You are on page 1of 31

TERM PROJECT- SALAH 


PRAYER TIME SCHEDULE 
Embedded System Design 

Md.Dedarul Hasan 
PG.Dip in ICT. 
IICT,BUET. 
Reg ID: 0417311011,April-17. 
 
Dedicated To Honorable Prof.Dr.Liakot Ali Sir 

 

 
INDEX 
 
 

SL  TITLE  PAGE 

01  Introduction  03 

02  Requirement & Tools  04 

03  Schematic Design With Proteus  05 

04  Schematic Design & Simulation With Proteus   07 

05  Embedded C Code With Code Vision AVR & Compilation  09 

06  5V power Supply Circuit With Proteus & PCB Design With Eagle  13 
Cad -Top & Bottom Layer 

07  Lackings & Future Implementations  17 

08     

09     

10     

2   

INTRODUCTION 

Class Final Term Project: Digital Watch For Mosque 

❖ Schematic Design 

❖ C Code 

❖ Simulations 

❖ PCB design 

❖ Report 

Features : 

❖ Watch 

❖ Prayer Time Schedule 

❖ Temperature 

❖ Calendar/Date 

----------------------------------------- 

PRAYER TIME SCHEDULE: 

FAZAR0 5:06 AM 

JOHOR 01:12 PM 

ASOR 04:45 PM 

MAGRIB 06:00 PM 

ESHA 08:12 PM 

---------------------------------------- 

3   

REQUIREMENT & TOOLS 

COMPONENTS: 

❖ ATmega32 
❖ 7 Segment 
❖ 74LS248 SHIFT REGISTER 
❖ 4514 BCD Decoder 
❖ DS1307 I2C RTC 
❖ Temperature Sensor 
❖ VoltMeter DC 
❖ LCD DISPLAY 
❖ LED-RED 
❖ CRYSTAL 
❖ RESISTOR 
❖ POWER SUPPLY 
❖ GROUND 

Tools: 

❖ Proteus [For Schematic & Simulations] 


❖ Code Vision AVR [For C Code Compilation] 
❖ Eagle Cad [For PCB Design] 

4   

SCHEMATIC DESIGN 

PRAYER TIME SCHEDULE SCHEMATIC DESIGN: 

5   

DATE TIME SHOWING SCHEMATIC DESIGN: 

6   

SIMULATIONS 

PRAYER TIME SCHEDULE WITH TEMPERATURE, DATE & REAL TIME SHOWING 
SIMULATIONS : 

7   

TIME SHOWING SIMULATION: 

   

8   

PRAYER TIME SCHEDULE WITH DATE, TIME & TEMPERATURE SHOWING CODES 

9   
10 

   

10   
11 

DATE TIME SHOWING CODE: 

11   
12 

12   
13 

5 VOLT POWER SUPPLY SCHEMATIC DESIGN & SIMULATION USING PROTEUS 

13   
14 

5 VOLT POWER SUPPLY CIRCUIT USING EAGLE 

14   
15 

5 VOLT POWER SUPPLY PCB DESIGN : 

PCB PRINTED TOP LAYER : 

   

15   
16 

PCB PRINTED BOTTOM LAYER : 

   

16   
17 

LACKINGS & FUTURE IMPLEMENTATION   

In our project we weren't able to reduce the port less utilization to obtain the low cost 
prayer time showing & we are hopeful to solve that with the future implementation by 
that reference with schematic design & codes. 

References All: 

1.http://lib.buet.ac.bd:8080/xmlui/bitstream/handle/123456789/2863/Full%20Thesis.pdf?s
equence=1&isAllowed=y&fbclid=IwAR2YOx9uolQ_ou6L7M2pCF91q0xtl_-fOYkiNafuXsf_s5
GsWBAEVnxv6-8 

2.  

17   
18 

FUTURE IMPLEMENTATION CODES 

18   
19 

19   
20 

20   
21 

21   
22 

22   
23 

23   
24 

24   
25 

25   
26 

26   
27 

27   
28 

28   
29 

29   
30 

30   
31 

31   

You might also like