5 - PEKERJAAN ELEKTRIKAL
NO. URAIAN PEKERJAAN KETERANGAN SATUAN QTY QTY (+/-
)
Lantai 1
10 PP-LANTAI 1 unit 1.00
Penambahan MCB AC MCB 1P 10A 4,5 kA bh 1.00
11 MCB BOX GUESTROOM A-1 unit 1.00
Penambahan MCB AC MCB 1P 10A 4,5 kA bh
12 MCB BOX GUESTROOM A-2 unit 1.00
Penambahan MCB AC MCB 1P 10A 4,5 kA bh
13 MCB BOX GUESTROOM A-3 unit 1.00
Penambahan MCB AC MCB 1P 10A 4,5 kA bh
14 MCB BOX GUESTROOM A-4 unit 1.00
Penambahan MCB AC MCB 1P 10A 4,5 kA bh
15 MCB BOX GUESTROOM B-1 unit 1.00
Penambahan MCB AC MCB 1P 10A 4,5 kA bh
Lantai 2
16 PP-LANTAI 2 unit 1.00
Penambahan MCB AC MCB 1P 10A 4,5 kA bh 1.00
17 MCB BOX GUESTROOM A-1 unit 1.00
Penambahan MCB AC MCB 1P 10A 4,5 kA bh
18 MCB BOX GUESTROOM A-2 unit 1.00
Penambahan MCB AC MCB 1P 10A 4,5 kA bh
19 MCB BOX GUESTROOM A-3 unit 1.00
Penambahan MCB AC MCB 1P 10A 4,5 kA bh
20 MCB BOX GUESTROOM A-4 unit 1.00
Penambahan MCB AC MCB 1P 10A 4,5 kA bh
21 MCB BOX GUESTROOM A-5 unit 1.00
Penambahan MCB AC MCB 1P 10A 4,5 kA bh
22 MCB BOX GUESTROOM A-6 unit 1.00
Penambahan MCB AC MCB 1P 10A 4,5 kA bh
23 MCB BOX GUESTROOM A-7 unit 1.00
Penambahan MCB AC MCB 1P 10A 4,5 kA bh
24 MCB BOX GUESTROOM A-8 unit 1.00
Penambahan MCB AC MCB 1P 10A 4,5 kA bh
25 MCB BOX GUESTROOM A-9 unit 1.00
Penambahan MCB AC MCB 1P 10A 4,5 kA bh
26 MCB BOX GUESTROOM A-10 unit 1.00
Penambahan MCB AC MCB 1P 10A 4,5 kA bh
27 MCB BOX GUESTROOM A-11 unit 1.00
Penambahan MCB AC MCB 1P 10A 4,5 kA bh
Lantai 3
28 PP-LANTAI 3 unit 1.00
Penambahan MCB AC MCB 1P 10A 4,5 kA bh 1.00
29 MCB BOX GUESTROOM A-1 unit 1.00
Penambahan MCB AC MCB 1P 10A 4,5 kA bh
30 MCB BOX GUESTROOM A-2 unit 1.00
Penambahan MCB AC MCB 1P 10A 4,5 kA bh
31 MCB BOX GUESTROOM A-3 unit 1.00
Penambahan MCB AC MCB 1P 10A 4,5 kA bh
32 MCB BOX GUESTROOM A-4 unit 1.00
Penambahan MCB AC MCB 1P 10A 4,5 kA bh
33 MCB BOX GUESTROOM A-5 unit 1.00
Penambahan MCB AC MCB 1P 10A 4,5 kA bh
34 MCB BOX GUESTROOM A-6 unit 1.00
Penambahan MCB AC MCB 1P 10A 4,5 kA bh
35 MCB BOX GUESTROOM A-7 unit 1.00
Penambahan MCB AC MCB 1P 10A 4,5 kA bh
36 MCB BOX GUESTROOM A-8 unit 1.00
Penambahan MCB AC MCB 1P 10A 4,5 kA bh
