Total Questions: 80 Latest Version: 6.0 ‘You have assigned a budget to WBS elements within your project. What function can be used to check assigned values against the current budget? A. Easy Cost Planning 8. Availability control C. Cost forecast D. Results analysis Answer: B Which of the following statements apply to project versions? Note: There are 2 correct Answers to this, question. A. Project versions can be changed, B. Project versions are mandatory for Milestone Trend Analysis (MTA). C. Project versions can be created automatically based on user status. D. Manually created project versions always require a project version profile. Answer: AB You are using WBS elements and activities are NOT assigned. Which statements apply to the ‘maintenance of the actual start and finish? Note: There are 2 correct Answers to this question. ‘A. You can always maintain the actual start and finish date of a WBS element. 8. You can always maintain the actual start if the WBS element has the status “Released” or “Partially released’. C. You can only maintain the actual start of a WBS element ifthe finish date is not maintained . You can only maintain the actual finish if all lower-level WBS elements have an actual finish date and the status of the WAS element is “Released”, Visit us athtips:/www.certswarrior.com/exam/c_ts412_1909/ Answer: B D Cae You are using networks and external activities in your project. The purchase requisition has been created. What is the sequence for the following business transactions and documents? {A Vendor selection -> Purchase order handling -> Invoice receipt > Purchase order monitoring -> Goods receipt B. Credit limit check -> Acceptance of performed services -> Vendor selection -> Purchase order handling > Purchase order monitoring -> Goods receipt -> Invoice receipt . Vendor selection -> Purchase order creation -> Service entry sheet creation -> Service entry sheet approval . Vendor selection -> Purchase order handling -> Purchase order monitoring -> Goods receipt Answer: C What could be a reason to use expert mode in the valuation method for results analysis? ‘A. Valuation in different currencies B. Usage of different line IDs C. Assignments of different accounts for postings to financial accounting, D. Billing WBS elements belonging to different company codes Answer: C Question: 6 Which object is used to allocate the costs from a claim to the project structure? A.Claim 8. Network activity C. WBS element D. Internal order Answer: D Visit us athtips:/www.certswarrior.com/exam/c_ts412_1909/ ‘You want to assign milestones to WBS elements, For what can you use these milestones? Note: There are 2 correct Answers to this question. A. To start workflow tasks B. For trend analysis C. To transfer the actual date to the billing plan D. To set an actual finish date for WBS elements Answer: BC How can you update the degree of processing for an activity? A. By using results analysis B. By scheduling the activity . By confirming the activity D. By changing the activity Answer: C ‘A component is assigned to a network activity. What are the prerequisites to generate project stock reservations? Note: There are 3 correct Answers to this question. ‘A.A procurement indicator must be assigned to the activity. 8, The material master of the component must permit project stock management, CC. The network is assigned to a sales order item. D. The network activity is assigned to a WBS element. E, The Project Stock indicator is set in the project definition (non-valuated or valuated). Answer: ABE You want to determine the planned costs for an internally processed activity. Which data do you need? Note: There are 2 correct Answers to this question. A. Activity type B. Duration Visit us athtips:/www.certswarrior.com/exam/c_ts412_1909/ c. Work D. Profit center Answer: AC Which of the following is visible in the project planning board? Note: There are 2 correct Answers to this, question. A. Capacity requirements B. Maintenance orders assigned to an activity C. Project-relevant purchase orders D. Production orders assigned to WBS elements Answer: AB Where do you maintain the length of the project ID? A. Project profile B. Special characters C. Project type D. Project coding mask Answer: D How are earliest dates and latest dates of activities scheduled? ‘A Earliest dates are scheduled by backward scheduling, and latest dates by forward scheduling. 8. Earliest dates and latest dates are scheduled by forward scheduling, C. Earliest dates are scheduled by backward scheduling, and latest dates by copying the earliest dates. D. Earliest dates are scheduled by forward scheduling, and latest dates by backward scheduling. Answer: D Visit us athtips:/www.certswarrior.com/exam/c_ts412_1909/ How can you confirm the working hours of different work centers for a single activity? A. Enter direct activity allocation assigning multiple work centers. B. Assign multiple work centers to the activity. C. Enter multiple work centers within a single confirmation. D. Create multiple confirmations for the activity and use the appropriate work center for each confirmation. Answer: A How can you search in the structure overview based on the user status? Note: There are 2 correct, Answers to this question. A. By searching for the individual status B. By searching for the status profile C. By searching via status selection profile D. By searching via status combination code Answer: AB Where can you assign the user status profile for WBS elements? Note: There are 3 correct Answers to this question. A. In the operative WBS element B. In the project profile C. Inthe project version D. In the project definition of a standard WBS E.In the project type Answer: ABD Which objects can be used to specify settlement rules? Note: There are 2 correct Answers to this question. ‘A.WBS elements Visit us athtips:/www.certswarrior.com/exam/c_ts412_1909/ BB. Network header for activity-account-assigned networks C. Standard WBS elements . Network activity for activity-account-assigned networks Answer: AB Which object is relevant in assembly processing to create an assembly order for the SD document? A. Item category B. Requirement class C. Control key D. Project profile Answer: B ‘Your customer wants to use requirements grouping in SAP Project System. What are the prerequisites for requirements grouping of materials? Note: There are 2 correct Answers to this question. ‘A. The materials must allow sales order or project stock. B. The exact lot size procedure must be used. C. The procurement type of the material must be internal. D. An MRP group must be assigned. Answer: AD You are working with predefined project coding masks to create projects. Which of the following statements apply? Note: There are 2 correct Answers to this question. A. You can use an indicator to determine that only coded project numbers may be used within SAP Project System. B. You can only use numbers for a project coding mask definition, C. You can use the same coding mask for standard projects and operative projects. . You can shorten the project mask even when there are existing projects. Answer: AC Visit us athtips:/www.certswarrior.com/exam/c_ts412_1909/ ‘A customer needs to analyse the capacity requirements of their network activities. Which reports do you recommend? Note: There are 2 correct Answers to this question, A. Resource reports B. Cost element reports C. Structure information system reports D. Hierarchical reports Answer: C You plan an activity that starts on February 1 and finishes on February 28. For this activity, you want to define @ milestone for February 10 which should NOT be changed through scheduling. What do you recommend for milestone definition? A Enter 10 days as duration. B. Enter an offset of 10 days to the start date of the activity C. Enter February 10 as fixed date. D. Enter an offset of -18 days to the finish date of the activity Answer: C For which objects can billing plans be created? Note: There are 2 correct Answers to this question, A Sales order items 8. Milestones C. Project definition D. WBS elements Answer: AD Visit us athtips:/www.certswarrior.com/exam/c_ts412_1909/ ‘You want to establish costing for WBS. Costing should be easy to use and should not refer to cost elements. What method for costing do you use? A. Easy Cost Planning (ECP) for WBS B. Unit costing for WBS C. Detailed planning for WBS D. Planning of overall values Answer: D You are working with networks and WBS elements. Which of the following statements applies? A. You have to activate the operative indicator Account Assignment Element for WBS elements with activities. B. You have to maintain a network profile in the project profile. C. You can reassign an activity from one network to another. D. You can assign the network header to multiple WBS elements, Answer: CD You use networks and internal activities in your project. You have activated capacity requirements and notice that one work center is overloaded. You have no authorization to change the work center. How can you reduce the overload of the work center? Note: There are 2 correct Answers to this question. A. Trigger automatic capacity leveling inside the project planning board. B. Shift activities backward or forward on the time axis where more capacities are available. C. Maintain subordinate internal activity elements assigned to other work centers. D. Increase the capacities of the work center in the project planning board, Answer: AB You want to make sure that certain tasks must start on a given date, Where can you maintain constraints for start dates? A. Milestone Visit us athtips:/www.certswarrior.com/exam/c_ts412_1909/ B. Activity C. Activity element D. Network header Answer: B Your customer's projects are subject to recurring changes of date. The assembly activity has an earliest start date of February 10 and lasts until February 20. The customer wants to assign a material component so that this will be in stock 5 days in advance. Note: Every day is a working day. What do you recommend to set up the requirement date for the component? A. Set up the requirement date aligned with the activity start date and a negative offset of S days. B. Set up the requirement date aligned with the activity start date and an offset of S days. C. Set up the requirement date aligned with the activity finish date and an offset of 15 days. D. Set up the requirement date manually as February 5. Answer: B ‘The basic dates of subordinate WBS elements should be extrapolated without taking into account the basic dates of higher-level WBS elements, What planning method for basic dates do you use? A. Free planning. B. Bottom-up . Top-down D. Strict bottom-up Answer: B What are some of the advantages of using project simulations? Note: There are 3 correct Answers to this question. ‘A. Project simulations can be used to plan structures and costs. 8. Project simulations can create purchase requisitions. C. Project simulations can be created without using an operational project as a template, D. Project simulations allow posting of actual data. , Multiple project simulations can be used simultaneously. Visit us athtips:/www.certswarrior.com/exam/c_ts412_1909/ Answer: ACE You have activated the workflow for confirmation variances in SAP Project System. Who is the receiver of this workflow iter? {A The person responsible for the work center B. The person responsible for the network activity C. The MRP controller for the network D. The person responsible for the superior WBS element Answer: C Which statement is valid regarding networks? Note: There are 2 correct Answers to this question. A. Relationships can be used to connect activities of different networks. B. Material components can be assigned to activity elements. CA network activity can be assigned to several WBS elements. D. A network can be activity-account-assigned and header-account-assigned. Answer: AD Question: 33 What are valid procurement types for stock items? Note: There are 3 correct Answers to this question. A. Third-party order B. Preliminary purchase requisition for WBS element C. Purchase requisition and Reservation for WBS element D. Planned order E. Reservation for WBS element Answer: BCE Visit us athtips:/www.certswarrior.com/exam/c_ts412_1909/ You have created an internally-processed network activity, and assigned a work center and the work. ‘After saving, you discover that no planned costs are displayed in the cost element report for the activity. What could be the reason? Note: There are 3 correct Answers to this question. A. The Determine Costs indicator in the network header rules out planned cost calculation, BB. The activity output price for the activity type and cost center assigned to the work center is not maintained. CC. The formula for costing in the work center is incorrect. D. Integrated planning for the network is active. E. The duration is missing in the activity. Answer: ABE Which objects do you have to maintain to enable automatic assignment of material components to the project? Note: There are 2 correct Answers to this question. A. WBS element 8. BOM item CC. Material master D. Network activity Answer: B D How can you record external service activities with service master data? Note: There are 2 correct, Answers to this question. A. Confirm the network activity for external services. B. Confirm the activities in the Cross-Application Time Sheet (CATS). C. Post a goods receipt in the goods movement application (MIGO}. D. Create a service entry sheet. Answer: B D ‘You want to set up the field selection of the Cross-Application Time Sheet (CATS) in Customizing. Which influencing field do you use? Visit us athtips:/www.certswarrior.com/exam/c_ts412_1909/ A. Project profile B. Network profile C. Data entry profile D. Network type Answer: C A customer project must be finished at a given due date. The project consists of WBS elements and networks. What scheduling type do you use? A. Only capacity requirements, 8. Forward C.Current date D. Backward Answer: D Which of the following data can be maintained in a standard network? Note: There are 3 correct ‘Answers to this question A. Material components B. Basic dates for activities, C. Relationships D. Document information records E, Internally processed activities Answer: ACE ‘You want to create a reservation for a material component assigned to a network activity. However, after releasing and saving the activity, no reservation is created. What are some possible reasons for the missing reservation? Note: There are 2 correct Answers to this question. A. The material master is set to external procurement. 