You are on page 1of 1

MORNING REVIEW

PT. HASNUR RIUNG SINERGI - PT. AGM BLOK 3


KALIMANTAN SELATAN
Summary Production 14-Jan Weather Condition
PLAN ACTUAL ACH Monthly C-O Monthly Outlook Rain Remarks OB : Waiting Equipment : Tunggu DT karena DT BD dari Jam 6 sampai 16.00
Desc
Daily Weekly MTD Monthly Daily Weekly MTD Monthly Daily Weekly MTD Monthly Daily Monthly Avg Daily Monthly Ach Start End Duration Slipperry : Kurang Dozer 85 dan awal shift 1 slipperry area front HEX 446
W#3 W#3 17 31-Jan 14 31-Jan 00.00 00.00 00.00 Others Activity : HEX 446 general material blending dan HEX 430 penurunan
OB 4.745,94 31.940,59 76.980,25 - 1.365,00 9.147,50 58.358,00 - 29% 29% 76% #DIV/0! - - 4.168,43 129.221,29 #DIV/0! 00.00 00.00 00.00 material High Wall
COAL 1.940,28 10.241,39 26.843,60 - - - - - 0% 0% 0% #DIV/0! - - - - #DIV/0! 19.55 02.30 06.35
SR 2,45 3,12 2,87 #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! 00.00 00.00 00.00
Slippery Remarks COAL :
RAIN 5,53 27,66 71,92 0,00 6,58 41,01 62,02 0,00 119% 148% 86% #DIV/0! Start End Duration
SLIPPERY 1,66 8,30 21,58 0,00 2,83 21,07 30,70 0,00 171% 254% 142% #DIV/0! 00.00 09.09 09.09
RAINFALL 10,90 54,50 152,60 0,00 9,00 60,00 84,00 0,00 83% 110% 55% #DIV/0! 00.00 00.00 00.00
02.30 05.20 02.50
00.00 00.00 00.00

FLEET OB Plan Act


CN EGI PA UA WH Eff Pdty Prod Distance N Hauler PA UA Delay Idle-Rain Idle-Slipp WH Eff Pdty Prod Distance N Hauler
HEX 217 PC 200 - - 100% 5% 6,09 5,55 3,50 1,21 142,56 172,50 - SUMMARY WATERFLOW OB 14 JAN SUMMARY WATERFLOW COAL 14
HEX 430 EC-480-DL 94% 51% 11,53 150 1.730,22 100% 9% 7,00 6,58 3,50 2,18 258,49 563,50 - 0
HEX 446 SY 500 95% 52% 11,78 240 2.827,04 100% 19% 3,66 6,58 5,65 4,65 135,27 629,00 - 0
S.D. 14 JAN 2022 JAN S.D. 14 JAN 2022
- - - - - - - -
- - - - - - - -

526-

- 2.334

-
145-
TOTAL 2 95% 51% 23,31 195,471904 4.557,26 0,00 0 100% 17% 16,75 18,72 12,65 8,04 169,78 1.365,00 - 0

1.983
4.557

-1.529
FLEET COAL Plan Act
CN EGI PA UA WH Eff Pdty Prod Distance N Hauler PA UA Delay Idle-Rain Idle-Slipp WH Eff Pdty Prod Distance N Hauler

1.365
HEX 212 PC 200 100% 0% - - - - - - -
HEX 217 PC 200 100% 0% 6,09 5,55 3,50 - - - -

0
HEX 427 EC-480-DL 100% 0% - - - - - - - 0
HEX 430 EC-480-DL 100% 0% 7,00 6,58 3,50 - - - - 0
EX 235 PC 500 100% 0% - - - - - - - 0
HEX 446 SY 500 90% 51% 11,02 180 1.982,88 100% 0% 3,66 6,58 5,65 - - - - 0
- - - - - - -
TOTAL 1 1.982,88 #VALUE! 0% - - - - - - #DIV/0! 0

WASTE REMOVAL

HEX 430

Prod Pdty Plan Paretto Over Losstime HEX 430 Paretto Problem Prodty HEX 430
300

200 7 120% 2 120%


99% 100% 100% 100% 100% 100%
6 92% 100% 100%
100
5 79%
0 80% 80%
6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 0 1 2 3 4 5 4
60% 50% 60%
45%
3
WH OB Delay Idle BD WH CO WH GEN 40% 40%
1 2

1 20% 20%
0,5
0 0% 0 0%
Waiting Gen SLIPPERY RAIN Repair Road / Jalan Licin Jalan NO Remaks Operator General
0 Equipment Disposal Undulating Tranee Loading
6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 0 1 2 3 4 5 (slopping)

HEX 446

300
Prod Pdty Plan Paretto Over Losstime HEX 446 Paretto Problem Prodty HEX 446
5 120% 2 100% 100% 100% 100% 100% 120%
200
98% 100% 100%
96%
100 100%
4 85% 80%
0 80% 60%
6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 0 1 2 3 4 5 3
40%
60%
45% 20%
2
WH OB Delay Idle BD WH CO WH GEN 40% 0 0%
1
1
20%
0,5
0 0%
SLIPPERY Gen RAIN Repair Road Praying &
0 / Disposal Friday Pray
6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 0 1 2 3 4 5

COAL GETTING
HEX446
Paretto Over Losstime Fleet Paretto Problem Prodty OB
300
Prod Pdty Plan
OB
200 9,00 120% 2 120%
99% 100% 100% 100% 100%
8,00
100 90% 100% 100%
7,00
- 67% 80%
6,00 80%
6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 0 1 2 3 4 5 64%
5,00 1 60%
60% 33%
4,00 40%
WH COAL Delay Idle BD WH Gen+OB 37%
3,00 40%
1,0 20%
2,00
20% 0 0%
1,00
0,5
- 0%
#N/A Waiting SLIPPERY RAIN Repair Road
- Equipment / Disposal
6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 0 1 2 3 4 5

Paretto Wait Equipment OB


N FLEET RUNNING
N Fleet OB N Fleet COAL
4 7,00 101%
6,00
3 6,00 100%
2 5,00 99%
1
4,00 98%
-
3,00 97%
6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 0 1 2 3 4 5
2,00 96%
1,00 95%
0,17 0,08 - -
KESIAPAN HAULER - 94%
N Hauler OB N Hauler Req OB Tunggu DT : DT kurang Tunggu DT : menunggu Tunggu DT : P2H & Tunggu Unit Lain : Tunggu unit lain :
krn breakdown setting DT setelah unit overshift DT lama Evakuasi Unit lain evakuasi & instalasi
15
loader (Selain DT yang pompa, pipa, tower
10 breakdown/standby BD/amblas di area front) lamp
5 9 9 9 9 10 11 11 11 11 11 11 11 11 11 11 11 11 11
7 7 7 8 7 7
-
6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 0 1 2 3 4 5

WATERFLOW OB 14 JAN S.D. 14 JAN 2022 WATERFLOW COAL 14 JAN S.D. 14 JAN 2022
1.638

- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
-
- 1.248
4.557

1.983
536
-1.133

-
1.538
526
- 173
- 145

-
- 83
- 67
- 17
- 33
397-
67 -
33 -
33 -
33 -
17 -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -