMPA "P" CON REGISTRO UNID 4.00 43.08 172.32 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.08.03.02.13REGISTRO DE BRONCE 4 UNID 4.00 35.06 140.24 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.08.03.02.14SUMINISTRO E INSTALACION ACCESORIOS SISTEMA DE DESAGU GLB 4.00 204.64 818.56 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.08.03.02.15COLOCACION DE CAJA DE REGISTRO DE 12x24" UNID 4.00 135.20 540.80 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.08.03.03 APARATOS SANITARIOS Y ACCESORIOS
01.03.05.08.03.03.01INODORO BLANCO 6.0 LITROS PZA 4.00 194.99 779.96 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.08.03.03.02LAVATORIO DE PARED BLANCO 1 LLAVE PZA 4.00 141.81 567.24 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.08.03.03.03DUCHA CON TERMA ELLETRICA PZA 4.00 149.07 596.28 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.08.04 INSTALACION ELECTRICAS
01.03.05.08.04.01 SALIDA DE TECHO C/CABLE TW 2.5MM(14)+PVC SEL 19MM(3/4) PTO 4.00 56.06 224.24 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.08.04.02 SALIDA DE INTERRUPTOR C7CABLE AWG TW 2.5MM(14)+D PVC SELPTO 4.00 32.61 130.44 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.08.04.03 SALIDA PARED PARA TERMA C/CABLE AWG TW 2.5MM(12)+D PVC P STO 4.00 71.02 284.08 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.08.04.04 TABLERO DE DISTRIBUCION DE 02 LLAVES UNID 4.00 84.85 339.40 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.08.04.05 ACOMETIDA DESDE VIVIENDA PROM=15.0M.(2.1x2.5MM THW) ML 80.00 2.09 167.20 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.08.05 BIODIGESTOR
01.03.05.08.05.01 EXCAVACION MANUAL PARA ESTRUCTURA EN MATERIAL COMPA M3 17.00 13.80 234.60 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.08.05.02 PERFILADO Y CONPACTADO EN FUNDACIONES M2 42.50 1.72 73.10 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.08.05.03 RELLENO COMPACTADO CON MATERIAL PROPIO M3 12.07 5.81 70.13 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.08.05.04 ELIMINACION MANUAL MATERIAL EXC.DM=30M M3 6.22 3.50 21.77 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.08.05.05 CONCRETO FC=175 KG/CM2 (SIN MEZCLADORA) M3 0.06 341.89 20.51 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.08.05.06 ACERO FY=4200 KG/M2 KG 14.11 4.71 66.46 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.08.05.07 BIODIGESTOR DE 600L.T.(INC.ACCESORIOS E INSTALACION) UNID 4.00 2005.32 8,021.28 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.08.06 CAJA DE REGISTRO LODOS
01.03.05.08.06.01 EXCAVACION MANUAL PARA ESTRUCTURAS EN MATERIAL COMP M3 1.54 13.8 21.25 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.08.06.02 CONCRETO FC=175KG/CM2 (SIN MEZCLADORA) M3 1.13 341.89 386.34 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.08.06.03 ENCOFRADO Y DESENCOFRADO M2 11.76 20.03 235.55 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.08.06.04 TARRAJEO E IMPERMEABILIZACION MEZCLA CA-1.5,E=1.5CM M2 5.92 23.06 136.52 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.08.06.05 INSTALACION TAPA METALICA ESTRIADA DE 75x0.75M Und 4.00 147.00 588.00 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.08.07 POZO PERCOLADOR BOL=1.50M3
01.03.05.08.07.01 TRABJAJOS PRELIMINARES
01.03.05.08.07.01.01LIMPIEZA Y NIVELACION DE TERRENO MANUAL M2 23.04 0.45 10.37 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.08.07.01.02TROZO, NIVELACION Y REPLANTEO M2 7.84 1.89 14.82 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.08.07.02 MOVIMIENTO DE TIERRA
01.03.05.08.07.02.01CORTE DE TERRENO MANUAL P/NIVLECION M3 5.76 13.65 78.62 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.08.07.02.02EXCAVACION MANUAL PARA ESTRUCTURAS EN MATERIAL COMP M3 17.42 13.80 240.40 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.08.07.02.03PERFILADO Y COMPACTADO EN FUNDACIONES M2 37.36 1.72 64.26 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.08.07.02.04CAMA DE APOYO CON TIERRA CERNIDA E=0.10M M3 0.30 6.44 1.93 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.08.07.02.05RELLENO COMPACTADO CON MATERIAL PROPIO M3 8.21 5.81 47.70 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.08.07.02.06ELIMINACION MANUAL MATERIAL EXC.PM=30M M3 19.61 3.50 68.64 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.08.07.03 OBRAS DE CONCRETO SIMPLE
01.03.05.08.07.03.01CONCRETO FC=175KG/CM2 + 30% P.M (SIN MEZCLADORA) M3 0.95 246.24 233.93 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.08.07.03.02CONCRETO FC=175KG/CM2 (SIN MEZCLADORA) M3 0.10 341.89 34.19 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.08.07.03.03ENCOFRADO Y DESENCOFRADO DADOS M2 1.14 26.86 30.62 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.08.07.04 OBRAS DE CONCRETO ARMADO
01.03.05.08.07.04.01LOSA TECHO
01.03.05.08.07.04.01CONCRETO FC=210KG/CM2 (SIN MEZCLADORA) M3 0.73 371.95 271.52 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.08.07.04.01ACERO FY=4200 KG/CM2 KG 46.48 4.71 218.92 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.08.07.04.01ENCOFRADO Y DESENCOFRADO LOSA M2 9.08 36.94 335.42 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.08.07.04.02TAPA DE CONCRETO
01.03.05.08.07.04.02CONCRETO FC=210KG/CM2 (SIN MEZCLADORA) M3 0.30 371.95 111.59 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.08.07.04.02ACERO FY=4200 KG/CM2 KG 38.11 4.71 179.50 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.08.07.04.02ENCOFRADO Y DESENCOFRADO TAPA M2 5.88 26.86 157.94 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.08.07.05 FILTROS
01.03.05.08.07.05.01MURO CILINDRICO CON LADRILLO CORRIENTE CON CABEZA Y M M2 15.36 103.18 1,584.84 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.08.07.05.02GRAVA FILTRANTE CON PIEDRA CHANCADA DE 1/2" M3 2.46 112.88 277.68 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.08.07.05.03GRAVA FILTRANTE CON PIEDRA SELECCIONADA DE RIO 2" M3 0.48 49.88 23.94 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.08.07.06 INSTALACIONES SANITARIAS
01.03.05.08.07.06.01SUMINISTRO Y COLOCACION DE ACCESORIOS Y OTROS (PERCOLUnd 4.00 83.57 334.28 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04 SUB SISTEMA DE SANEAMIENTO BASICO- CALLIPATA BAJA
01.04.01 LINEA DE CONDUCCION CON TUBERIA PVC SAP (L=150.96 ML)
01.04.01.01 LIMPIEZA Y NIVELACION DE TERRENO MANUAL ML 150.96 0.22 33.21 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.01.02 TRAZO NIVELACION Y REPLANTEO KM 0.15 452.65 67.90 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.01.03 CONTROL TOPOGRAFICO DURANTE LA EJECUCION ML 150.96 0.85 128.32 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.01.04 EXCAVACION MANUAL ZANJA E MATERIAL COMPACTO M3 59.47 10.73 638.11 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.01.05 EXCAVACION MANUAL ZANJA EN ROCA SUELTA : PERFORACION M3 0.40 24.40 9.76 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.01.06 EXCAVACION MANUAL ZANJA EN ROCA FIJA : PERFORACION Y V M3 0.40 34.61 13.84 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.01.07 LIMPIEZA DE MATERIAL RESULTANTE DE VOLADURA M3 1.00 12.90 12.90 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.01.08 REFINE Y NIVELACION DE FONDO ZANJA EN MATERIAL COMPACTML 148.69 0.28 41.63 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.01.09 REFINE Y NIVELACION DE FONDO ZANJA EN ROCA SUELTA ML 1.00 0.78 0.78 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.01.10 REFINE Y NIVELACION DE FONDO ZANJA EN ROCA FIJA ML 1.00 1.18 1.18 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.01.11 CAMA DE APOYO CON TIERRA CERNIDA E=0.01M M3 7.55 6.44 48.62 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.01.12 RELLENO COMPACTADO CON MATERIAL SELECCIONADA M3 27.17 11.45 311.10 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.01.13 RELLENO COMPACTADO CON MATERIAL PROPIO M3 55.48 5.81 322.34 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.01.14 SUMINISTRO E INSTALACION TUB, PVC. SAP Q 1.50" C-7.5 ML 158.51 6.97 1,104.81 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.01.15 SUMINISTRO E INSTALACION ACCESORIOS P.V.C GLB 1.00 193.98 193.98 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.01.16 PRUEVA HIDRAULICA Y DESIFECCION DTUBERIA ML 150.96 0.45 67.93 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.02 OBRAS DE ARTE LINEA DE CONDUCCION
01.04.02.01 CAMARA CAPTACION MANANTE C-01 (01 UND.)
01.04.02.01.01 LIMPIEZA DE TERRRO MANUAL M2 24.94 0.45 11.22 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.02.01.02 TRAZO Y REPLANTEO PRELIMINAR M2 8.13 1.89 15.37 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.02.01.03 EXCAVACION MANUAL PARA ESTRUCTURAS EN MATERIAL COMP M3 5.17 13.80 71.35 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.02.01.04 PERFILADO Y COMPACTADO EN FUNDACIONES M2 7.16 1.72 12.32 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.02.01.05 RELLENO COMPACTADO CON MATERIAL PROPIO M3 1.57 5.81 9.12 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.02.01.06 ELIMINACION MANUAL MATERIAL EXC.PM=30M M3 4.63 3.50 16.21 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.02.01.07 ENCOFRADO PERIMETRAL CON MEDIANATAM 4"Y6" M3 0.77 61.07 47.02 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.02.01.08 FILTRO CON PIEDRA PEQUEÑA TAM MX 2" M3 0.13 56.00 7.28 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.02.01.09 FILTRO CON GRAVA SELECCINADA DE 3/4" -1" M3 0.27 114.50 30.92 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.02.01.10 FILTRO CON GRAVA SELECCINADA DE 1/2" M3 0.93 56.58 52.62 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.02.01.11 CONCRETO FC=1OOKG/CM2 SOLDADO (SIN MEZCLADORA) M3 0.03 212.44 6.37 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.02.01.12 CONCRETO FC=175KG/CM2 (SIN MEZCLADORA) M3 1.23 341.89 420.52 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.02.01.13 CONCRETO FC=210KG/CM2 (SIN MEZCLADORA) M3 0.82 371.95 305.00 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.02.01.14 ENCOFRADO Y DESENCOFRADO M2 17.59 20.03 352.33 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.02.01.15 TARRAJEOEN INTERIORES Y EXTERIORES MEZCLA C.A-1.5.E=1.5 M3 5.36 20.43 109.50 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.02.01.16 TARRAJEO E IMPERMEABILIZACION MEZCLA CA-1.5,E=1.5CM M3 2.89 23.06 66.64 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.02.01.17 PINTURA ESMALTE EN EXTERIORES M2 1.46 7.14 10.42 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.02.01.18 INSTALACION TUBERIAS DE INGRESO PVC Q=2" PERFORADO UNID 1.00 59.6 59.60 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.02.01.19 INSTALACION TUBERIAS DE SALIDA CON VALVULAS Q 1" UNID 1.00 138.31 138.31 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.02.01.20 INSTALACION TUBERIAS SISTEMA LIMPIA Y REBOSE Q=2" UNID 1.00 172.78 172.78 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.02.01.21 INSTALACION TAPA METALICA ESTRADA DE 75x0.75M UNID 1.00 266.25 266.25 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.02.01.22 INSTALACION TAPA METALICA ESTRADA DE 55x0.40M UNID 1.00 177.5 177.50 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.02.02 VALVULAS DE PURGA Q 1" TIPO I - LINEA DE CONDUSCCION (01UNID)
01.04.02.02.01 LIMPIEZA Y NIVELACION DE TERRENO MANUAL M2 8.28 0.45 3.73 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.02.02.02 TRAZO NIVELACION Y REPLANTEO M2 1.84 2.87 5.28 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.02.02.03 EXCAVACION PARA ESTRUTUTAS EN MATERIAL COMPACTADO M3 1.30 19.32 25.12 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.02.02.04 CAMA DE APOYO CON TIERRA CERNIDA E=0.01M M3 1.50 1.36 2.04 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.02.02.05 PERFILADO Y CONPACTADO EN FUNDACIONES M3 0.12 8.05 0.97 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.02.02.06 RELLENO COMPACTADO EN FUNDACIONES M2 0.43 14.71 6.33 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.02.02.07 RELLENO COMPACTADO CON MATERIAL PROPIO M3 0.48 6.69 3.21 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.02.02.08 ELIMINACION MANUAL MATERIAL EXC.DM=30M M3 0.98 3.50 3.43 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.02.02.09 CONCRETO FC=175 KG/CM2 +30 P.M (SIN MEZCLADORA) M3 0.31 347.14 107.61 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.02.02.10 ENCOFRADO Y DESENCOFRADO M2 5.11 30.80 157.39 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.02.02.11 TARRAJEO EN INTERIORES Y EXTERIORES MEZCLA C.A-1.5,E=1.5M2 1.45 20.85 30.23 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.02.02.12 ACERO FY=4200 KG/CM2 KG 5.00 4.71 23.55 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.02.02.13 SUMINISTRO E INSTALACION VALVULAS Y ACCESORIOS Q 1.5"/ QUNID 1.00 216.72 216.72 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.02.03 RESERVORIO RECTANGULAR APOYADO CAP=2.00 M3 (01 UNID)
01.04.02.03.01 TRABAJOS PRELIMINARES
01.04.02.03.01.01 LIMPIEZA Y NIVELACION DE TERRENO MANUAL M2 30.00 0.45 13.50 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.02.03.01.02 TRAZO NIVELACION Y REPLANTEO M2 8.52 1.89 16.10 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.02.03.02 MOVIMIENTO DE TIERRAS
01.04.02.03.02.01 EXCAVACION MANUAL PARA ESTRUCTURA EN MATERIAL COMPA M2 19.63 13.80 270.89 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.02.03.02.02 PERFILADO Y CONPACTADO EN FUNDACIONES M2 20.52 1.72 35.29 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.02.03.02.03 CAMA DE APOYO CON TIERRA CERNIDA E=0.01M M3 0.5 6.44 3.22 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.02.03.02.04 RELLENO COMPACTO CON MATERIAL SELECCIONADA M3 1.5 11.45 17.18 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.02.03.02.05 RELLENO COMPACTO CON MATERIAL PROPIO M3 9.66 5.81 56.12 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.02.03.02.06 ELIMINACION MANUAL MATERIAL EXC.DM=30M M3 14.88 3.50 52.08 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.02.03.03 OBRAS DE CONCRETO SIMPLE
01.04.02.03.03.01 CONCRETO F C=100 KG/M2 +30P.M (SIN MEZCLADORA) M3 0.32 212.44 67.98 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.02.03.03.02 CONCRETO FC=175KL/M2 (SIN MEZCLADORA) M3 0.05 341.89 17.09 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.02.03.04 OBRAS DE CONCRETO ARMADO
01.04.02.03.04.01 CONCRETO FC=210KL/M2 (SIN MEZCLADORA) M3 3.73 371.95 1,387.37 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.02.03.04.02 ENCOFRADO Y DESENCOFRADO M2 31.60 20.03 632.95 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.02.03.04.03 ACERO FY=4200 KG/M2 KG 442.40 4.71 2,083.70 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.02.03.05 REVOQUES ENLUCIDOS Y MOLDURAS
01.04.02.03.05.01 TARRAJEO EN EXTERIORES MEZCLA E=1.5 CM. PULIDO CON OCRM2 17.36 20.43 354.66 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.02.03.05.02 TARRAJEO E IMPERMEABILIZACIOM MEZCLA C.A-1.5,E=1.5CM M2 10.37 23.06 239.13 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.02.03.05.03 MORTERO 1.5 E=2.5" CM, PARA PENDIENTES DE FONDO M2 3.03 20.45 61.96 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.02.03.06 PINTURA .
