You are on page 1of 1

Lembar :225

70.00 00
65
.0
65

0
.000
70
.000

Ke Ds.
Kalina
9240900.00

nas
BM RG 04 (2017)
X = 528909.042 BM RG 04 (2017)
Y = 9240859.478
Z = 90.095 m
X = 528908.986
Y = 9240859.133
Z = 90.095 m
90.0

Kantor POLHUT
P.
0 00
in g
E xist CP 04 (2017)
O ut 50 CP 04 (2017) X = 528927.962
ut 0+ X = 528927.962
Y = 9240790.329
Ro Y = 9240790.329

.5
TP
es Z = 94.976 m Z = 94.976 m
Aks

000
3
00
95.0

1
P.
000
2
90.00
jl.09.ki

000
1
000
1
jl.10.ki

Desa Kalinanas

000
1
0
75.000

0
1+5
jl.08.ki jl.11.ki

100.000

000
1
jl.09.ka

000
2
jl.08.ka

000
2
jl.12.ki

75.000
jl.10.ka

000
2
jl.11.ka jl.13.ki
Akses Rout Out Existing

9240700.00
TP.4

000
3
000
2
jl.07.ka
a
LAUT JAWA

80.00

80.000
85
jl.07.ki jl.12.ka jl.14.ki

000
1
wan
jl.15.ki

.00
100.000

P.2
jl.13.ka

95.000
K.Ju

90.000

0
jl.14.ka
0

000
2
jl.06.ka

105.0
jl.06.ki

00
jl.15.ka
PEMBAGUNAN

105.0
bh 08

00
JEMBATAN RELOKASI

000
1
BM RG 03 (2017)

110.0

Jalan
jl.05.ki jl.05.ka

poros
bh 09 X = 528799.186

ds kali
Y = 9240657.151

2+50
10 bh 07
Z = 90.503 m

nanas
5. bh 10
00 bh 11 jl.04.ki
BM RG 03 (2017)

000
1
000
2
jl.04.ka
bh 12
bh 06
X=
CP 03 528799.186
(2017)

Jala
85.0 jl.03.ki Y = 9240657.151
X = 528789.763
Y = 9240607.014
0 bh 13 jl.03.ka
Z = 90.503 m
Z = 87.768 m

80.00

75.00
bh 05

P.3
jl.02.ki

n
26. Jarmi
jl.02.ka

CP 02 (2017) bh 14
TP.6 JALAN HANTAR TP.3

KE BENDUNGAN

poro
bh 04

70.00
X = 528300.763 jl.01.ki

00
000
1

Ke
000
2
Y = 9240514.170 bh 15

65.

000
1
Z = 105.410 m jl.01.ka
CP 03 (2017)

To
000
1
70.00

00
BM RG 0 Ki (2015)

8
K.Banyuasi

da
5 3+5
70.
bh 03
CP 02 (2017) n 00 jl.0.ki
X = 528789.763

na
0
65.

3+5
X = 528241.895

3.6

n
bh 16
BM RG 0 Ki (2015)
Y = 9240432.860 25. Sasri X = 528300.763 BM KNL Y = 9240607.014

s
X = 528241.895 BM RG 02 (2017) jl.0.ka
BM.KNL
Y = 9240432.860
Z = 104.299 mm
bh 02 Y = 9240514.170 Z = 87.768 m K.
Z = 104.299 X = 528287.317
Y = 9240474.598 Z = 105.410 m
X = 528424.514 Bod

to
Des
000
1
Z = 105.132 m Y = 9240534.069 ri

K. Ku
9240500.00
bh 17

Z = 99.426 m

000
2
00

24. Sukimin BM KNL 75.

P.4
110.000 bh 01a X = 528424.514

a Ka
000
1
Y = 9240534.069

asin
BM RG 02 (2017) Z = 99.426 m

DESA DANGKLUTUK

mal
bh 01
RELOKASI JALAN

yu
X = 528287.317 .000JALAN HANTAR

K. Co
i Ban
DESA KALINANAS - TODANAN 85 KE RUMAH KATUP
TP.2
Y = 9240474.598 4+50
.000 bh 18

Kal
000
2
4+80
80.00
Z = 105.132 m 90.00 85 00

li Na
4+88

90.00 .0
90

but
85.00
85.00

000
1
TP.7

K.S

K. Ram
Alat Ukur V Notch P.5

ragi

95.000
bg 01 BM.0 KI
BM.0.KI
EL.72.50
bh 19

LOKASI PROYEK

nas
Jalan Hantar 0
0.00
TP.8
EL 99.00 0
Ke Rumah Katub
5+5
10 DESA KALINANAS
bg 02 Drainase
BM RG KN8 (2015)
TP.1
Ke V Notch
X = 528303.859
Y = 9240376.890
6