8. The indicator Reservation/Purchase Requisition indicator for the material component assigned to the activity is set to "never" . The availability check for material components indicates missing parts. Visit us athtips:/www.certswarrior.com/exam/c_ts412_1909/ D. The material is assigned to the activity as a non-stack material, Answer: BC Ese ett What are the prerequisites for delivering materials from the project? Note: There are 2 correct Answers to this question, {A.A shipping point is necessary. B. Asales order must be created in advance. C.Asold to party is necessary. A delivery document type must be configured. Answer: AC Which report can use user-specific layouts? A. Enhanced individual overview B. Hierarchical report C. Line item report D. Cost element report Answer: C You want to use billing for a customer project. Which customizing object controls the billing of sales order items? ‘A. Requirements type 8. Requirements class C. Item category D. Schedule line category Answer: C Visit us athtips:/www.certswarrior.com/exam/c_ts412_1909/ Where do you control whether a project stock is managed as valuated or non-valuated project stock? A.In the network activity B. In the WBS element C. Inthe material master D. In the project definition Answer: D Which of the following actions can transfer actual costs for external processing? Note: There are 2 correct Answers to this question, A. Saving a purchase order B. Saving a service entry sheet C. Saving a supplier invoice D. Saving a goods receipt Answer: B D CoH) ‘Which organizational structures are required for network activities? Note: There are 3 correct Answers to this question. ‘A. Company code 8, Sales organization c.Plant D. Controlling area E. Operating concern Answer: AC D CoH Which of the following apply to dynamic item processor (DIP)? Note: There are 3 correct Answers to this, question. A. Sales prices are maintained in the DIP profile. B. Usage of cost elements is mandatory. Visit us athtips:/www.certswarrior.com/exam/c_ts412_1909/ C. Sources can be based on line items. D. DIP s used to create a quotation. E, Material determination is mandatory. Answer: AC D What are the prerequisites for resource-related billing? Note: There are 2 correct Answers to this question. ‘A. An activity-account-assigned network that is assigned to a sales order item 8. Released WBS elements, activities, and/or activity elements C. Adynamic item processor (DIP) profile with the appropriate settings D. A header-account-assigned network that is assigned to a sales order item Answer: BC You used hierarchical revenue planning to plan revenues for WBS elements manually. The cost element report for planned revenues does nat show any revenues at all. What is the reason for this? A. The manual hierarchical revenue planning will be displayed only if expert mode is activated. B. Cost element reports can display costs but not revenues. The manual hierarchical revenue planning has no reference to cost elements. D. Cost element reports display integrated planning only. Answer: C You used reductions to reduce the scheduled duration of all internally-processed activities in your project. However, the duration did not changed after overall network scheduling, ‘What do you check? Note: There are 2 correct Answers to this question. A. Ifthe reduction strategy is set in each activity 8. If the maximum reduction level is less than 100 C. Ifthe appropriate reduction type is set in the parameters for network scheduling . If the reduction strategy is set in the network header Visit us athtips:/www.certswarrior.com/exam/c_ts412_1909/ Answer: CD ‘You have saved a network and activities with assigned material components. As soon as you release the network, you receive the errar message "Business transaction cannot be carried out". What could be the reason for this error message? A. Missing budget for material components B. Missing authorizations to release material components. C. Missing material availability D. Missing reservations for material components Answer: B What functionality can you perform with activity elements? A. Create relationships B. Assign wark centers and capacities, C. Schedule WBS elements D. Assign material Answer: A Ces ae You have assigned a material to a network activity and want to determine the requirement date related to this activity. What set of dates do you have to maintain? ‘A. Basic dates of the WAS B. Forecast dates of the WBS C. Basic dates of the network activity D. Actual dates of the network activity Answer: C Visit us athtips:/www.certswarrior.com/exam/c_ts412_1909/ What PP/DS master data is necessary for using PP/DS? Note: There are 2 correct Answers to this question A. Resource B. Material C. Location D. Production version Answer: AC Your customer has created networks with internal activities and generated capacity requirements, Now, they want to analyze the capacity requirements of their project. Which report do you recommend? A. Capacity load work center view B. Individual overview capacity requirements C. Structure overview D. Extended capacity evaluation E.None Answer: B Float time is calculated during scheduling. Which of the following statements about float time are correct? Note: There are 3 correct Answers to this question. A. The maximum size of a free float is as large as the total float of an act B. Float time can be negative. C. By default, critical activities have a float time, whichis less than or equal to zero. D. Activities with the time constraint "Must start on'" always have a negative float time. E, The float time of WBS elements is calculated by extrapolation, Answer: BCD Which planning method can prevent further rescheduling of activities? A. Workforce planning B. Capacity leveling Visit us athtips:/www.certswarrior.com/exam/c_ts412_1909/ C. Partial confirmation of activities D. Capacity requirements activation Answer: D In your project, you work with a network and external activities, You have created a purchase requisition. The corresponding purchase order is created as well. Now, you increase the quantity of the external activity. How does the system support this scenario? ‘A. The purchase order is updated automatically to match the new quantity while saving the project. 8. Aworkflow can be triggered to inform the purchasing group, C. The purchase order can be updated in Goods Receipt for Purchase Order (MIGO). D. The system automatically creates a new purchase requisition with the difference to the original quantity. Answer: B ‘An external component is assigned to a network activity. The delivery date for the purchase requisition depends on the dates of the network activity. What controls whether the delivery date is defined by the earliest or latest scheduled dates? A. The control key B. The scheduling parameters for the network C. The network profile D. The table of MRP controllers Answer: B Which sales documents can update planned revenues on WBS elements? Note: There are 2 correct, Answers to this question. A Sales order 8. Billing . Inquiry D. Quotation Visit us athtips:/www.certswarrior.com/exam/c_ts412_1909/ Answer: AD What is the reason for assigning billing plans in customer projects? A Billing plans are copied automatically to the sales order item. 8. Billing plans are used for revenue planning, C. Billing plans enable the billing process to be carried out, D. Billing plans are prerequisites for quotation creation. Answer: C Which orders or documents can be displayed in Project-Oriented Procurement (ProMan)? Note: There are 2 correct Answers to this question. A. Sales order items B. Purchase order items C. Reservations D. Internal orders Answer: BC What functions are available for period end closing in SAP Project System? Note: There are 3 correct, Answers to this question. A. Milestone trend analysis B. Progress analysis C. Confirmations D. Settlement E. Results analysis Answer: BDE Visit us athtips:/www.certswarrior.com/exam/c_ts412_1909/ In your logistics project, you want to carry out the internal project work as soon as possible. What do ‘you have to maintain in capacity requirements planning? A. Capacity planner group in the network header 8. Control key of an activity C. Scheduling and distribution key D. Scheduling and capacity category Answer: B ‘To which object can you assign a factory calendar? A. Milestone B. Network header C. Material component D. Relationship Answer: B Which of the following business processes do NOT lead to the booking of actual costs to an object? Note: There are 2 correct Answers to this question. ‘A. Recording of external services in the service entry sheet 8. Goods receipt into valuated project stock C. Goods receipt into unvaluated project stock D. Goods receipt of a non-stock item Answer: AC (et TeHL ee Which statements describe planned and actual revenue for WBS elements? Note: There are 2 correct, ‘Answers to this question, A. Planned revenue can be transferred from a sales quotation, 8. Actual revenue is posted via a billing document created from a sales order C. Planned revenue requires a sales order assigned to a WBS element. D. Actual revenue is posted via a billing plan assigned to