01.04.02.03.06.01 PINTURA ESMALTE EN EXTERIORES M2 9.98 7.14 71.26 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.02.03.07 VARIOS
01.04.02.03.07.01 INSTALACION INGRESO Y BY PASS CON TUB. PVC SAP Q=1" Und 1.00 449.47 449.47 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.02.03.07.02 INSTALACION SISTEMA DE SALIDA CON VALVULAS Q=1" Und 1.00 335.57 335.57 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.02.03.07.03 INSTALACION DE SISTEMA DE LIMPI Y REBOSE Q=2" Und 1.00 285.86 285.86 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.02.03.07.04 SUMINISTRO E INSTALACION DE ESCALERAS H=1.10 M.E HIPOCL Und 1.00 648.00 648.00 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.02.03.07.05 ENROCADO PERIMETRAL CON PIEDRA MEDIANA TAM.4"-6" M3 1.44 61.07 87.94 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.02.03.08 CERCO PERIMETRICO
01.04.02.03.08.01 LIMPIEZA Y NIVELACION DE TERRENO MANUAL M2 18.00 0.45 8.10 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.02.03.08.02 TRAZO NIVELACION Y REPLANTEO M2 7.20 1.89 13.61 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.02.03.08.03 EXCAVACION PARA ESTRUTUTAS EN MATERIAL COMPACTADO M3 0.83 13.80 11.45 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.02.03.08.04 CONCRETO FC=175 KG/CM2 +30 P.M (SIN MEZCLADORA) M3 0.81 246.24 199.45 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.02.03.08.05 SUMINISTRO E INSTALACION DE RODILLOS DE MADERA L=2.10Mx4 UNID 8.00 14.10 112.80 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.02.03.08.06 SUMINISTRO E INSTALACION ALAMBRE DE PUAS PARA CERCO N°ML 151.20 1.33 201.10 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.02.03.08.07 INSTALACION DE PUERTA DE INGRESO RUSTICO (0.90x1.55M) UNID 1.00 66.87 66.87 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03 LINEA DE ADUCCION Y RED DE DISTRIBUCION CON TUBERIA PVC SAP
01.04.03.01 RED DE DISTRIBUCION CON TUBERIA PVC SAP (L=871.96mL)
01.04.03.01.01 LIMPIEZA Y NIVELACION DE TERRENO MANUAL ML 871.96 0.22 191.83 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.01.02 TRAZO NIVELACION Y REPLANTEO KM 0.87 452.65 393.81 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.01.03 CONTROL TOPOGRAFICO DURANTE LA EJECUCION ML 871.96 0.85 741.17 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.01.04 EXCAVACION MANUAL ZANJA E MATERIAL COMPACTO M3 348.78 10.73 3,742.41 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.01.05 REFINE Y NIVLACION FONDO ZANJA EN MATERIAL COMPACTADOML 871.96 0.28 244.15 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.01.06 CAMA DE APOYO CON TIERRA CERNIDA E=0.01M M3 43.60 6.44 280.78 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.01.07 RELLENO COMPACTADO CON MATERIAL SELECCIONADA M3 156.95 11.45 1,797.08 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.01.08 RELLENO COMPACTADO CON MATERIAL PROPIO M3 125.56 5.81 729.50 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.01.09 SUMINISTRO E INSTALACION TUB, PVC. SAP Q 2" C-10 ML 523.33 4.23 2,213.69 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.01.10 SUMINISTRO E INSTALACION TUB, PVC. SAP Q 1" C-10 ML 392.23 4.07 1,596.38 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.01.11 SUMINISTRO E INSTALACION ACCESORIOS P.V.C GLB 1.00 777.38 777.38 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.01.12 PRUEBA HIDRAULICA Y DESIFECCION TUBERIA ML 871.96 0.45 392.38 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.02 OBRA DE ARTE RED DE DISTRIBUCION
01.04.03.02.01 CAMARA DE ROMPE PRESIONES Q 2" TIPO -VIP (01 UNID)
01.04.03.02.01.01 TRABAJOS PRELIMINARES
01.04.03.02.01.01.01LIMPIEZA Y NIVELACION DE TERRENO MANUAL M2 11.57 0.45 5.21 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.02.01.01.02TRAZO DE NIVELACION Y REEMPLANTEO M2 3.39 1.89 6.41 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.02.01.02 MOVIMIENTO DE TIERRAS
01.04.03.02.01.02.01ESCAVACION MANUAL PARA ESTRUCTURA EN MATERIAL COMPA M3 8.31 13.80 114.68 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.02.01.02.02PERFILADO Y CONPACTADO EN FUNDACIONES M2 2.37 1.72 4.08 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.02.01.02.03CAMA DE APOYO CON TIERRA CERNIDA E=0.01M M3 0.25 6.44 1.61 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.02.01.02.04RELLENO COMPACTO CON MATERIAL SELECCIONADA M3 0.75 11.45 8.59 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.02.01.02.05RELLENO COMPACTO CON MATERIAL PROPIO M3 4.25 5.81 24.69 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.02.01.02.06ELIMINACION MANUAL MATERIAL EXC.DM=30M M3 6.14 3.50 21.49 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.02.01.03 OBRAS DE CONCRETO SIMPLE
01.04.03.02.01.03.01CONCRETO F C=100 KG/M2 SOLADO (SIN MEZCLADORA) M3 0.09 212.44 19.12 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.02.01.03.02CONCRETO FC=175KL/M2 (SIN MEZCLADORA) M3 0.06 341.89 20.51 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.02.01.04 OBRAS DE CONCRETO ARMADO
01.04.03.02.01.04.01CONCRETO FC=210KL/M2 (SIN MEZCLADORA) M3 1.10 371.95 409.15 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.02.01.04.02ENCOFRADO Y DESENCOFRADO M2 12.45 20.03 249.37 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.02.01.04.03ACERO FY=4200 KG/M2 KG 79.04 4.71 372.28 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.02.01.05 REVOQUES ENLUCIDOS Y MOLDURAS
01.04.03.02.01.05.01TARRAJEO EN INTERIORES Y EXTERIORES MEZCLA C.A-1.5,E=1.5 M2 5.18 20.43 105.83 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.02.01.05.02TARRAJEO E IMPERMEABILIZACIOM MEZCLA C.A-1.5,E=1.5CM M2 3.30 23.06 76.10 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.02.01.06 PINTURA
01.04.03.02.01.06.01PINTURA ESMALTE EN EXTERIORES M2 3.33 7.14 23.78 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.02.01.07 VALVULAS Y ACCESORIOS
01.04.03.02.01.07.01INSTALACION DE INGRESO CON VALVULAS DE Q 2" Y BOYA Und 1.00 267.84 267.84 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.02.01.07.02INSTA DE SALIDA CON TUBERIAS PVC SAP Q 2" Und 1.00 45.76 45.76 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.02.01.07.03INSTALACION SISTEMA DE LIMPIA Y REBOSE Q=2" Und 1.00 172.78 172.78 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.02.01.08 VARIOS
01.04.03.02.01.08.01ENROCADO PERIMETRAL CON PIEDRA MEDIANA TAM.4"-6" M3 0.37 61.07 22.60 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.02.02 VALVULA DE CONTROL DE Q 1" RED DE DISTRIBUCION (01 UNID)
01.04.03.02.02.01 LIMPIEZA Y NIVELACION DE TERRENO MANUAL M2 5.04 0.45 2.27 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.02.02.02 TRAZO NIVELACION Y REPLANTEO M3 1.36 1.89 2.57 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.02.02.03 EXCAVACION MANUAL PARA ESTRUCTURA EN MATERIAL COMPAC M2 1.01 13.8 13.94 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.02.02.04 PERFILADO Y CONPACTADO EN FUNDACIONES M3 1.10 1.72 1.89 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.02.02.05 CAMA DE APOYO CON TIERRA CERNIDA E=0.01M M3 0.08 6.44 0.52 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.02.02.06 RELLENO COMPACTADO CON MATERIAL SELECCIONADA M3 0.29 11.45 3.32 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.02.02.07 RELLENO COMPACTADO CON MATERIAL PROPIO M3 0.32 5.81 1.86 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.02.02.08 ELIMINACION MANUAL MATERIAL EXC.DM=30M M3 0.83 3.50 2.91 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.02.02.09 CONCRETO FC=175KL/M2 (SIN MEZCLADORA) M3 0.29 341.89 99.15 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.02.02.10 ENCOFRADO Y DESENCOFRADO M3 4.79 20.03 95.94 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.02.02.11 TARRAJEO EN INTERIORES Y EXTERIORES MEZCLA C.A-1.5,E=1.5 M3 1.45 20.43 29.62 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.02.02.12 ACERO FY=4200 KG/M2 KG 5.00 4.71 23.55 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.02.02.13 SUMINISTRO E INSTALACION DE VALVULAS Y ACCESORIO Q 2" ( Und 1.00 101.22 101.22 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.02.03 VALVULA DE CONTROL DE D=34" RED DE DISTRIBUCION (01 UNID)
