API 653 - The "Who DAT?

"
Study online at quizlet.com/_38o3bc

1. Approve all proposed methods of design, Inspector 25. Perform tank settlement survey Experienced
materials WPS's, NDE, and testing OR Engineer Person
2. approve all repairs, alteration, and Inspector 26. Perform the external inspection Inspector
reconstruction work at completion of work OR Engineer
27. Perform the internal inspections Inspector
3. Approve all repairs, alterations, and Inspector
28. Perform the routine In service inspection Operator
reconstruction work at hold points OR Engineer
29. Provide general authorization for limited Inspector
4. Approve lap patch in critical zone if bottom Engineer
routine repairs
thickness is less than 0.100"
30. review and approve exempting a hydro after Engineer
5. Assure compentency of personnel Owner
a major repair or alteration AND Owner
performing CP surveys
31. Review and approve RBI assessments Inspector
6. Assure quality & completeness of in service Inspector
AND
NDE (robotics) exams AND NDE
Engineer
Guru
32. Review and approve the use of non-code Engineer
7. Authorize all alterations Engineer
specified lap patches on bottom
8. Authorize all reconstruction work Inspector
33. Review inspection findings and Owner
OR Engineer
recommendations
9. Authorize all repairs Inspector
34. Review the results of CP surveys Owner
OR Engineer
35. Review the use of preheat or controlled Engineer
10. Authorize FFS evaluation to exempt a hydro Owner
deposition welding in lieu of PWHT
after a major repair or alteration
36. Run hot tap machine Qualified
11. Concur in writing use Control Deposition Engineer
Operator
welding for materials of unknown toughness AND Owner
12. Conduct an RBI assessment RBI Guru
13. Designate inspection hold points for repairs, Inspector
alterations, and reconstructions
14. Determine internal interval based on RBI Owner
15. Determine internal interval based on tank Owner
bottom corrosion
16. Determine the extent of UT measurements on Owner
the shell
17. Ensure disposition of all recommended Owner
repairs and monitoring
18. Evaluate and accept NDE examination results Inspector
19. Evaluate deterioration on exsiting shell Engineer
material
20. In a corroded area, detemine the vertical Inspector
lines (L)
21. In a corroded area, find t2 (thinnest area Inspector
exclusive of pit)
22. Maintain tank records Owner
23. Overall respondsibility for compliance with Owner
API 653
24. Perform FFS evaluation to exempt a hydro Engineer
after a major repair or alteration