37 MCB BOX GUESTROOM A-9 unit 1.00
Penambahan MCB AC MCB 1P 10A 4,5 kA bh
38 MCB BOX GUESTROOM A-10 unit 1.00
Penambahan MCB AC MCB 1P 10A 4,5 kA bh
39 MCB BOX GUESTROOM A-11 unit 1.00
Penambahan MCB AC MCB 1P 10A 4,5 kA bh
Lantai 5
40 PP-LANTAI 5 unit 1.00
Penambahan MCB AC MCB 1P 10A 4,5 kA bh 1.00
41 MCB BOX GUESTROOM A-1 unit 1.00
Penambahan MCB AC MCB 1P 10A 4,5 kA bh
42 MCB BOX GUESTROOM A-2 unit 1.00
Penambahan MCB AC MCB 1P 10A 4,5 kA bh
43 MCB BOX GUESTROOM A-3 unit 1.00
Penambahan MCB AC MCB 1P 10A 4,5 kA bh
44 MCB BOX GUESTROOM A-4 unit 1.00
Penambahan MCB AC MCB 1P 10A 4,5 kA bh
45 MCB BOX GUESTROOM A-5 unit 1.00
Penambahan MCB AC MCB 1P 10A 4,5 kA bh
NO. URAIAN PEKERJAAN KETERANGAN SATUAN QTY QTY (+/-
)
46 MCB BOX GUESTROOM A-6 unit 1.00
Penambahan MCB AC MCB 1P 10A 4,5 kA bh
47 MCB BOX GUESTROOM A-7 unit 1.00
Penambahan MCB AC MCB 1P 10A 4,5 kA bh
48 MCB BOX GUESTROOM A-8 unit 1.00
Penambahan MCB AC MCB 1P 10A 4,5 kA bh
49 MCB BOX GUESTROOM A-9 unit 1.00
Penambahan MCB AC MCB 1P 10A 4,5 kA bh
50 MCB BOX GUESTROOM A-10 unit 1.00
Penambahan MCB AC MCB 1P 10A 4,5 kA bh
51 MCB BOX GUESTROOM A-11 unit 1.00
Penambahan MCB AC MCB 1P 10A 4,5 kA bh
Lantai 6
52 PP-LANTAI 6 unit 1.00 -
Lantai 7
53 PP-LIFT PENUMPANG unit 1.00
54 P.CTR LIFT unit 1.00
Lantai 1
85 NYY 4 x 10 mm2 + BC 6 Dari SDB ke PP-LANTAI 1 m 28.00
mm2
86 NYM 3 x 2.5 mm2 + Conduit Dari PP-LANTAI 1 ke EF-L1.RBS m 7.00
101 NYM 3 x 2.5 mm2 + Conduit Dari MCB BOX GUESTROOM m 6.00
A-3 ke EF-L1.3
Lantai 2
102 NYY 4 x 10 mm2 + BC 6 Dari SDB ke PP-LANTAI 2 m 31.00
mm2
103 NYM 3 x 2.5 mm2 + Conduit Dari PP-LANTAI 2 ke EF-L2.RBS m 7.00
106 NYM 3 x 2.5 mm2 + Conduit Dari MCB BOX GUESTROOM m 7.00
A-1 ke EF-L2.1
NO. URAIAN PEKERJAAN KETERANGAN SATUAN QTY QTY (+/-
)
107 NYM 3 x 4 mm2 Dari PP-LANTAI 2 ke MCB m 17.00
BOX GUESTROOM A-2
108 NYM 3 x 2.5 mm2 + Conduit Dari MCB BOX GUESTROOM m 5.00 (5.00)
A-2 ke IU-L2.2
109 NYM 3 x 2.5 mm2 + Conduit Dari MCB BOX GUESTROOM m 6.00
A-2 ke EF-L2.2
112 NYM 3 x 2.5 mm2 + Conduit Dari MCB BOX GUESTROOM m 6.00
A-3 ke EF-L2.3
115 NYM 3 x 2.5 mm2 + Conduit Dari MCB BOX GUESTROOM m 6.00
A-4 ke EF-L2.4
118 NYM 3 x 2.5 mm2 + Conduit Dari MCB BOX GUESTROOM m 6.00
A-5 ke EF-L2.5
120 NYM 3 x 2.5 mm2 + Conduit Dari MCB BOX GUESTROOM m 5.00 (5.00)
A-6 ke IU-L2.6
121 NYM 3 x 2.5 mm2 + Conduit Dari MCB BOX GUESTROOM m 6.00
A-6 ke EF-L2.6
123 NYM 3 x 2.5 mm2 + Conduit Dari MCB BOX GUESTROOM m 5.00 (5.00)
A-7 ke IU-L2.7
124 NYM 3 x 2.5 mm2 + Conduit Dari MCB BOX GUESTROOM m 6.00
A-7 ke EF-L2.7
126 NYM 3 x 2.5 mm2 + Conduit Dari MCB BOX GUESTROOM m 5.00 (5.00)
A-87 ke IU-L2.8
127 NYM 3 x 2.5 mm2 + Conduit Dari MCB BOX GUESTROOM m 6.00
A-87 ke EF-L2.8
129 NYM 3 x 2.5 mm2 + Conduit Dari MCB BOX GUESTROOM m 5.00 (5.00)
A-9 ke IU-L2.9
130 NYM 3 x 2.5 mm2 + Conduit Dari MCB BOX GUESTROOM m 6.00
A-9 ke EF-L2.9
132 NYM 3 x 2.5 mm2 + Conduit Dari MCB BOX GUESTROOM m 5.00 (5.00)
A-10 ke IU-L2.10
133 NYM 3 x 2.5 mm2 + Conduit Dari MCB BOX GUESTROOM m 6.00
A-10 ke EF-L2.10
NO. URAIAN PEKERJAAN KETERANGAN SATUAN QTY QTY (+/-
)
134 NYM 3 x 4 mm2 Dari PP-LANTAI 2 ke MCB m 15.00
BOX GUESTROOM A-11
135 NYM 3 x 2.5 mm2 + Conduit Dari MCB BOX GUESTROOM m 5.00 (5.00)
A-11 ke IU-L2.11
136 NYM 3 x 2.5 mm2 + Conduit Dari MCB BOX GUESTROOM m 6.00
A-11 ke EF-L2.11
Lantai 3
137 NYY 4 x 10 mm2 + BC 6 Dari SDB ke PP-LANTAI 3 m 35.00
mm2
140 NYM 3 x 2.5 mm2 + Conduit Dari MCB BOX GUESTROOM m 5.00 (5.00)
A-1 ke IU-L3.1
141 NYM 3 x 2.5 mm2 + Conduit Dari MCB BOX GUESTROOM m 7.00
A-1 ke EF-L3.1
143 NYM 3 x 2.5 mm2 + Conduit Dari MCB BOX GUESTROOM m 5.00 (5.00)
A-2 ke IU-L3.2
144 NYM 3 x 2.5 mm2 + Conduit Dari MCB BOX GUESTROOM m 6.00
A-2 ke EF-L3.2
146 NYM 3 x 2.5 mm2 + Conduit Dari MCB BOX GUESTROOM m 5.00 (5.00)
A-3 ke IU-L3.3
147 NYM 3 x 2.5 mm2 + Conduit Dari MCB BOX GUESTROOM m 6.00
A-3 ke EF-L3.3
149 NYM 3 x 2.5 mm2 + Conduit Dari MCB BOX GUESTROOM m 5.00 (5.00)
A-4 ke IU-L3.4
150 NYM 3 x 2.5 mm2 + Conduit Dari MCB BOX GUESTROOM m 6.00
A-4 ke EF-L3.4
152 NYM 3 x 2.5 mm2 + Conduit Dari MCB BOX GUESTROOM m 5.00 (5.00)
A-5 ke IU-L3.5
153 NYM 3 x 2.5 mm2 + Conduit Dari MCB BOX GUESTROOM m 6.00
A-5 ke EF-L3.5
155 NYM 3 x 2.5 mm2 + Conduit Dari MCB BOX GUESTROOM m 5.00 (5.00)
A-6 ke IU-L3.6