01.04.03.02.03.01 LIMPIEZA Y NIVELACION DE TERRENO MANUAL M2 5.04 0.45 2.27 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.02.03.02 TRAZO NIVELACION Y REPLANTEO M2 1.36 1.89 2.57 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.02.03.03 EXCAVACION MANUAL PARA ESTRUCTURA EN MATERIAL COMPAM3 1.01 13.80 13.94 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.02.03.04 PERFILADO Y CONPACTADO EN FUNDACIONES M2 1.10 1.72 1.89 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.02.03.05 CAMA DE APOYO CON TIERRA CERNIDA E=0.01M M3 0.08 6.44 0.52 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.02.03.06 RELLENO COMPACTODO CON MATERIAL SELECCIONADO M3 0.29 11.45 3.32 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.02.03.07 RELLENO COMPACTADO CON MATERIAL PROPIO M3 0.32 5.81 1.86 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.02.03.08 ELIMINACION MANUAL MATERIAL EXC.DM=30M M3 0.83 3.50 2.91 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.02.03.09 CONCRETO FC=175KL/M2 (SIN MEZCLADORA) M3 0.29 341.89 99.15 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.02.03.10 ENCOFRADO Y DESENCOFRADO M2 4.79 20.03 95.94 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.02.03.11 TARRAJEO EN INTERIORES Y EXTERIORES MEZCLA C.A-1.5,E=1.5 M2 1.45 20.43 29.62 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.02.03.12 ACERO FY=4200 KG/M2 KG 5.00 4.71 23.55 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.02.03.13 SUMINISTRO E INSTALACION DE VALVULAS Y ACCESORIO Q 2" ( Und 1.00 99.82 99.82 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.02.04 VALVULA DE PURGA DE Q 1" / Q 3/4" TIPO II .RED DE DISTRIBUCION (02 UNID)
01.04.03.02.04.01 LIMPIEZA Y NIVELACION DE TERRENO MANUAL M2 16.56 0.45 7.45 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.02.04.02 TRAZO NIVELACION Y REPLANTEO M2 3.68 1.89 6.96 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.02.04.03 EXCAVACION MANUAL PARA ESTRUCTURA EN MATERIAL COMPAC M3 2.59 13.80 35.74 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.02.04.04 PERFILADO Y CONPACTADO EN FUNDACIONES M2 3.00 1.72 5.16 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.02.04.05 CAMA DE APOYO CON TIERRA CERNIDA E=0.01M M3 0.24 6.44 1.55 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.02.04.06 RELLENO COMPACTADO CON MATERIAL SELECCIONADA M3 0.86 11.45 9.85 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.02.04.07 RELLENO COMPACTADO CON MATERIAL PROPIO M3 0.96 5.81 5.58 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.02.04.08 ELIMINACION MANUAL MATERIAL EXC.DM=30M M3 1.96 3.50 6.86 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.02.04.09 CONCRETO FC=175KL/M2 (SIN MEZCLADORA) M3 0.61 341.89 208.55 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.02.04.10 ENCOFRADO Y DESENCOFRADO M2 10.21 20.03 204.51 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.02.04.11 TARRAJEO EN INTERIORES Y EXTERIORES MEZCLA C.A-1.5,E=1.5 M2 2.89 20.43 59.04 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.02.04.12 ACERO FY=4200 KG/M2 KG 9.99 4.71 47.05 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.02.04.13 SUMINISTRO E INSTALACION DE VALVULAS Y ACCESORIO Q 1" / QUnd 2.00 115.66 231.32 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.03 CONEXIONES DOMICILIARIAS-LAVADERO DE CONCRETO (09 UNID)
01.04.03.03.01 TRABAJOS PRELIMINARES
01.04.03.03.01.01 LIMPIEZA Y NIVELACION DE TERRENO MANUAL M2 113.85 0.45 51.23 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.03.01.02 TRAZO DE NIVELACION Y REEMPLANTEO M2 57.96 1.89 109.54 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.03.02 MOVIMIENTO DE TIERRAS
01.04.03.03.02.01 ESCAVACION MANUAL PARA ESTRUCTURA EN MATERIAL COMPA M3 39.56 13.80 545.93 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.03.02.02 PERFILADO Y CONPACTADO EN FUNDACIONES M2 14.76 1.72 25.39 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.03.02.03 CAMA DE APOYO CON TIERRA CERNIDA E=0.01M M3 3.60 6.44 23.18 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.03.02.04 RELLENO COMPACTO CON MATERIAL SELECCIONADA M3 10.80 11.45 123.66 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.03.02.05 RELLENO COMPACTO CON MATERIAL PROPIO M3 10.80 5.81 62.75 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.03.02.06 ELIMINACION MANUAL MATERIAL EXC.DM=30M M3 36.68 3.50 128.38 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.03.03 OBRAS DE CONCRETO SIMPLE
01.04.03.03.03.01 CONCRETO FC=175KL/M2 (SIN MEZCLADORA) M3 0.85 246.24 209.30 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.03.04 OBRAS DE CONCRETO ARMADO
01.04.03.03.04.01 CONCRETO FC=210KL/M2 (SIN MEZCLADORA) M3 2.16 371.95 803.41 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.03.04.02 ENCOFRADO Y DESENCOFRADO M2 43.54 20.03 872.11 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.03.04.03 ACERO FY=4200 KG/M2 KG 293.97 4.71 1,384.60 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.03.05 REVOQUES ENLUCIDOS Y MOLDURAS
01.04.03.03.05.01 TARRAJEO EN EXTERIORES MEZCLA E=1.5CM-PULIDO CON OCREM2 33.49 30.18 1,010.73 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.03.06 VARIOS
01.04.03.03.06.01 ENROCADO PERIMETRAL CON PIEDRA MEDIANA TAM.4"-6" M3 1.35 61.07 82.44 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.03.06.02 POZO DRENAJE DE AGUAS SERVIDAS (1.0x1.0x1.20M) UNID 9.00 79.50 715.50 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.03.07 CAJA DE VALVULAS DE CONTROL
01.04.03.03.07.01 CONCRETO FC=175KL/M2 (SIN MEZCLADORA) M3 0.24 341.89 82.05 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.03.07.02 CONCRETO FC=210KL/M2 (SIN MEZCLADORA) M3 0.06 371.95 22.32 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.03.07.03 ENCOFRADO Y DESENCOFRADO M2 11.16 20.03 223.53 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.03.07.04 ACERO FY=4200 KG/M2 KG 23.75 4.71 111.86 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.03.08 INSTALACION SANITARIA
01.04.03.03.08.01 SISTEMA DE AGUA FRIA
01.04.03.03.08.01.01INSTALACION ACCESORIOS SISTEMA DE AGUA FRIA UNID 9.00 135.12 1,216.08 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.03.08.02 SISTEMA DE DESAGUE
01.04.03.03.08.02.01INSTALACION ACCESORIOS SISTEMA DE DESGUE Y DRENAJE UNID 9.00 92.68 834.12 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.03.08.03 CONEXIÓN A RED PUBLICA
01.04.03.03.08.03.01SUNIMISTRO E INSTALACION VALVULAS DE CONTROL DE 3/4" UNID 9.00 129.66 1,166.94 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.04 AMPLIACION Y MEJORAMIENTO SISTEMA DE TRATAMIENTO DE AGUAS SERVIDAS
01.04.03.04.01 UBS CON LETRINAS DE ARRASTRE HIDRAULICO Y BIODIGESTOR (09 UNID)
01.04.03.04.01.01 ESTRUCTURA
01.04.03.04.01.01.01TRABAJOS PRELIMINARES
01.04.03.04.01.01.01LIMPIEZA Y NIVELACION DE TERRENO MANUAL M2 357.12 0.45 160.70 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.04.01.01.01TRAZO NIVELACION Y REPLANTEO M2 229.93 1.89 434.57 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.04.01.01.02MOVIMIENTO DE TIERRAS
01.04.03.04.01.01.02EXCAVACION MANUAL PARA ESTRUCTURA EN MATERIAL COMPA M3 69.69 13.80 961.72 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.04.01.01.02PERFILADO Y CONPACTADO EN FUNDACIONES M2 40.05 1.72 68.89 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.04.01.01.02RELLENO COMPACTO CON MATERIAL SELECCIONADA M3 29.12 5.81 169.19 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.04.01.01.02ELIMINACION MANUAL MATERIAL EXC.DM=30M M3 63.96 3.50 223.86 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.04.01.01.03OBRAS DE CONCRETO SIMPLE