-
Z = 91.009 m P.
.000 105.000

Jap
105 TP.9
110.000
bg 03 BM.KN 8
K.Ba

lo
BM RG KN8 (2015)

Papan Duga Air X = 528303.859


Y = 9240376.890
nyu bh 20

.000
BM.KN-8

So
BM.KN-8
Z = 91.009 m

bg 04 asin

50
115

6+
0

wan
EL.72.50
EL

EL.67.00

EL.72.50

ah
.85 0.00
bh 21

.00

enga
12

00
0

6.0
000
000
5.00

ayu
Pu

K.B
.0

10.
10.
0
ncak

90
.0
12

95
9240300.00
Be

K. Ser
bg 04a
ndun EL
.85

7
gan EL.74.30

P.
.00

75.00

0
ELPU EL.75.55
60R

0.00
+74
.99 .00
X = 528614.372
NC
.00TP.10
Kolam Dewatering K BE

13
105.000

PROPINSI
ND Y = 9240178.177 bh 22
bg 05 5x5m UN
7+50
GN +117.800
ngan
P.8

00
EL Kali Banyu asin
kaca

5.0
.99
8+50 .00
K.Pe
JAWA TIMUR

13
00
6.0
en
bg 06
BM.KN 8.KR
ing K.Serayu K.Ju
EL.80
140.0
00
law
Be .00
nd
un
K.K
g Pe
ng
bh 23
125.0
Kolam Dewatering ela 12 00

105.000
BM RG 0 Ka (2015)

110.000
5x5m k EL CP 0 Ka (2015) 0.
00
.80. 0

K. Lukul
X = 528623.610 X Jalan
=Jalan
528668.384
Hantar
Hantar CP 0 Ka (2015)
bg 07
00

K.Pedagalan
K. Ked
bh 24
CP.0 KA Y = 9240182.718 YKe
Ke
= Bendungan
9240142.631
Bendungan X = 528623.610
Y = 9240182.718
Z = 117.870 m Z = 126.081 m Z = 117.870 m
bg 08

ung Ben
o
bh 25
BM RG 0 Ka (2015) 00
145.0
+76.00
CP 01 (2017)

K. Bogo
Jalan Existing X = 528668.384

K. Ijo
0

in
Y = 9240142.631

PROPINSI

uas
5.00 X = 528756.629
Z = 126.081 m

any
11 JALAN EXISTING Temporary Coverdam BM.0.KN

er
K.B
BM.0
BM.0KA
KA Y = 9240106.812

wonto
KALINANAS - TODANAN Z = 127.962
CP 01m(2017)
(JALAN KEHUTANAN)
Desa Kalinanas
9240100.00
AREA
AREA FASILITAS
FASILITAS UMUM
UMUM X = 528756.629
Y = 9240106.812
JAWA BARAT

115.00
EL 99.00 Z = 127.962 m

12
bh 26

110.0

K.G
5.0
12
0.0

100

en
bg 09
0

90

0
bgt 01
RENCANA AS DAM SITE

tan
.00
.00
bgt 02

85.
bg 10

00
BM. RG 01 (2017) 130.000
bgt 03
X = 528726.200

80
.00
Y = 9240103.308

Desa Kalinanas
Z = 127.930 m
10
0.0
BM. RG 01 (2017)

75.00
75.0
0

.000

70.00
10 11 X = 528726.200
5.0
0 BLOK KUCING 0. 125.000 bgt 04

95
Y = 9240103.308
10 000

80
120.000
9,27 Ha

95.00
5. Z = 127.930 m

90.00

85.00

.00
10 000 115.000
0.
95 00
.0 0 bgt 05

00
90
.0
85 00
.0
00
80
.0
00 bgt 06

Desa Kalinanas
SAMUDRA INDONESIA
9239900.00 JALAN EXISTING

0
POROS DESA

80.00
KALINANAS - JAPAH
Kali
Om
bo

0
85.00

000
75.00
75.0
0
90.00
90
.00

90.00
85 0
.0
00

Desa Kalinanas
29. SUKARJAN
TABEL KOOORDINATE BM DAN CP
6,06 Ha
13
5.00

9239700.00
0

13
0.00
0 0

Desa Kalinanas 13
0.
00

13
Koordinat Koordinat
125.000
12
5.00
5.0
00
No Nama No Nama
120.000 0
X Y Z X Y Z
115.000

110.000
CP 05 (2017)
X = 529373.940
BM RG 05 (2017)
120.000 1 1R 528726.152 9240115.434 +128.323 28 26R 529379.738 9237575.176 +120.117
Y = 9239477.851
Z = 114.404 m X = 529409.216
Y = 9239477.796
105.000 Z = 112.691 m 115.000
2 2R 528830.145 9240076.908 +130.276 29 27R 529338.218 9237624.463 +116.581