156 NYM 3 x 2.5 mm2 + Conduit Dari MCB BOX GUESTROOM m 6.00
A-6 ke EF-L3.6
159 NYM 3 x 2.5 mm2 + Conduit Dari MCB BOX GUESTROOM m 6.00
A-7 ke EF-L3.7
161 NYM 3 x 2.5 mm2 + Conduit Dari MCB BOX GUESTROOM m 5.00 (5.00)
A-87 ke IU-L3.8
162 NYM 3 x 2.5 mm2 + Conduit Dari MCB BOX GUESTROOM m 6.00
A-87 ke EF-L3.8
164 NYM 3 x 2.5 mm2 + Conduit Dari MCB BOX GUESTROOM m 5.00 (5.00)
A-9 ke IU-L3.9
165 NYM 3 x 2.5 mm2 + Conduit Dari MCB BOX GUESTROOM m 6.00
A-9 ke EF-L3.9
167 NYM 3 x 2.5 mm2 + Conduit Dari MCB BOX GUESTROOM m 5.00 (5.00)
A-10 ke IU-L3.10
168 NYM 3 x 2.5 mm2 + Conduit Dari MCB BOX GUESTROOM m 6.00
A-10 ke EF-L3.10
170 NYM 3 x 2.5 mm2 + Conduit Dari MCB BOX GUESTROOM m 5.00 (5.00)
A-11 ke IU-L3.11
171 NYM 3 x 2.5 mm2 + Conduit Dari MCB BOX GUESTROOM m 6.00
A-11 ke EF-L3.11
Lantai 5
172 NYY 4 x 10 mm2 + BC 6 Dari SDB ke PP-LANTAI 5 m 41.00
mm2
175 NYM 3 x 2.5 mm2 + Conduit Dari MCB BOX GUESTROOM m 5.00 (5.00)
A-1 ke IU-L5.1
176 NYM 3 x 2.5 mm2 + Conduit Dari MCB BOX GUESTROOM m 7.00
A-1 ke EF-L5.1
178 NYM 3 x 2.5 mm2 + Conduit Dari MCB BOX GUESTROOM m 5.00 (5.00)
A-2 ke IU-L5.2
179 NYM 3 x 2.5 mm2 + Conduit Dari MCB BOX GUESTROOM m 6.00
A-2 ke EF-L5.2
181 NYM 3 x 2.5 mm2 + Conduit Dari MCB BOX GUESTROOM m 5.00 (5.00)
A-3 ke IU-L5.3
NO. URAIAN PEKERJAAN KETERANGAN SATUAN QTY QTY (+/-
)
NYM 3 x 2.5 mm2 + Conduit Dari PP-LANTAI 5 ke MCB AC m 18.00
BOX GUESTROOM A-3
182 NYM 3 x 2.5 mm2 + Conduit Dari MCB BOX GUESTROOM m 6.00
A-3 ke EF-L5.3
184 NYM 3 x 2.5 mm2 + Conduit Dari MCB BOX GUESTROOM m 5.00 (5.00)
A-4 ke IU-L5.4
185 NYM 3 x 2.5 mm2 + Conduit Dari MCB BOX GUESTROOM m 6.00
A-4 ke EF-L5.4
187 NYM 3 x 2.5 mm2 + Conduit Dari MCB BOX GUESTROOM m 5.00 (5.00)
A-5 ke IU-L5.5
188 NYM 3 x 2.5 mm2 + Conduit Dari MCB BOX GUESTROOM m 6.00
A-5 ke EF-L5.5
190 NYM 3 x 2.5 mm2 + Conduit Dari MCB BOX GUESTROOM m 5.00 (5.00)
A-6 ke IU-L5.6
191 NYM 3 x 2.5 mm2 + Conduit Dari MCB BOX GUESTROOM m 6.00
A-6 ke EF-L5.6
193 NYM 3 x 2.5 mm2 + Conduit Dari MCB BOX GUESTROOM m 5.00 (5.00)
A-7 ke IU-L5.7
194 NYM 3 x 2.5 mm2 + Conduit Dari MCB BOX GUESTROOM m 6.00
A-7 ke EF-L5.7
