| & on Builders & Construction Hub (Pvt). Ltd, ANB/RWP/HO/PDA/12-2021/25, Date: 26-01-2022 To, Resident Engineer of the Project NESPAK (Pvt) Ltd, Peshawar. Subject: Construction of Bus Terminal at Northern Bypass/Motorway Junction, Peshawar Package-1: Terminal Bt Buildings & Allied Works: ing, Facilit Sub Head: - Re-Submission of Test Pile Load Test Methodology (Kent ledge Test Method). References: - ‘Your Letter No. 3801/321/MHR/01/04 Dt 12.11.2021 ii. Our Office Letter No. ANB/RWP/HO/PDA/12-2021/008 dated 26.11.2021 Dear Sir, Enclosed herewith please find the methodology (Kent ledge method) to carry out test on Test Pile 1 no. submitted for approval and retum of one copy (duly approved) for record please. With Thanks & Regards. Encl Annexure-“A” Bele je Abn truly Oe er Manager Copy to: Director Engineering (Road-II) Peshawar Development, nO ale Peshawar. Dy. Director (Engg-II) Directorate of Engineering (Road-I1) PDA Peshawar. CE/RE, NESPAK House Peshawar. Project Manager NESPAK House Islamabad. Office Copy. peepee House # 23-A, Quaid-e-Azam Avenue, Gulraiz Phase-3, GENE lel Ph: +92-51-8314440, Cell: +92-344-7543459 Email: info.alnoorbuildershub@gmailicom, farshad@anbl,pk Scanned with CamScanner AINNEXURE “A” ONSTRUCTION OF BUS TERMINAL AT NORTHERN BYPASS/MOTORWAY JUNCTION, pESHAWAR PACKAGE-1: METHOD STATEMENT FOR TEST PILE LOAD TEST _ . Rett et aS Se sr tr Bef pd nite a otha =, Se 3S eS "me Page 1 of 10 Scanned with CamScanner ANNEXURE “A” Project Information’s Construction of Bus Terminal at Northern Project | Bypass/Motorway Junction, Peshawar Package-1: Department Peshawar Development Authority Consultant | M/S NESPAK, Islamabad ee aes Contractor | M/S AlNoor Builders & constructions Hub (Pvt) Ltd Test Pile Information‘s Detail Pile nowt Type of load test_| Compression Pile Type cast-in-place piles Piledepth __| 21 meter Pile diameter _| 760 mm Design Load _| 60 Tons Apply Test Load _| 180 Tons Test Type __| Axial Compression ‘ASTM D143 M Testing Standard _| (2020) | Reverse Rotary with Construction Type | plain water Page 2 of 10 Scanned with CamScanner ANNEXURE “A”” Introduction “The Static Loading Test involves the direct measurement of pile head displacement in the response to a physically applied test load. It is the most fundamental form of pile load test and is considered as the benchmark of pile performance. Testing has been performed in the load range up to maximum of 180 tons as required for design criteria of the project. Scope ‘The load test wil be applied via a jack acting against a reaction beam, which is restrained by Jacking up against a reaction mass ("Kent ledge” or dead weight). The nominated test load wil be applied in oe eaee of increments in accordance with pre-determined load testing specification for a project. Fach Tosd increment is sustained for a specified time period, or until the rate of ple movement is less than a nominated value. Static load testing method will be applicable to one test tral pile. Trial pil purpose of carrying out load tests. ‘The test method will be applied as per standard deflection of a vertical deep foundation Pile load applied deep foundation to cast in place pile Significance and Use reliable relationship between the axial load applied to a deep This field tests provide the most foundation and the resulting axial movement. Test results also provide information used to assess the distribution of side shear resistance along the pile shaft, the amount of end bearing developed at the pile toe, and the long-term load-deflection behavior. les will be constructed for the ASTM D1143 M-2020. This Test measure the axial fed in static axial compression. This method will