110.0
9239500.00

00
10
100.000

3 3R 528906.529 9240088.871 30 28R 529343.186 9237756.574

5.00
+134.128 +116.259

0
Desa Gaplokan 528953.498
95.000

4 4R 9240152.687 31 BM5 / 2015 529325.204 9237780.901

120.000
+144.946 +116.630

105.000
BM 4 2015 528412.358 9238402.018
BM 7

110.0
BM 04A X= 529695.143

115.000
Y= 9239307.454 DESA GAPLOKAN

00
Z= + 101.172
5 5R 528990.632 9240182.331 +142.029 32 29R 529335.331 9237871.330 +114.847
6 BM 8 / 2015 529014.010 9240289.171 + 128.877 33 30R 529248.426 9237984.063 +107.207
7 + 127.675 34 31R
9239300.00 90.000
CP8 / 2015 529055.887 9240310.034 529065.297 9237964.594 +104.234
8 6R 529031.353 9240239.343 +135.337 35 32R 528927.886 9238250.875 +109.745
95.000 CP.7
X= 529681.857
Y=
Z=
9239198.823
+ 88.184
9 7R 529237.418 9239965.033 +146.799 36 33R 528877.946 9238233.896 +109.248
100.000

105.000 Jalan
10 8R 529349.210 9239885.404 +137.580 37 34R 528815.669 9238201.215 +108.856
Desa poros
Kali
Nanas
- Jap
ah 11 9R 529410.046 9239764.459 +133.238 38 35R 528788.183 9238172.739 +109.017
9239100.00 110.000
125.0
00
00
120.0

11
5.00
0 12 10R 529489.816 9239704.826 +137.379 39 36R 528615.855 9238286.129 +109.451
BM RG 06 (2017)
X = 530174.155
13 11R 529609.182 9239495.943 40 BM 02a / 2015 528521.9319

105.000
115.000 Y = 9239076.625
Z = 123.095 m
+118.134 9238400.5763 +105.800
100.000

X = 530637.01 Y = 9236826.43
0
5.00
10
11
0.00
0
5.00
0
14 12R 529889.728 9239291.607 +101.642 41 BM 4 2015 528412.358 9238402.018 +129.977

0
11

00

0
0

5.00
0.
0.00

10

10
12 0

DI
5.00
15 13R 529855.897 42 9238596.931

AR
12
9238980.544 +106.790 37R 528484.948 +135.710
120.000

UP
0 CP 06 (2017)

/S
0.00 X = 530200.717 115. WAGIMAN
13 90. PANDI /

ATI
87. SUKIJAN Y = 9239058.781

9238900.00

RW
SARINAH
/ LAPIYO
Z = 117.647
113.mSUKINI
85. SUWINTONO
88. SUKARNI 91. SUTI / PANDI 16 14R 9238858.929 +96.471 43 38R 528498.572 9238618.607 +135.126
100.000

DA
102. SURATMAN 530036.350

SU
95. PAERAH

/ .
K

YO INI 86
83. TOTO 94. SUPARTINI
90.000
90.000

89. WARSIDI 117. SUMIARSIH 103. SUWARTINI / 105. SUK


ARSIH /
KARSINI SUPAN 17 15R 529577.824 9238701.740 +96.316 44 39R 528538.353 9238804.690

TO AT
105.000

78. SUPARJO 104. SULA


STRI
+125.385

BU . NG
93. KARMI 96. SARINI

AN /
115.000

AN
110.00

GIM NI
STRI DARM
100.000

RLAN /

SU PASI
77. SULASTRI

84
81. SUPA
BLOK II
92. SUSILO RSI 114. SULA
105.000

100. SUWA

I/
0

106.
NYAMINI

AN AT
97. JUWANTO / JO
18 16R

MIJ RIY
AR 108. SUL
82. SUWARDI 13,42 Ha 101. SUPARNI
SUMINDAR 99. WAGIMAN / KATIRAH SUP ASI 529577.742 9238523.350 +113.189 45 40R 528581.468 9238818.995 +130.108

LA . SUP

O/
IPAN 7.