01.04.03.04.01.01.03CIMIENTOS CORRIDOS MEZCLA C;H-1.10 +30% PG. M3 17.01 166.05 2,824.51 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.04.01.01.03SOBRE CIMIENTOS MEZCLA C;H 1.8 +25% P.M M3 2.64 196.96 519.97 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.04.01.01.03FALSO PISO DE 4" CON MEZCLA C;H - 1.8 M2 26.08 28.15 734.15 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.04.01.01.03CONCRETO F C=175 KG/CM2 (SIN MEZCLADORA) M3 3.41 341.89 1,165.84 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.04.01.01.03ENCOFRADO Y DESENCOFRADO M2 75.65 30.99 2,344.39 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.04.01.01.04OBRAS DE CONCRETO ARMADO
01.04.03.04.01.01.04LAVADERO DE CONCRETO
01.04.03.04.01.01.04CONCRETO F C=210 KG/CM2 (SIN MEZCLADORA) M3 2.47 371.95 918.72 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.04.01.01.04ENCOFRADO Y DESENCOFRADO M2 42.89 29.65 1,271.69 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.04.01.01.04ACERO FY=4200 KG/M2 KG 343.72 4.71 1,618.92 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.04.01.01.04COLUMNAS
01.04.03.04.01.01.04CONCRETO F C=210 KG/CM2 (SIN MEZCLADORA) M3 2.21 371.95 822.01 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.04.01.01.04ENCOFRADO Y DESENCOFRADO M2 56.16 39.25 2,204.28 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.04.01.01.04ACERO FY=4200 KG/M2 KG 388.08 4.71 1,827.86 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.04.01.01.04VIGAS
01.04.03.04.01.01.04CONCRETO F C=210 KG/CM2 (SIN MEZCLADORA) M3 2.11 371.95 784.81 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.04.01.01.04ENCOFRADO Y DESENCOFRADO M2 30.07 40.15 1,207.31 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.04.01.01.04ACERO FY=4200 KG/M2 KG 494.73 4.71 2,330.18 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.04.01.01.04CAJA VALVULA DE CONTROL
01.04.03.04.01.01.04CONCRETO F C=175 KG/CM2 (SIN MEZCLADORA) M3 0.24 341.89 82.05 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.04.01.01.04CONCRETO F C=210 KG/CM2 (SIN MEZCLADORA) M3 0.06 371.95 22.32 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.04.01.01.04ENCOFRADO Y DESENCOFRADO M2 11.16 20.03 223.53 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.04.01.01.04ACERO FY=4200 KG/M2 KG 23.45 4.71 110.45 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.04.01.01.04ESTRUCTURA MADERA TECHO
01.04.03.04.01.01.04VIGA DE APOYO DE MADERA 2"x2"x2.10M P2 97.66 9.42 919.96 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.04.01.01.04CORREAS DE MADERA 2"x2"X3.00m P2 93.01 6.96 647.35 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.04.01.02 ARQUITECTURA
01.04.03.04.01.02.01MUROS Y TABIQUE SE ALBAÑERIA
01.04.03.04.01.02.01MUROS DE SOGA CON LADRILLO DE ARCILLA 0..09x0.12x0.24 M M2 107.91 55.22 5,958.79 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.04.01.02.02REVOQUES ENLUCIDOS Y MOLDURAS
01.04.03.04.01.02.02TARRAJEO EN INTERIORES MEZCLA C.A-1.5,E=1.5CM M2 67.23 22.63 1,521.41 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.04.01.02.02FROTACHADO Y ACABADOS MUROS CARAVISTAS EXTERIORES M3 101.61 6.26 636.08 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.04.01.02.02TARRAJEO EN INTERIORES MEZCLA C.A-1.5,E=1.5CM/PULIDO CO M2 59.40 31.31 1,859.81 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.04.01.02.02TARRAJEO DE VIGAS Y COLUMNAS MEZCLA C.A-1.5,E=1.5 CM M2 50.54 24.91 1,258.95 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.04.01.02.02TARRAJEO EN EXTERIORES MEZCLA C.A-1.5,E=1.5 CM7PULIDO C M2 34.28 30.18 1,034.57 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.04.01.02.03ZOCALOS
01.04.03.04.01.02.03ZOCALOS DE CEMENTO PULIDO C.A 1.5 H=0.20 M M2 5.76 30.18 173.84 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.04.01.02.04CONTRAZOCALOS
01.04.03.04.01.02.04CONTRA ZOCALOS DE CEMENTO PULIDO C.A 1.5 H=0.20 M M2 10.35 30.18 312.36 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.04.01.02.05PISOS Y PAVIMENTOS
01.04.03.04.01.02.05PISO DE CEMENTO PULIOD Y BRUÑADO E=2" CON OCRE M2 25.92 30.08 779.67 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.04.01.02.06COBERTURA
01.04.03.04.01.02.06COBERTURA CON PLANCHA ENTERNIT DE 1.10x2.44x4M (ONDA 100M2 66.53 45.23 3,009.15 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.04.01.02.07CARPINTERIA DE MADERA
01.04.03.04.01.02.07PUERTA DE MADERA MACHIHEMBRADA M2 15.12 249.03 3,765.33 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.04.01.02.07VENTANA DE MADERA CON MALLA MOSQUITERO M2 2.43 121.32 294.81 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.04.01.02.08CERRAJERIA
01.04.03.04.01.02.08CERRADURA TIPO PEDILLA PARA BAÑOS UNID 9.00 45.00 405.00 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.04.01.02.08BISAGRA ALUMINIZADA CAPUCHINA DE 4"x4" UNID 27.00 13.28 358.56 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.04.01.02.09PINTURA
01.04.03.04.01.02.09PINTURA AL LATEX MATE INTERIORES 2 MANOS M2 78.84 8.31 655.16 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.04.01.02.09PINTURA AL LATEX MATE EXTERIORES 2 MANOS M2 140.54 8.06 1,132.75 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.04.01.02.09PINTURA ESMALTE EN ZOCALOS H=0.20M M2 16.11 7.52 121.15 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.04.01.03 INTALACIONES SANITARIAS
01.04.03.04.01.03.01SISTEMA DE AGUA FRIA
01.04.03.04.01.03.01EXCAVACIONES MANUAL EN MATERIAL COMPACTO M3 21.90 10.73 234.99 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.04.01.03.01CAMA DE APOYO CON TIERRA CERNIDA E=0.01M M3 3.60 6.44 23.18 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.04.01.03.01RELLENO COMPACTADO CON MATERIAL SELECCIONADA M3 12.96 11.45 148.39 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.04.01.03.01RELLENO COMPACTADO CON MATERIAL PROPIO M3 8.64 5.81 50.20 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.04.01.03.01ELIMINACION MANUAL MATERIAL EXC.DM=30M M3 4.68 3.5 16.38 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.04.01.03.01SUMINISTRO E INSTALACION TUB, PVB, SAP, Q 1/2" C-10 ML 268.20 6.95 1,863.99 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.04.01.03.01SALIDA DE AGUA FRIA 1/2" PTO 9.00 21.65 194.85 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.04.01.03.01LLAVE DE PASO Q1/2" UNID 9.00 47.33 425.97 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.04.01.03.01GRIFO CROMADO DE 1/2" UNID 9.00 29.37 264.33 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.04.01.03.01SUMINISTRO E INSTALACION ACCESORIOS SISTEMA DE AGUA FRIGLB 9.00 114.70 1,032.30 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.04.01.03.01SUMINISTRO E INSTALACION ACCESORIOS CAJA DE VALVULA COUNID 9.00 95.92 863.28 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.04.01.03.02SISTEMA DE DESAGUE
01.04.03.04.01.03.02EXCAVACION MANUAL ZANJA EN MATERIAL COMPACTADO ME 27.49 10.73 294.97 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.04.01.03.02CAMA DE APOYO CON TIERRA CERNIDA E=0.01M M3 5.02 6.44 32.33 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.04.01.03.02RELLENO COMPACTADO CON MATERIAL SELECCIONADA M3 18.08 11.45 207.02 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.04.01.03.02RELLENO COMPACTADO CON MATERIAL PROPIO M3 6.03 5.81 35.03 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.04.01.03.02ELIMINACION MANUAL MATERIAL EXC.DM=30M M3 8.88 3.5 31.08 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.04.01.03.02TUBERIA PVC DE 2 ML 145.8 6.75 984.15 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.04.01.03.02TUBERIA PVC DE 4 ML 115.20 10.91 1,256.83 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.04.01.03.02SALIDA DE DESAGUE EN PVC SAL 2 PTO 27.00 30.98 836.46 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.04.01.03.02SALIDA DE DESAGUE EN PVC SAL 4 PTO 18.00 58.19 1,047.42 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.04.01.03.02SALIDA DE VENTILACION EN PVC 2 PTO 9.00 59.22 532.98 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.04.01.03.02SUMIDERO C/TRAMPA PVC SAL 2 UNID 18.00 30.64 551.52 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.04.01.03.02SUMIDERO C/TRAMPA "P" CON REGISTRO UNID 9.00 43.08 387.72 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.04.01.03.02REGISTRO DE BRONCE 4 UNID 9.00 35.06 315.54 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.04.01.03.02SUMINISTRO E INSTALACION ACCESORIOS SISTEMA DE DESAGU GLB 9.00 204.64 1,841.76 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.04.01.03.02COLOCACION DE CAJA DE REGISTRO DE 12x24" UNID 9.00 135.20 1,216.80 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.04.01.03.03APARATOS SANITARIOS Y ACCESORIOS