196 NYM 3 x 2.5 mm2 + Conduit Dari MCB BOX GUESTROOM m 5.00 (5.00)
A-87 ke IU-L5.8
197 NYM 3 x 2.5 mm2 + Conduit Dari MCB BOX GUESTROOM m 6.00
A-87 ke EF-L5.8
199 NYM 3 x 2.5 mm2 + Conduit Dari MCB BOX GUESTROOM m 5.00 (5.00)
A-9 ke IU-L5.9
200 NYM 3 x 2.5 mm2 + Conduit Dari MCB BOX GUESTROOM m 6.00
A-9 ke EF-L5.9
202 NYM 3 x 2.5 mm2 + Conduit Dari MCB BOX GUESTROOM m 5.00 (5.00)
A-10 ke IU-L5.10
203 NYM 3 x 2.5 mm2 + Conduit Dari MCB BOX GUESTROOM m 6.00
A-10 ke EF-L5.10
205 NYM 3 x 2.5 mm2 + Conduit Dari MCB BOX GUESTROOM m 5.00 (5.00)
A-11 ke IU-L5.11
Lantai 6
207 NYY 4 x 4 mm2 + BC 4 mm2 Dari SDB ke PP-LANTAI 6 m 42.00 (42.00)
Lantai 7
208 NYY 4 x 10 mm2 + BC 6 Dari SDB ke PP- LIFT PENUMPANG m 46.00
mm2
209 NYY 4 x 25 mm2 + BC 16 Dari PP- LIFT PENUMPANG ke P. CTR-LIFT m 7.00 (7.00)
mm2
TL 2 x 18 W, TIPE TKI M5
223 Idem Lantai Ground Floor bh 4.00 (4.00)
224 Idem Lantai Mezzanine Provisional bh 20.00 (20.00)
SPOTLIGHT LED 50 W
229 Idem Lantai Ground Floor bh 10.00 (10.00)
Idem Lantai Ground Floor bh
Lantai 1 bh 8.00
Lantai 5 bh
SCRABLE LED 2 x 18 W
NO. URAIAN PEKERJAAN KETERANGAN SATUAN QTY QTY (+/-
)
239 Idem Lantai Ground Floor bh 4.00 (4.00)
LAMPU EXIT
idem Lantai 1 bh 1.00
idem Lantai 2 bh 1.00
idem Lantai 3 bh 1.00
idem Lantai 5 bh 1.00
TOTAL LAMPU
Stop Kontak
266 Idem Lantai Basement bh 3.00 (3.00)
267 Idem Lantai Ground Floor bh 25.00 (25.00)
268 Idem Lantai 1 bh 6.00 (6.00)
269 Idem Lantai 2 bh 6.00 (6.00)
270 Idem Lantai 3 bh 6.00 (6.00)
271 Idem Lantai 5 bh 6.00 (6.00)
272 Idem Lantai 6 bh 2.00 (2.00)
273 Idem Lantai 7 bh 2.00 (2.00)
Unit Guestroom 2
291 DOWN LIGHT, LED 14 W bh 4.00 (4.00)
Lantai 2
Unit Guestroom 1
Kamar Typikal ( kamar 1,2,3,4,5,6,7,8,9,10 dan 11 ) Sudah untuk 11 Unit
306 DOWN LIGHT, LED 14 W bh 33.00 (33.00)
307 LAMPU SOROT LED 5 W bh 88.00 (88.00)
308 LAMPU BACA …. W Provisional bh 22.00 (22.00)
309 INDIRCT STRIP LED 13 W/ METER m 66.00 (66.00)
310 Key Tag bh 11.00 (11.00)
311 Saklar Tunggal, 10A bh 33.00 (33.00)
312 Saklar Ganda, 10A bh 22.00 (22.00)
313 Saklar Dua Arah, 10A bh 22.00 (22.00)
314 Stop Kontak Multi, 800 AFF bh 22.00 (22.00)