SULA KARN
79. NGAR 116. LEGIMAN 10 109. SUYATNO

76
100 98. SUTIKAH / RUMININGSIH

75. SUDARWATIN
/
.000 112. SUTARMI / SUMIJAN

74. SU
TI
80. SAWILAH 19 529446.835 9238318.714 +110.668 46 41R 528619.308 9238867.627 +131.070

SUTARSONO
105.00
110 0
BM 06A BM RG 06
X = 529600.178
73. RAMIJAN
118. SUMARNO
AH/SUPARM
I
111. SAEN 110. SUKASWATI
17R
.000
115 Y = 9238632.543
.000
72. MULYANI
120
.000 Z = 113.552 m
20 529552.736 9238150.841 47 42R 528638.189 9238914.474 +131.713

71 MIN
18R +110.181
9238700.00

. S AH
JU
UR
61. SUPARMIN

AT
125.00 BM 05A

MI
0 115.0
55. BARJO 00

/
60. BAKRI
120.000
21 19R 529562.877 9238037.482 +108.408 48 43R 528643.877 9238945.883 +127.645
120 N
.000 RJA
115 59. SA 62. PENI

64. SARMAN
.000
110
.000
54. SUDA RWATI 22 20R 529680.475 9237935.136 +110.695 49 44R 528595.950 9238963.600 +121.137
KECAMATAN JAPAH
105
.000

100 53. MUS 58. SUMINDAR


.000 TAM
52. TUMI
69. LASMAN 23 21R 529689.272 9237867.333 +110.238 50 45R 528527.605 9239066.234 +109.582
57. TOTOK / DAMI 65. SUPRAKTI 70. SAMINAH
63. SARIJAN
BM RG 07 (2017)
X = 530396.119
Y = 9238562.639
Z = 127.578 m

SARIJAN
Desa Kalinanas CP 07 (2017)

49. WARSINI /
X = 530426.740

24 22R
Y = 9238557.400

51 528387.808
Z = 127.682 m

68. SUPARTI
529656.708 9237803.803 BM 3 2015 9239064.691 +107.737

STRI /
+114.528

SULASUTARI
SADIMAN
56. DARWATI /
9238500.00 66. SUDARWAT
I/ 67. LASIRAH

13
130.00
51.
SUMI

0.00
130.000
50 SUDIR 25 23R 529653.896 9237671.722 +114.981 52 CP.3 / 2015 528447.645 9239003.179 +110.030

0
0
.S
UM
IAR
SIH
48. SIMI
26 24R 529682.007 9237569.855 53 46R 528322.818 9239097.358 +105.094

110.000
+118.057

11

115.000

120.00
0.0
00
INI
47. RUHM

0
95.0
00
27 25R 529636.365 9237527.854 54 47R 528299.411 9239348.902 +102.483
90.000
46. SARNI Desa Gaplokan +118.493
DESA KALINANAS 45. SUJIRAN
55 48R 528294.277 9239374.560 +99.011
90
.000

9238300.00 40. SAWILAH/RAKIMAN CP 08 (2017)


Desa Gaplokan 56 49R 528068.518 9239494.621 +97.732
X = 529506.431
95

43. PASINI / RATIBAN Y = 9238229.843


BLOK I
Koordinat 527815.432
.000

2,14 Ha 44. NGARIPAN


Z = 106.294 m
57 BM 2 / 2015 9239495.573 +112.285
No Nama
100

39. JASMIN/ PA LAN


.000

42. RAMIJAN
Desa Gaplokan 41. KASMIJAN
BM RG 08 (2017)
X = 529518.021
X Y Z 58 50R 527928.331 9239741.688 +139.118
Y = 9238172.350
Z = 105.477 m
10

1 BM RG 0 Ka (2015) 528668.384 9240142.631 +126.081


130.0

5.00
11

59 51R 527959.141 9239713.086 +132.282


0
00

0.00
11
5.00

0
120.0

2 BM KN8 (2015) 528303.859 9240376.890 +91.009


00

60 52R 528190.373 9239911.724 +110.452


125.0

9238100.00
00

3 BM RG 0 Ki (2015) 528241.895 9240432.860 +104.299 9239244.334


90
.000 61 BM 01a / 2015 527688.163 +103.250

DESA GAPLOKAN
DESA GAPLOKAN
Desa Gaplokan 4 BM KNL (2015) 528424.514 9240534.069 +99.426
62 BM 1 / 2015 528191.805 9239894.937 +104.604
95
.0
00

5 BM RG 06 (2015) 529600.178 9238632.543 +113.552 63 CP.1 / 2015 528237.588 9239897.057 +97.659


95.0
00

95.000

90 .000

6 528726.200
90

BM. RG 01 (2017) 9240103.308 +127.930


.000

00
100.000 95
64 9239939.307

105.0
.000
53R 528207.858 +103.057
10
110.0
115.0

0.00
00 105.000
10

0
0.