01.04.03.04.01.03.03INODORO BLANCO 6.0 LITROS PZA 9.00 194.99 1,754.91 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.04.01.03.03LAVATORIO DE PARED BLANCO 1 LLAVE PZA 9.00 141.81 1,276.29 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.04.01.03.03DUCHA CON TERMA ELLETRICA PZA 9.00 149.07 1,341.63 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.04.01.04 INSTALACIONES ELECTRICAS
01.04.03.04.01.04.01SALIDA DE TECHO C/CABLE TW 2.5MM(14)+PVC SEL 19MM(3/4) PTO 9.00 56.06 504.54 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.04.01.04.02SALIDA DE INTERRUPTOR C7CABLE AWG TW 2.5MM(14)+D PVC SEL
PTO 9.00 32.61 293.49 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.04.01.04.03SALIDA PARED PARA TERMA C/CABLE AWG TW 2.5MM(12)+D PVC P
STO 9.00 71.02 639.18 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.04.01.04.04TABLERO DE DISTRIBUCION DE 02 LLAVES UNID 9.00 84.85 763.65 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.04.01.04.05ACOMETIDA DESDE VIVIENDA PROM=15.0M.(2.1x2.5MM THW) ML 180.00 2.09 376.20 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.04.01.05 BIODIGESTOR
01.04.03.04.01.05.01EXCAVACION MANUAL PARA ESTRUCTURA EN MATERIAL COMPA M3 38.25 13.80 527.85 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.04.01.05.02PERFILADO Y CONPACTADO EN FUNDACIONES M2 95.63 1.72 164.48 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.04.01.05.03RELLENO COMPACTADO CON MATERIAL PROPIO M3 27.16 5.81 157.80 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.04.01.05.04ELIMINACION MANUAL MATERIAL EXC.DM=30M M3 14.00 3.50 49.00 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.04.01.05.05CONCRETO FC=175 KG/CM2 (SIN MEZCLADORA) M3 0.14 341.89 47.86 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.04.01.05.06ACERO FY=4200 KG/M2 KG 31.75 4.71 149.54 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.04.01.05.07BIODIGESTOR DE 600L.T.(INC.ACCESORIOS E INSTALACION) UNID 9.00 2005.32 18,047.88 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.04.01.06 CAJA DE REGISTRO LODOS
01.04.03.04.01.06.01EXCAVACION MANUAL PARA ESTRUCTURA EN MATERIAL COMPA M3 3.46 13.80 47.75 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.04.01.06.02CONCRETO FC=175 KG/CM2 (SIN MEZCLADORA) M3 2.53 341.89 864.98 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.04.01.06.03ENCOFRADO Y DESENCOFRADO M2 26.46 20.03 529.99 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.04.01.06.04TARRAJEO E IMPLEMETACION MEZCLA C.A-1.5,E=1.6 CM M2 13.32 23.06 307.16 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.04.01.06.05INSTALACION TAPA METALICA ESTRADA DE 75x0.75M UNID 9.00 147.00 1,323.00 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.04.01.07 POZO PERCOLADOR VOL=1.50 M3
01.04.03.04.01.07.01TRABAJOS PRELIMINARES
01.04.03.04.01.07.01LIMPIEZA Y NIVELACION DE TERRENO MANUAL M2 51.84 0.45 23.33 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.04.01.07.01TRAZO NIVELACION Y REPLANTEO M2 17.64 1.89 33.34 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.04.01.07.02MOVIMIENTO DE TIERRAS
01.04.03.04.01.07.02CORTE DE TERRRENO MANUAL P/NIVELACION M3 12.96 13.65 176.90 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.04.01.07.02ESCAVACION MANUAL PARA ESTRUCTURAS EN MATERIAL COMP M3 39.20 13.80 540.96 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.04.01.07.02PERFILADO Y CONPACTADO EN FUNDACIONES M2 84.06 1.72 144.58 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.04.01.07.02CAMA DE APOYO CON TIERRA CERNIDA E=0.01M M3 0.68 6.44 4.38 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.04.01.07.02RELLENO COMPACTADO CON MATERIAL PROPIO M3 18.47 5.81 107.31 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.04.01.07.02ELIMINACION MANUAL MATERIAL EXC.DM=30M M3 44.11 3.50 154.39 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.04.01.07.03OBRAS DE CONCRTO SIMPLE
01.04.03.04.01.07.03CONCRETO FC=175 KG/CM2 +30 P.M (SIN MEZCLADORA) M3 2.13 246.24 524.49 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.04.01.07.03CONCRETO FC=140 KG/CM2 (SIN MEZCLADORA) M3 0.23 341.89 78.63 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.04.01.07.03ENCOFRADO Y DESENCOFRADO M2 2.57 26.86 69.03 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.04.01.07.04OBRAS DE CONCRETO ARMADO
01.04.03.04.01.07.04LOSA TECHO
01.04.03.04.01.07.04CONCRETO PC=210 KG/CM2 (SIN MEZCLADORA) Und 1.64 371.95 610.00 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.04.01.07.04ACERO FY=4200 KG/M2 Und 104.57 4.71 492.52 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.04.01.07.04ENCOFRADO Y DESENCOFRADO LOSA Und 20.43 36.94 754.68 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.04.01.07.04TAPA DE CONCRETO
01.04.03.04.01.07.04CONCRETO PC=210 KG/CM2 (SIN MEZCLADORA) M3 0.68 371.95 252.93 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.04.01.07.04ACERO FY=4200 KG/M2 KG 85.75 4.71 403.88 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.04.01.07.04ENCOFRADO Y DESENCOFRADO TAPA M2 13.23 26.86 355.36 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.04.01.07.05FILTROS
01.04.03.04.01.07.05MURO CILINDRICO CON LADRILLO CORRIENTE CABEZA Y MORTE M2 34.56 103.18 3,565.90 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.04.01.07.05GRAVA FILTRANTE CON PIEDRA CHANCADA DE 1/2 M3 5.54 112.88 625.36 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.04.01.07.05GRAVA FILTRANTE CON PIEDRA SELECCIONADA DEL RIO 2" M3 1.08 49.88 53.87 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.04.01.07.06INSTALACIONES SANITARIAS
01.04.03.04.01.07.06SUMINISTRO Y COLOCACION DE ACCESORIOS Y OTRO (PERCOL UND 9.00 83.57 752.13 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.05 PRUEBAS, ENSAYOS Y COTROL DE CALIDAD Err:509
01.04.03.05.01 PRUEBA A LA CALIDAD DEL CONCRETO (PRUEBA A LA COMPREN UNID 24.00 79.04 1,896.96 9.00 711.36 37.50% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03.05.02 DISEÑOS DE MEZCLAS PARA COMCRETO UNID 1.00 1200.00 1,200.00 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
02 PROGRAMA DE EDUCACION SANITARIAY CAPACITACION
.02.01 ELABORACION E IMPLEMENTACION DE EDUCACION SANITARIA GLB 1.00 2200.00 2,200.00 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
.02.02 EDUCACION SANITARIA A BENEFICIARIOS TALL 2.00 2100.00 4,200.00 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
.02.03 CAPACITACION A BENEFICIARIOS PARA OPERACIÓN Y MANTENIMTALL 1.00 1110.00 1,110.00 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
.02.04 CONSTITUCION DE JASS-COMITÉ DE MANTENIMIENTO GLB 2.00 1100.00 2,200.00 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
03 MITIGACION AMBIENTAL
03.01 PROGRAMA DE DE SUPERVISION Y VIGILANCIA AMBIENTAL
03.01.01 SUPERVICION Y VIGILANCIA AMBIENTAL MES 6.00 1750.00 10,500.00 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
03.02 PROGRAMA DE SEÑALIZACION AMBIENTAL Err:509