be tic Load Testing (Compression. ‘This vertical compression pile maintained load test is carried out to ensure the structural and geotechnical soundness of the pile and also to predict settlement of other ples. The usual procedure st increase the loadin stages unt the proposed working load and a certain factor of safety is reached ‘and then to unload and to leave the load off until the rise or rebound substantially ceases. Varieties of test procedures have been developed for carrying pile load test; among the most common procedures for pile load test is: ‘A. Kent ledge System (for compression test only) Page 3 of 10 ail Scanned with CamScanner ANNEXURE “A” procedure The pile load Test as per the procedure laid in ASTM D1143 M-2020 is described below; Kent ledge System Necessary bearing plates, hydraulic jack(s), hemispherical bearing. Support the ends of the test beam(s) on temporary cribbing or other devices. Respective to ASTM D1143 M-2020, 6.4.3, Platform with soil/earth, with a total weight (including that of the test beam(s) and platform) at least 10 % greater than the maximum anticipated test load. Test Foundation Preparation + Ground surface around the test pile will be prepared to the final design elevation or as directed by the Engineer. + Location of the test pile is selected with the consent of Engineer, permit construction of the load application apparatus, placement of the necessary testing and instrumentation equipment, and observation of the instrumentation. Page 4 of 10 Scanned with CamScanner For tests of sin¢ i 5 ANNEXURE “A” gle piles, will be installed a solid steel test plate at least 25 mm (1 in) thick “ perpendicular ti i Lele ean Her the ng axis of the test pile that covers the complete pile top area. The test plate «Bearing Pads wil a etween any unbraced flanges on the test pile. ill be constructed with bricks masonry & height is adjusted to the height of the Jack. reparation of platform Aer eat the plate over the pile top, jack is place align to longitudinal axis of pile over the pile top fs . Main girder is launched on the pads in such a way that, the center of the jack coincides with e center of the main girder & pile top plate. placed over the main girder. 7 5 Secondary girders are hese girders are covered with wooden logs or will be placed over shuttering plates. Earth/soll bags the platform. aratus for Applying and Measurin oad: Steel girders dimensions are as; T Total No of steel girder 2 Nes Width (top & bottom) a Inches Length 30 Feet Height 3543_|_mcnes Flange Thickness 7 Inches Web Thickness re Inch L h secondary girder details Girder Type H No. of Girders 16 po Dimensions 30FtX 1 FTX 1 FT Flange Thickness th Inches Web Thickness a Inches Page 5 of 10 Scanned with CamScanner Flange Pate iA Load calculation on platform rng stenes ANNEXURE “A” ‘Stites wen Pate der The load on the platform will be placed 10% extra to the 300% of design load. The load calculations are as below, Platform Dimensions 30 Ft X 30Ft X 4.5 Ft Volume of Earth/Mud on 4050 CFT Platform. Weight of Earth/Mud per 45 kg crr. weight of Earth/Mud = 182250 kg 4050 X45 Weight of Platform 18000 kg Total weight 200250 kg =182250+18000 Tons 200.25 Ton Page 6 of 10 Scanned with CamScanner = Test Method ANNEXURE “/ The pile head wi | Fray ead will be prepared with casing to be above the ground by sufficient length or a minimum Ass Rea ieee ledge system a5 show inthe diagram wth sfient cre when stacking and between the test 7 1 geometry of the arrangement should also aim to minimize interaction the pile, reaction system and reference beam supports. Allow a 10% to 20% margin on capacity of the reaction against maximum test load. aa