a WBS element. Visit us athtips:/www.certswarrior.com/exam/c_ts412_1909/ Answer: AB ‘You want to allocate overhead rates to a WBS element. What must you assign to the WBS element? A. Investment profile B. Settlement rule C. Results analysis key D. Costing sheet Answer: D Question: 69 A service company uses project management and they complain that the system does not prevent their project managers from exceeding their budgets. What actions do you have to take to solve the problem? A. Activate availability control in the assigned budget profile. Define the tolerance limits in customizing. BB. Activate commitment management in the project definition. Enter the budget in the master data of the top WBS element. C. Activate availability control for the WBS elements. Define the tolerance limits on each WBS element, D. Activate availability control for projects in the controlling area. Enter the plan data for each WBS element. Answer: A When you create a service activity in your network, what data can be entered? Note: There are 3 correct, ‘Answers to this question, A. Service specification B. Material master within service specification Vendor D. Service purchase order number E, Overall limit (maximum value of all unplanned services) Answer: ACE Visit us athtips:/www.certswarrior.com/exam/c_ts412_1909/ Which sets of dates can be used to schedule networks? Note: There are 2 correct Answers to this question. A. Basic dates B. Forecast dates C. Baseline dates D. Planned dates, Answer: AB What are some of the possible functions in user status profiles? Note: this question. here are 2 correct Answers to A. Restrict setting user status for individual users. 8. Utilize priorities for setting the user status. C. Allow business processes forbidden by SAP system status, D. Ensure user status must always be set manually Answer: AB Question: 73 You want to use subnetworks during the project. Which of the following statements describes subnetworks? ‘A. Maintenance orders can be defined as subnetworks. 8, The scheduling type of a subnetwork is always copied from the superior network. C. Asubnetwork cannot be defined for a superior subnetwork. . Subnetworks must be scheduled separately from the superior network. Answer: A How can you grant individual authorization for WBS elements and networks? Visit us athtips:/www.certswarrior.com/exam/c_ts412_1909/ ‘A. Define a user status to lock the business transaction Update Project. B. Set the system status to "Lock Master Dat: C. Activate access control lists (ACL) for the user master record, D. Activate access control lists (ACL) for the project profile and the network profile. Answer: D ‘You are using budgeting and active availability control. How can availability control be activated? Note: ‘There are 2 correct Answers to this question. ‘A. Automatic activation with budget assignment B. Automatic activation with assignment to an investment program . Background activation (CJBV — Activate Availability Control) . Automatic activation with the first actual posting Answer: AC Where can you define a network as "header-account-assigned” or “activity-account-assigned"? A. Parameters for the network type B. Project profile C. Network profile D. Network type Answer: A Ce aed Budgeting is implemented for projects. The budget has been adjusted several times. What standard report type provides an overview of adjustments on the budget? ‘A. Structure overview for budgets B. Cost element report on budget updates C. Hierarchical report on budget updates D. Line item report for budgets Visit us athtips:/www.certswarrior.com/exam/c_ts412_1909/ Answer: D What business transactions can be used with Project-Oriented Procurement (ProMan}? Note: There are 3 correct Answers to this question. A. Generate purchase requisition B. Stock transfer posting C. Cancel goods issue D. Confirm production order E, Generate delivery Answer: ABE ‘The system status of a WBS element is created (CRTD). Which by element? ess process is allowed for this WBS A. Calculation of actual values 8. Creation of purchase orders C. Activity allocation D. Goods receipt for purchase orders Answer: B eS HEL) ‘Which of the following factors influence the scheduling of internal processing activities? Note: There are 3 correct Answers to this question. ‘A. Whether the work forthe internal activity is greater than its duration 8. The factory calendar in the work center used for the internal processing activity C. The relationships between activity elements D. An activated Scheduling indicator in the control key of the internal processing activity E.The unit (for example, hour, day) ofthe field Normal Duration field ofthe activity Answer: BCD Visit us athtips:/www.certswarrior.com/exam/c_ts412_1909/

You might also like