03.02.01 INSTALACION DE SEÑALES IMFORMATIVOS-AMBIENTALES UNID 8.00 154.21 1,233.68 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
03.03 PROGRAMA DE MONITOREO AMBIENTAL
03.03.01 MONITOREO DE LA CALIDAD DE AGUA PTO 4.00 340.00 1,360.00 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
03.03.02 MONITOREO DE LA CALIDAD DEL AIRE PTO 6.00 380.00 2,280.00 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
03.03.03 MONITOREO DEL NIVEL DE RUIDO PTO 6.00 120.00 720.00 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
03.04 PROGRAMA DE ABANDONO DE OBRA Err:509
03.04.01 LIMPIEZA FINAL DE LA OBRA M2 ### 0.05 905.98 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
03.04.01 MANEJO DE DESECHOS Y EXCAVACIONES DE TRINCHERAS M3 21.80 86.57 1,887.23 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
03.05 PLAN DE CONTINGENCIAS Err:509
03.05.01 PLAN DE CONTINGENCIAS E IMPREVISTOS AMBIENTALES GLB 1.00 5600.00 5,600.00 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
03.06 PROGRAMA DE EDUCACION AMBIENTAL
03.06.01 EDUCACION AMBIENTAL A BENEFICIARIOS TALL 2.00 3450.00 6,900.00 0.00 0.00 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
COSTO DIRECTO ### S/.259,869.83 11.12% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
TOTAL VALORIZADO ### S/.259,869.83 11.12% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
0.06582927652018 Gastos generales S/.153,799.25 S/.17,107.04 11.12% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
0.01498072765769 Expediente Técnico S/.35,000.00 S/.35,000.00 ### S/.0.00 0.00% ### ### S/.0.00 0.00%
0.03693503968273 Supervisión de Obra S/.86,292.63 S/.9,598.30 11.12% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
0.01084897876658 Liquidación de Obra S/.25,346.85 S/.0.00 0.00% S/.0.00 0.00% S/.0.00 0.00% S/.25,346.85 100.00%
TOTAL 2,636,773.84 321,575.17 12.20% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
REPROGRAMACIÓN DE OBRA
MES 01 MES 02 MES 03 MES 04 MES 05
Sem. 02 Sem. 03 Sem. 04 Sem. 01 Sem. 02 Sem. 03 Sem. 04 Sem. 01 Sem. 02 Sem. 03 Sem. 04 Sem. 01 Sem. 02 Sem. 03 Sem. 04 Sem. 01 Sem. 02 Sem. 03 Sem. 04
GERENCIA DE INFRAESTRUCTURA
SUPERVISOR #REF!
0.00 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00%
0.00 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00%
0.00 0.00 0.00 0.00% - 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00%
COSTO 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 ###
0.00%
TOTAL VALORIZADO 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00%
6990
#REF!
GOBIERNO REGIONAL CUSCO
GERENCIA REGIONAL DE INFRAESTRUCTURA
AVANCE MENSUAL
Sub Gerencia de Obras
ITEMS DESCRIPCION PARTIDA ENE FEB MAR ABR MAY JUN JUL AGO SET OCT NOV DIC ACUMUL
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF! #REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF! #REF! #REF!
#REF! #REF!
#REF! #REF! #REF! #REF!
#REF! #REF!
#REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF!
#REF! #REF!
#REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF!
#REF! #REF!
#REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF!
GOBIERNO REGIONAL CUSCO
GERENCIA REGIONAL DE INFRAESTRUCTURA
AVANCE MENSUAL
Sub Gerencia de Obras
ITEMS DESCRIPCION PARTIDA ENE FEB MAR ABR MAY JUN JUL AGO SET OCT NOV DIC ACUMUL
#REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF!
#REF! #REF!
#REF! #REF!
PARTIDAS EJECUTADAS #REF! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #REF!
METRADOS DIARIOS DE PARTIDAS NUEVAS
OBRA : “CREACIÓN DEL SISTEMA DE RIEGO POR ASPERSIÓN EN LA COMUNIDAD CAMPESINA DE HUAYNAPATA ALTA DEL DISTRITO DE
PAUCARTAMBO - PROVINCIA DE PAUCARTAMBO - DEPARTAMENTO DE CUSCO”.
Err:509
:NOVIEMBRE 2019 TOTAL
ITEMS PRESUPUESTO BASE PROGRAMADO Vi Sa Do Lu Ma Mi Ju Vi Sa Do Lu Ma Mi Ju Vi Sa Do Lu Ma Mi Ju Vi Sa Do Lu Ma Mi Ju Vi Sa MES
DESCRIPCION DE PARTIDA UND CANT 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 CANT.
01 ENROCADO EN FALZA ZAPATA 0.00
01.01 EXCAVACION MANUAL DE ZANJAS EN TIERRA COMPACTA M3 28.00 13.5 14.5 28.00
01.02 C°S°E: F'C=100 KG/CM2 + 60% PIEDRA - GRANDE M3 28.00 10 11.7 6.3 28.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
MUNICIPALIDAD
PROVINCIAL DE
FORMATO - 13
PAUCARTAMBO
GERENCIA DE INFRAESTRUCTURA
5.2.- VALORIZACION PARTIDAS NUEVAS
SUPERVISOR #REF!
EXCAVACION MANUAL DE ZANJAS EN TIERRA COMPACTA M3 28.00 22.72 636.16 0.00 0.00 0.00% 28.00 636.16 0.00% 28.00 636.16 100.00% 0.00 0.00 0.00%
C°S°E: F'C=100 KG/CM2 + 60% PIEDRA - GRANDE M3 28.00 193.98 5,431.36 0.00 0.00 0.00% 28.00 5,431.36 0.00% 28.00 5,431.36 100.00% 0.00 0.00 0.00%
COSTO 6,067.52 0.00 0.00% 6,067.52 0.00% 6,067.52 0.00% 0.00 0.00%
TOTAL VALORIZADO 6,067.52 0.00 0.00% 6,067.52 0.00% 6,067.52 0.00% 0.00 0.00%
2. METRADOS DIARIOS
OBRA : : PLAN DE MANTENIMIENTO CORRECTIVO DEL SISTEMA DE AGUA DEL SECTOR DE QUELLOMOCCO, DISTRITO DE INKAWASI, PROVINCIA DE LA CONVENCION – DEPARTAMENTO DEL CUSCO DEL
CUSCO
Nº medidas Total
Descripcion partida unidad ubicación elementos Nº veces Volumen Metrado
ITEM. Largo Ancho Altura Area
#REF! #REF!
#REF! #REF!
#REF! #REF! #REF! obra 0.35
1
#REF! #REF!
#REF! #REF! #REF! area total 528.00
obra 1 5.5 96 528.00
#REF! #REF! #REF! area total 528.00
obra 1 5.5 96 528.00
#REF! #REF!
#REF! #REF! #REF! area total 228.00
obra 1 6 38 228.00
#REF! #REF! #REF! area total 228.00
obra 1 6 38 228.00
-
OBRA: #REF!
OCT-DIC #REF! #REF! #REF! #REF! #REF! #REF! #REF! - - #REF! #REF! #REF! #REF! #REF! #REF! #REF! 421,385.54 #REF!
ABRIL #REF! #REF! #REF! #REF! #REF! #REF! #REF! - #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! 987,049.05 #REF!
- #REF! - #REF!
COSTO DIRECTO #REF! - 0.00% - 0.00% - #REF! - #REF! #REF! #REF! #REF! #REF! #REF! 2,114,895.11 #REF!
GASTOS GENERALES #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
GASTOS DE SUPERVISION #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
GASTOS EXP. TECNICO #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
GASTOS DE LIQUIDACION #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
COSTO TOTAL #REF! #REF! #REF! - 0.00% #REF! #REF! - #REF! #REF! #REF! #REF! #REF! 0.00% 2,114,895.11 #REF!
OBRA: #REF!
PROYECTO : #REF!
RESIDENTE: #REF!
INSPECTOR: #REF!
FECHA: 10/21/2019
2 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
3 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
4 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
5 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
6 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
7 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
8 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
9 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
10 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
11 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
12 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
13 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
14 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
15 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
16 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
17 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
18 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
19 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
20 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
21 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
22 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
23 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
24 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
25 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
26 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
27 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
28 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
8.3.- MOVIMIENTO VALORIZADO DE ALMACEN DE PROYECTO
PROYECTO : #REF!
RESIDENTE: #REF!
INSPECTOR: #REF!