equipment shall be protected from unnecessary disturbance prior to and throughout the load The loading sequence shall follow the ASTM D1143 M-2020, 8.1.5 Procedure D: Constant Time Interval Loading Test Records shall be kept promptly throughout the testing period. ASTM D1143 M-2020, B: Maintained Test 82.3, Procedure The procedure for fixing & testing will be carried out, as per specifications of ASTM D1143 M-2020 in the supervision of Consultants staff. Calibrations of all equipment to be followed as per specifications prior to start the testing. Loading of Compression + Hydraulic jack and reacting against a set of steel beams. + Hydraulic jack will be connected to the hydraulic pump. + Design loading pressure will be applied to the jack. Calibrated pressure gauge will be attached to the compression pump. Testing of the pile + Load test will be carried out in 12-increamen + Maintained each increment until the rate of mm/hour but not more than 2-hours. maximum load of 300% of design load maintained minimum time Interval of 12 hours or more til the settlement will become with in limit less than 0.01 inch or 0.25 mm/hour. «Fixing 3 nos. Dial gauges on an independent frame to measure the pile head cisplacement, | Movement of the pile head shall be measured using the dial gauge and checked with @ leveling instrument and scale rules fixed to their holders, The scale rule shall have an accuracy of 1mm, visually interpretable to 0.5mm. its (25% to the design load up to 300% increments) the settlement is not greater than 0.01 inch or 0.25 Page 7 of 10 Scanned with CamScanner & Aloading of the Pile load ANNEXURE ‘After completing the final load increment, remove the load in decrements of 25 % of the maximum test load with 1 hr. Between decrements. Failure Criteria Tf failure occurs during loading, maintain the failure load, or the maximum load possible, until the total axial movement equals 15 % the pile diameter or width. Page 8 of 10 Scanned with CamScanner ANNEXURE “A” Sequence of Loading & Unloading SNo. Loading % of Design Load Steps 1 25 | 7 50 2 75 O 100 | 5 125 6 150 | 7 175 | 8 200 9 225 10 250 11 275 [ 12 300 Un-Loading Steps SNo. Un-Loading % of total Load | 250 1 z 200 | 150 3 100 4 50 5 0 6 Page 9 of 10 Scanned with CamScanner hedule of pile load test ANNEXURE “A” Jack Ram 1. area = Applied Test Load = 180 ton Design Load =60 Ton 330.106 in2 Remarks Load | Standard) Load Time duration _| settlement | F°™ Load Increment} 4), si , Hours ' ‘on [individuall Cumulative)" Loading | 1 25 100 15 1 2 so | 200 | 30 1 3 7s | 300 | 45 1 4 1oo | 400 | 60 1 5 125 | 500 | 75 1 6 150 | 600 | 90 1 7 175 | 700 | 105 1 8 200 | 801 | 120 1 9 225 | 901 | 135 1 10 250 | 1001 | 150 1 11 275 | 1101 | 165 1 12 300 | 1201 | 180 | 1242 14 ziHouts Sustain | Unloading _ 1 250 | 1001 | 150 1 _| 2 200 | 801 | 120 1 3 150 | 600 | 90 1 4 1oo | 400 | 60 1 5 50 | 200 30 1 2 Hours 6 . . | 0 0.00 | 0.00 | 6+2 8 Sustain | Page 10 of 10 Scanned with CamScanner NV 1d) WYHOsLV 1d 1S31 GVO1 A lld Scanned with CamScanner yo xnly ANx-A 30 SAE POEL L THHE Tan tr ; “PILE LOAD TEST PLATFORM Scanned with CamScanner ANx-A PCC(1:2:4)|_ ~___ Gross Beams (12"x12")(30 LONG 16 No's)_ eile Test Beams (35.5°x12") (30 LONG 2 Steel Test Plat ce eel Test Plate Hydraulic Jack _ (86" height) SECTION 1-1 Scanned with CamScanner ANX-A ate nee PCC 1:24 HeRES 7 BRICK MASONARY RATIO 1:3 yy oO (CEMENT SAND MORTAR Top of ile P.cci48 | a SECTION 1-1 uh wt £3 * P.C.C 1:2:4 BRICK MASONARY RATIO 1:3 (CEMENT SAND MORTAR. 6-4 ; a sas" Top of Pe _ Top thie, © ze] _ Peete |i poci4s, [eh (a me 1 dase" 4 Steel detail at 2-2 i Steel detail at 1-1 Scanned with CamScanner

You might also like