315 Stop Kontak TV, 1200 AFF bh 11.00 (11.00)
316 Stop Kontak Coffe Maker, 800 AFF bh 11.00 (11.00)
NO. URAIAN PEKERJAAN KETERANGAN SATUAN QTY QTY (+/-
)
317 Stop Kontak Nakas, 600 AFF bh 22.00 (22.00)
318 Stop Kontak Sever, 700 AFF bh 11.00 (11.00)
319 Stop Kontak (LAMPU STANDING) Provisional bh 11.00 (11.00)
320 Stop Kontak International Provisional bh 11.00 (11.00)
Lantai 3
Unit Guestroom 1
Kamar Typikal ( kamar 1,2,3,4,5,6,7,8,9,10 dan 11 ) Sudah untuk 11 Unit
321 DOWN LIGHT, LED 14 W bh 33.00 (33.00)
322 LAMPU SOROT LED 5 W bh 88.00 (88.00)
323 LAMPU BACA …. W Provisional bh 22.00 (22.00)
324 INDIRCT STRIP LED 13 W/ METER m 66.00 (66.00)
325 Key Tag bh 11.00 (11.00)
326 Saklar Tunggal, 10A bh 33.00 (33.00)
327 Saklar Ganda, 10A bh 22.00 (22.00)
328 Saklar Dua Arah, 10A bh 22.00 (22.00)
329 Stop Kontak Multi, 800 AFF bh 22.00 (22.00)
330 Stop Kontak TV, 1200 AFF bh 11.00 (11.00)
331 Stop Kontak Coffe Maker, 800 AFF bh 11.00 (11.00)
332 Stop Kontak Nakas, 600 AFF bh 22.00 (22.00)
333 Stop Kontak Sever, 700 AFF bh 11.00 (11.00)
334 Stop Kontak (LAMPU STANDING) Provisional bh 11.00 (11.00)
335 Stop Kontak International Provisional bh 11.00 (11.00)
Lantai 5
Unit Guestroom 1
Kamar Typikal ( kamar 1,2,3,4,5,6,7,8,9,10 dan 11 ) Sudah untuk 11 Unit
336 DOWN LIGHT, LED 14 W bh 33.00 (33.00)
337 LAMPU SOROT LED 5 W bh 88.00 (88.00)
338 LAMPU BACA …. W Provisional bh 22.00 (22.00)
339 INDIRCT STRIP LED 13 W/ METER m 66.00 (66.00)
340 Key Tag bh 11.00 (11.00)
341 Saklar Tunggal, 10A bh 33.00 (33.00)
342 Saklar Ganda, 10A bh 22.00 (22.00)
343 Saklar Dua Arah, 10A bh 22.00 (22.00)
344 Stop Kontak Multi, 800 AFF bh 22.00 (22.00)
345 Stop Kontak TV, 1200 AFF bh 11.00 (11.00)
346 Stop Kontak Coffe Maker, 800 AFF bh 11.00 (11.00)
347 Stop Kontak Nakas, 600 AFF bh 22.00 (22.00)
348 Stop Kontak Sever, 700 AFF bh 11.00 (11.00)
349 Stop Kontak (LAMPU STANDING) Provisional bh 11.00 (11.00)
350 Stop Kontak International Provisional bh 11.00 (11.00)
TOTAL KAMAR
PENJUMLAHAN
DAFTAR NO. 5.1 - PERALATAN UTAMA
DAFTAR NO. 5.2 - KABEL UTAMA
DAFTAR NO. 5.3 - PANEL
DAFTAR NO. 5.4 - KABEL FEEDER