FECHA: 10/21/2019
29 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
30 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
8.3.- MOVIMIENTO VALORIZADO DE ALMACEN DE PROYECTO
PROYECTO : #REF!
RESIDENTE: #REF!
INSPECTOR: #REF!
FECHA: 10/21/2019
31 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
32 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
33 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
34 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
35 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
36 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
37 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
38 #REF! #REF! #REF! #REF! #REF! #REF! 56 #REF! #REF! #REF! #REF! #REF! #REF! #REF!
39 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
40 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
41 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
42 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
43 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
44 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
45 #REF! #REF! #REF! #REF! #REF! #REF! 27.00 #REF! #REF! #REF! #REF! #REF! #REF! #REF!
46 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
47 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
48 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
49 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
50 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
51 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
52 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
53 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
54 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
55 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
56 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
57 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
58 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
59 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
60 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
61 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
8.3.- MOVIMIENTO VALORIZADO DE ALMACEN DE PROYECTO
PROYECTO : #REF!
RESIDENTE: #REF!
INSPECTOR: #REF!
FECHA: 10/21/2019
62 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
63 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
64 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
8.3.- MOVIMIENTO VALORIZADO DE ALMACEN DE PROYECTO
PROYECTO : #REF!
RESIDENTE: #REF!
INSPECTOR: #REF!
FECHA: 10/21/2019
65 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
66 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
67 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
68 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
69 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
70 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
71 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
72 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
73 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
74 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
75 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
76 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
77 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
78 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
79 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
80 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
81 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
82 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
83 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
84 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
85 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
86 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
87 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
88 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
89 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
90 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
91 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
COMBUSTIBLE
92 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
93 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF!
8.3.- MOVIMIENTO VALORIZADO DE ALMACEN DE PROYECTO
PROYECTO : #REF!
RESIDENTE: #REF!
INSPECTOR: #REF!
FECHA: 10/21/2019
#REF!
SALDO ANTERIOR MOVIMIENTO MENSUAL JULIO 2019
ORDEN SALDO VALORIZADO
N° DESCRIPCION INSUMOS CANTIDAD UND. P.U. TOTAL ENTRADAS SALIDA
COMP./SERV. CANTIDAD PARCIAL
CANT PARCIAL CANT. PARCIAL CANT PARCIAL
94 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
95 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
96 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
97 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
98 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
99 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
100 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
101 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
102 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
103 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
104 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
105 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
106 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
107 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
108 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
109 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
110 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
111 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
112 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
113 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
114 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
115 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
116 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
117 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
118 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
119 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
120 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
121 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
122 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
123 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
124 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
125 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
126 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
127 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
128 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
129 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
130 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
131 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
132 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
133 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
134 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
135 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
8.3.- MOVIMIENTO VALORIZADO DE ALMACEN DE PROYECTO
PROYECTO : #REF!
RESIDENTE: #REF!
INSPECTOR: #REF!
FECHA: 10/21/2019
136 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
137 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
138 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
139 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
8.3.- MOVIMIENTO VALORIZADO DE ALMACEN DE PROYECTO
PROYECTO : #REF!
RESIDENTE: #REF!
INSPECTOR: #REF!
FECHA: 10/21/2019
140 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
141 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
142 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
143 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
144 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
145 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
146 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
147 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
148 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
149 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
150 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
151 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
152 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
153 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
154 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
155 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
156 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
157 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
158 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
159 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
160 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
161 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
162 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
163 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
164 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
165 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
166 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
167 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
168 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
169 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
170 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
171 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
172 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
173 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
174 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
175 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
176 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
177 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
178 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
179 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
180 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
181 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
182 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
183 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
184 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
185 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
186 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
187 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
188 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
189 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
8.3.- MOVIMIENTO VALORIZADO DE ALMACEN DE PROYECTO
PROYECTO : #REF!
RESIDENTE: #REF!
INSPECTOR: #REF!
FECHA: 10/21/2019
190 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
191 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
192 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
193 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
194 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
195 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
196 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
197 #REF! #REF! 20 UND #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
198 #REF! 453 20 UND #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
199 #REF! 453 20 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
200 #REF! 453 20 UND #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
201 #REF! 537 5 UND #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
202 #REF! 537 5 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
203 #REF! 537 30 GLN #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
204 #REF! 537 25 GLN #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
205 #REF! 537 5 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
206 #REF! Prestamo 60 BLS #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF!
#REF!
207 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
208 #REF! #REF! #REF! UND #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
209 #REF! #REF! #REF! UND #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF!
#REF!
210 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
211 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF!
LIMPIEZA Y MOVIMIENTO DE
TIEERRA PARA CONSTRUCCION DE
CAPTACION
INSTALACION DE TUBERIA DE
LIMPIA Y REBOSE EN CAMARA
HUMEDA
ENCOFRADO Y VACIADO DE LA
CAMARA HUMEDA EN
CAPATACION
PANEL FOTOGRAFICO
: PLAN DE MANTENIMIENTO CORRECTIVO DEL SISTEMA DE AGUA DEL SECTOR DE QUELLOMOCCO, DISTRITO DE
PROYECTO INKAWASI, PROVINCIA DE LA CONVENCION – DEPARTAMENTO DEL CUSCO DEL CUSCO
PANEL FOTOGRAFICO
: PLAN DE MANTENIMIENTO CORRECTIVO DEL SISTEMA DE AGUA DEL SECTOR DE QUELLOMOCCO, DISTRITO DE
PROYECTO INKAWASI, PROVINCIA DE LA CONVENCION – DEPARTAMENTO DEL CUSCO DEL CUSCO
DESENCOFRADO DE CÁ MARAS
HÚ MEDAS DE CAPATACION
INSTALACION DE TAPAS
SANITARIAS EN CÁ MARAS
HÚ MEDAS DE CAPATACION
PANEL FOTOGRAFICO
: PLAN DE MANTENIMIENTO CORRECTIVO DEL SISTEMA DE AGUA DEL SECTOR DE QUELLOMOCCO, DISTRITO DE
PROYECTO INKAWASI, PROVINCIA DE LA CONVENCION – DEPARTAMENTO DEL CUSCO DEL CUSCO
APETURA DE LINEA DE
CONDUCCION
PANEL FOTOGRAFICO
: PLAN DE MANTENIMIENTO CORRECTIVO DEL SISTEMA DE AGUA DEL SECTOR DE QUELLOMOCCO, DISTRITO DE
PROYECTO INKAWASI, PROVINCIA DE LA CONVENCION – DEPARTAMENTO DEL CUSCO DEL CUSCO
INSTALACION DE TUBERIAS DE
LINEA DE CONDUCCION
ENCOFRADO Y DE CRP-6
INSTALACION Y PEGADO DE
TUBERIAS DE LINEA DE
CONDUCCION
REFACCIONAMIENTO Y PULIDO DE
RESERVORIO
PANEL FOTOGRAFICO
: PLAN DE MANTENIMIENTO CORRECTIVO DEL SISTEMA DE AGUA DEL SECTOR DE QUELLOMOCCO, DISTRITO DE
PROYECTO INKAWASI, PROVINCIA DE LA CONVENCION – DEPARTAMENTO DEL CUSCO DEL CUSCO
CAMBIO DE ACCESORIOS
VALVULAS DE RESERVORIO
PINTADO DE RESERVORIO
PINTADO DE DADOS DE
PROTECCION
PANEL FOTOGRAFICO
: PLAN DE MANTENIMIENTO CORRECTIVO DEL SISTEMA DE AGUA DEL SECTOR DE QUELLOMOCCO, DISTRITO DE
PROYECTO INKAWASI, PROVINCIA DE LA CONVENCION – DEPARTAMENTO DEL CUSCO DEL CUSCO
PANEL FOTOGRAFICO
: PLAN DE MANTENIMIENTO CORRECTIVO DEL SISTEMA DE AGUA DEL SECTOR DE QUELLOMOCCO, DISTRITO DE
PROYECTO INKAWASI, PROVINCIA DE LA CONVENCION – DEPARTAMENTO DEL CUSCO DEL CUSCO
PANEL FOTOGRAFICO
: PLAN DE MANTENIMIENTO CORRECTIVO DEL SISTEMA DE AGUA DEL SECTOR DE QUELLOMOCCO, DISTRITO DE
PROYECTO INKAWASI, PROVINCIA DE LA CONVENCION – DEPARTAMENTO DEL CUSCO DEL CUSCO
MUNICIPALIDAD PROVINCIAL DE
PAUCARTAMBO 39.- PANEL FOTOGRAFICO
GERENCIA DE INFRAESTRUCTURA ###