00

528287.317 9240474.598 +105.132

00
BM RG 02 (2017)
00

9237900.00 7
0

110.0

.000
65 54R 528227.742 9239953.413 +97.286

115
105.000 8 BM RG 03 (2017) 528799.186 9240657.151 +90.503 9240046.914
66 55R 528194.203 +98.638
110.000

9 BM RG 04 (2017) 528908.986 9240859.133 +90.095


115.000 67 56R 528163.781 9240144.602 +101.420
10 BM RG 05 (2017) 529409.216 9239477.796 +112.691 68 60R 528614.372 9240178.177 +177.800
DESA GAPLOKAN 11 BM RG 06 (2017) 530174.155 9239076.625 +123.095
69 BM 7 / 2015 529695.143 9239307.454 +101.172
9237700.00 BM RG 07 (2017) 530396.119
12 9238562.639 +127.578
70 CP 7 / 2015 529681.857 9239198.823 +88.184
BM 03A
13 BM RG 08 (2017) 529518.021 9238172.350 +105.477

14 CP 0-Ka (2015) 528623.610 9240182.718 +117.870

15 CP 01 (2017) 528756.629 9240106.812 +127.962


KETERANGAN :
9237500.00 16 CP 02 (2017) 528300.763 9240514.170 +105.410 - Referensi Kontrol Horizontal (koordinat X dan Y) mengacu pada BM Nasional
Titik Kontrol Geodesi N1.0313 BAKOSURTANAL (BIG) yang diikatkan dengan
17 CP 03 (2017) 528789.763 9240607.014 +87.768
KALI pengukuran GPS Geodetic ke titik BM RG 0. Ka (2015) dan BM. RG.01 (2017)
- Referensi Kontrol Vertikal (Ketinggian Z) mengacu dari titik studi terdahulu yaitu BM RG.0 Ka (2015)
B OGE Desa Gaplokan Jalan poros
18 CP 04 (2017) 528927.962 9240790.329 +94.976
- Elevasi Muka Air Normal (MAN) 94.27 meter
RAN Desa Kali Nanas - Japah 19 CP 05 (2017) 529373.940 9239477.851 +114.404 - Elevasi Muka Air Banjir (MAB) 96.50 meter
G 20 CP 06 (2017) 530200.717 9239058.781 +117.647
9237300.00 0 16 32 48 64 80 m
P2 21 CP 07 (2017) 530426.740 9238557.400 +127.682
Desa Gaplokan
22 CP 08 ( 2017 ) 529506.431 9238229.843 +106.294
SKALA 1 : 8000

PROVINSI :
9237100.00 KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL SUMBER DAYA AIR JAWA TENGAH
BALAI BESAR WILAYAH SUNGAI PEMALI - JUANA PEKERJAAN :
SATKER BALAI BESAR WILAYAH SUNGAI PEMALI - JUANA
Jln. Brigjen S.Sudiarto No.375 Telp (024) 6723212 - 6722240 Fax. (024) 6722239 SEMARANG SERTIFIKASI DESAIN BENDUNGAN
RANDUGUNTING
( BENDUNGAN UTAMA )

PETA SITUASI GENANGAN BENDUNGAN


527500.00

530300.00
527300.00

527700.00

527900.00

528100.00

528300.00

528700.00

528900.00

529100.00

529300.00

529500.00

529700.00

529900.00

530100.00

530500.00

530700.00
528500.00

KABUPATEN LOKASI : BLORA


RANDUGUNTING
SKALA 1 : 2000 NO. LEMBAR : 1 / 50

PT. IKA ADYA PERKASA KETUA TIM Ir.Harjuna, Sp NO. REGISTER : RD-RDG-V-01
CONSULTING ENGINEERING & GENERAL TRADING
Kantor : Jalan Sidoarjo No.1 Malang, Telp. 0341-567273, Fax. 0341 560870 DIREKTUR Drs. Isbandi, MM TANGGAL NO. KONTRAK
DIPERIKSA DAN DI SETUJUI DIREKSI PEKERJAAN WIDI PRADIPTA,ST,M.Eng.

PPK PERENCANAAN DAN PROGRAM KALMAH, ST., M.Si., M.Sc 10 APRIL 2017 09/KU.03.01-Ao.6.2/PERPROG-
MENGETAHUI BBWSPJ/KNT/2017
No. tgl. Yang direvisi Digambar Diperiksa Disetujui KABID PROGRAM DAN PERENCANAAN UMUM DANI HAMDAN, ST., M.Sc

You might also like