You are on page 1of 6

ANEXO G1-2,5

Pozo Nº1 2,50mts profundidad


Peso Muestra 2 15628 gr %visual 0%
Pc 1178 gr
Pa 4333 gr
f(factor de correccion)=pa/pc 3.68 Muestra 1
Tamiz Nº: Aberturas (mm) Ordenadas Curva A Curva B Curva C Peso Peso tamiz + Ret.Parcial %Retenido %Ret. %Pasa
tamiz(gr) Retenido (gr) Acumulado
Piedra fuera de tamiz 182 0 0.00 0.00 100.00
3" 76.2 7.03 511 2611 2100 13.44 13.44 86.56
2" 50.8 5.86 478 2766 2288 14.64 28.08 71.92
1 1/2" 38.1 5.15 476 1689 1213 7.76 35.84 64.16
1" 25.4 4.29 100.00 100.00 100.00 536 2593 2057 13.16 49.00 51.00
3/4" 19.05 3.77 100.00 100.00 100 634 1481 847 5.42 54.42 45.58
1/2" 12.7 3.14 95.00 100.00 100 607 1753 1146 7.33 61.75 38.25
3/8" 9.525 2.76 80.00 100.00 100 589 961 372 2.38 64.13 35.87
4 4.76 2.02 50.00 85.00 100 535 1807 1272 8.14 72.27 27.73
10 2 1.37 25.00 60.00 95 461 749 1059.34 6.78 79.05 20.95
40 0.42 0.68 10.00 30.00 50 428 957 1945.80 12.45 91.50 8.50
100 0.15 0.43 2.00 10.00 10 414 661 908.53 5.81 97.32 2.68
200 0.075 0.31 0.00 0.00 0 393 487 345.76 2.21 99.53 0.47
Fondo 0 0 0 0 0 361 381 73.57 0.47 100.00 0.00
D60= 1.048 total 15628.00 100.00000
D30= 0.409
D10= 0.159
Coeficiente de Curvatura Cc= (D30^2)/D10*D60= 1.0039
Coeficiente de Uniformidad Cu=D60/D10= 6.5912

Chart Title

Pozo 1 (2,5m) Pozo 2 (2,5m)


100.00

90.00

80.00

70.00

60.00

50.00

40.00

30.00

20.00

10.00

0.00
0.01 0.1 1 10 100
ANEXO G2-2,5

Pozo Nº2 2,50mts profundidad


Peso Muestra 2 9216 gr %visual 0%
Muestra 1

Peso Peso tamiz Ret.Parcial %Ret.


Tamiz Nº: Aberturas (mm) Ordenadas Curva A Curva B Curva C tamiz(gr) + Retenido (gr) %Retenido Acumulado %Pasa

Piedra fuera de tamiz 150.6 0 0.00 0.00 100.00


3" 76.2 7.03 511 2038 22.11 22.11 77.89
2" 50.8 5.86 478 1593 17.29 39.40 60.60
1 1/2" 38.1 5.15 476 905 9.82 49.22 50.78
1" 25.4 4.29 100.00 100.00 100.00 536 1287 13.96 63.18 36.82
3/4" 19.05 3.77 100.00 100.00 100 634 395 4.29 67.47 32.53
1/2" 12.7 3.14 95.00 100.00 100 607 679 7.37 74.84 25.16
3/8" 9.525 2.76 80.00 100.00 100 589 209 2.27 77.11 22.89
4 4.76 2.02 50.00 85.00 100 535 842 9.14 86.24 13.76
10 2 1.37 25.00 60.00 95 461 1119 658 7.14 93.38 6.62
40 0.42 0.68 10.00 30.00 50 428 895 467 5.07 98.45 1.55
100 0.15 0.43 2.00 10.00 10 414 496 82 0.89 99.34 0.66
200 0.075 0.31 0.00 0.00 0 393 433 40 0.43 99.77 0.23
Fondo 0 0 0 0 0 361 382 21 0.23 100.00 0.00
D60= 1.048 total 9216
D30= 0.409
D10= 0.159
Coeficiente de Curvatura Cc= (D30^2)/D10*D60= 1.0039
Coeficiente de Uniformida Cu=D60/D10= 6.5912

Pozo 2 (2,5m)
Pozo 2 (2,5m)

100.00

90.00

80.00

70.00

60.00

50.00

40.00

30.00

20.00

10.00

0.00
0.01 0.1 1 10 100
ANEXO G1-1,5

Pozo Nº1 1,50mts profundidad


Peso Muestra 2 18559 gr %visual 0%
Pc 800 gr
Pa 3501 gr
f(factor de correccion)=pa/pc 4.38 Muestra 1
Tamiz Nº: Aberturas Ordenadas Curva A Curva B Curva C Peso Peso tamiz + Ret.Parcial %Retenido %Ret. %Pasa
(mm) tamiz(gr) Retenido (gr) Acumulado
Piedra fuera de tamiz 147.7 0 0.00 0.00 100.00
3" 76.2 7.03 511 2134 11.50 11.50 88.50
2" 50.8 5.86 478 4400 23.71 35.21 64.79
1 1/2" 38.1 5.15 476 1504 8.10 43.31 56.69
1" 25.4 4.29 100.00 100.00 100.00 536 2220 11.96 55.27 44.73
3/4" 19.05 3.77 100.00 100.00 100 633 1373 1373 7.40 62.67 37.33
1/2" 12.7 3.14 95.00 100.00 100 605 1528 1528 8.23 70.90 29.10
3/8" 9.525 2.76 80.00 100.00 100 589 835 835 4.50 75.40 24.60
4 4.76 2.02 50.00 85.00 100 1064 1064 5.73 81.14 18.86
10 2 1.37 25.00 60.00 95 461 591 568.91 3.07 84.20 15.80
40 0.42 0.68 10.00 30.00 50 428 721 1282.24 6.91 91.11 8.89
100 0.15 0.43 2.00 10.00 10 414 648 1024.04 5.52 96.63 3.37
200 0.075 0.31 0.00 0.00 0 393 508 503.27 2.71 99.34 0.66
Fondo 0 0 0 0 0 361 389 122.54 0.66 100.00 0.00
D60= 1.048 total 18559.00 100.0000
D30= 0.409
D10= 0.159
Coeficiente de Curvatura Cc= (D30^2) 1.0039
Coeficiente de Uniformidad Cu=D60/D10= 6.5912

Chart Title
Pozo 1 (1,5m) Pozo 2 (1,5m)

100.00

90.00

80.00

70.00

60.00

50.00

40.00

30.00

20.00

10.00

0.00
0.01 0.1 1 10 100
ANEXO G2-1,5

Pozo Nº2 1,50mts profundidad


Peso Muestra 2 10458 gr %visual 0%
Pc 1015 gr
Pa 1323 gr
f(factor de correccion)=pa/pc 1.30 Muestra 1
Tamiz Nº: Aberturas Ordenadas Curva A Curva B Curva C Peso Peso tamiz + Ret.Parcial %Retenido %Ret. %Pasa
(mm) tamiz(gr) Retenido (gr) Acumulado
Piedra fuera de tamiz 143.5 0 0.00 0.00 100.00
3" 76.2 7.03 511 997 9.53 9.53 90.47
2" 50.8 5.86 478 2694 25.76 35.29 64.71
1 1/2" 38.1 5.15 476 1494 14.29 49.58 50.42
1" 25.4 4.29 100.00 100.00 100.00 536 1561 14.93 64.51 35.49
3/4" 19.05 3.77 100.00 100.00 100 634 720 6.88 71.39 28.61
1/2" 12.7 3.14 95.00 100.00 100 607 728 6.96 78.35 21.65
3/8" 9.525 2.76 80.00 100.00 100 589 234 2.24 80.59 19.41
4 4.76 2.02 50.00 85.00 100 534 1241 707 6.76 87.35 12.65
10 2 1.37 25.00 60.00 95 459 704 319.34 3.05 90.40 9.60
40 0.42 0.68 10.00 30.00 50 427 744 413.19 3.95 94.35 5.65
100 0.15 0.43 2.00 10.00 10 413 644 301.10 2.88 97.23 2.77
200 0.075 0.31 0.00 0.00 0 391 528 178.57 1.71 98.94 1.06
Fondo 0 0 0 0 0 360 447 113.40 1.08 100.02 -0.02
D60= 1.048 total 10460.61 100.02
D30= 0.409
D10= 0.159
Coeficiente de Curvatura Cc= (D30^2) 1.0039
Coeficiente de Uniformidad Cu=D60/D10= 6.5912

Pozo 2 (1,5m)
Pozo 2 (1,5m)

100.00

90.00

80.00

70.00

60.00

50.00

40.00

30.00

20.00

10.00

0.00
0.01 0.1 1 10 100
ANEXO H

Profundidad Peso Pesafiltro Pesafiltro + M. Pesafiltro + M. Humedad


Muestra
(mts) (gr) Húmeda (gr) Seca (gr) (%)
A 2.5 25.65 122.36 114.97 8.27%
8.19%
B 2.5 27.72 141.71 133.16 8.11%
Pozo 1
C 1.5 29.67 142.12 134.48 7.29%
D Superficial 29.27 140.04 133.95 5.82%
A 2.5 27.34 147.87 139.22 7.73%
7.64%
B 2.5 29 150.79 142.24 7.55%
Pozo 2
C 1.5 28.21 120.42 114.32 7.08%
D Superficial 29.18 138.77 134.63 3.93%
Muestra E1 Superficial 28.06 162.5 134.14 26.73% Al lado cauce
Pozo 2
Muestra E2 Superficial 29.4 100.68 92.12 13.65% 1,5mts del cauce
Pozo 1 Muestra E3 Superficial 28.39 116.49 101.93 19.80%
ANEXO Pins

Peso especifico Real (in situ)


Altura Recipiente 19.3325 cm
Diametro Recipiente 15.715 cm
Área Volúmen Peso Muestra Peso Específico
Muestra Alturas (cm) Observación h d
(cm2) (cm3) (gr) (gr/m3)
10.55 Pozo 2 19.32 15.68
11.15 A 80 cm del Sobresaturado 19.29 15.68
E1 10.875 193.9629 1640.44116 3264 1.990
10.85 Cauce 26% humedad 19.37 15.74
10.95 19.35 15.76
14.55
14.65 A 150 cm del
E2 14.7875 193.9629 881.561347 1490 1.690
14.8 Pozo 2
15.15
8.5 A 40 cm del
9.5 Cauce y 4,75
E3 9.2 193.9629 1965.32901 3475 1.768
9.6 mts del Pozo
1
9.2

Peso especifico Real (laboratorio)


9.3
10.1 A 80 cm del
E1 9.825 193.9629 1844.1022 2428 1.317
9.6 Cauce
10.3

You might also like