MEASUREMENT SHEET

S.no Description No's Unit Length Breadth Depth Quantity


10 EXCAVATE, EARTHWORK, UPTO 1.5 M
Dewaxing Building
Drain 1 Cum 35.000 0.700 0.600 14.700
1 Cum 35.000 0.700 0.600 14.700
Near Building 1 North side 1 Sq m 24.900 7.750 0.450 86.839
Near Building 2 North side 1 Sq m 11.930 4.450 0.800 42.471
old refinery tank foundatio 1 Dia-3.0m 0.450 3.200
fatrap 1 Cum 6.980 2.700 0.500 9.423
Deacidification Building 1 Cum 12.000 0.600 0.800 5.760
2 Cum 1.500 0.600 0.800 1.440
178.533 ok
20 EXCAVATE, EARTHWORK from 1.5m to 3.0m
Fatrap 1 Cum 6.980 2.700 0.500 9.423 ok

Total Cu M 9.423
30 BACKFILL, WITH AVAILABLE EARTH
Foundation 1 Cum 6.980 2.900 2.000 40.484
Deduction of pcc -1 Cum 6.980 2.900 0.100 -2.024
Deduction of raft -1 Cum 6.780 2.700 0.300 -5.492
Deduction of wall -1 Cum 6.480 2.400 2.000 -31.104
Total Cum 1.864 ok
70 PCC WORK 1:3:6
Fatrap 1 Cum 6.980 2.900 0.100 2.024
drain 2 Cum 35.000 0.600 0.075 3.150
Deacidification Building 1 Cum 12.000 0.400 0.100 0.480
2 Cum 1.500 0.400 0.100 0.120
1 Cum 12.000 1.500 0.100 1.800
Total Cu M 7.574 ok
80 RCC M30 up to plinth level
Fatrap
Raft 1 Cum 6.480 2.700 0.300 5.249
Main Long Wall 2 Cum 6.480 0.200 1.600 4.147
Main Short Wall 2 Cum 2.000 0.200 1.600 1.280
Main Long Wall 2 Cum 6.480 0.200 0.500 1.296
Main Short Wall 2 Cum 2.000 0.200 0.500 0.400
Buffal 3 Cum 1.700 0.150 1.550 1.186
Drain 2 Cum 35.000 0.150 0.600 6.300
side wall 4 Cum 35.000 0.350 0.150 7.350
building 1 and 2 Drain 1 Cum 28.425 0.300 0.120 1.023
3 Cum 16.120 0.300 0.120 1.741
1 Cum 11.550 0.300 0.120 0.416
1 Cum 13.800 0.300 0.120 0.497
1 Cum 6.500 0.300 0.120 0.234
Deacidification Building 1 Cum 12.000 0.400 0.100 0.480
2 Cum 1.500 0.400 0.100 0.120
1 Cum 12.000 1.500 0.100 1.800
Total Cum 33.519 ok
90 P/M/L OF RCC M30 GL TO +5.00M LVL
Crystalizer Tanks 2 Cu M (π(3.33𝑥3.33))/4 0.050 0.436
2 Cu M (π(3.83𝑥3.83))/4 0.050 0.576
2 Cu M 0.050 0.667
Mullion Columns 52 Cu M 0.200 0.200 2.575 5.356
Lintel Beam Windows 16 Cu M 2.200 0.200 0.300 2.112
Lintel Beam FD 2 Cu M 1.600 0.200 0.300 0.192
Lintel Beam DD 1 Cu M 1.900 0.200 0.300 0.114
Windows Chejja 16 Cu M 2.200 0.600 0.113 2.376
Chejja FD 2 Cu M 1.600 0.600 0.113 0.216
Chejja DD 1 Cu M 1.900 0.600 0.113 0.128
Coping 1 Cu M 29.250 0.200 0.200 1.170
1 Cu M 20.000 0.200 0.200 0.800
1 Cu M 27.200 0.200 0.200 1.088
1 Cu M 27.250 0.200 0.200 1.090
a Staircase at Old Refinery
Steps 15 CU M 1.250 0.230 0.085 0.37
Steps Bottom 1 CU M 4.300 1.250 0.150 0.81
b Tank Foundation at Old Refinery
Foundation1 CU M (π(3.0𝑥3.0)−(2.15𝑥2.15))/4
0.600 2.06
1 CU M π(3.0𝑥3.0)/4 0.250 1.77
Deductions of Pocket -8 CU M 0.200 0.200 0.400 -0.13
c Building -1 Tank Foundation
Columns 4 CU M 0.420 0.220 0.250 0.09
Total Cu M 21.288 ok
130 Form work up to plinth level
Raft 1 Sqm 17.760 0.300 5.328
Main Long Outer Side Wall 2 Sqm 6.480 1.550 20.088
Main Short Outer Side Wall 2 Sqm 2.400 1.550 7.440
Main Long Inner Side Wall 2 Sqm 6.080 1.550 18.848
Main Short Outer Side Wall 2 Sqm 2.000 1.550 6.200
Buffal 6 Sqm 1.700 1.550 15.810
3 Sqm 0.150 1.550 0.698
Deacidification Building 2 Sqm 12.000 0.400 0.450 4.320
4 Sqm 1.500 0.400 0.450 1.080
Drain 4 Sqm 35.000 0.500 70.000
4 Sqm 35.000 0.350 49.000
Total sqm 198.812 ok
140 Form work plinth level to +5.00m
Main Long Outer Side Wall 2 Sqm 6.480 0.500 6.480
Main Short Outer Side Wall 2 Sqm 2.400 0.500 2.400
Main Long Inner Side Wall 2 Sqm 6.080 0.500 6.080
Main Short Outer Side Wall 2 Sqm 2.000 0.500 2.000
Total sqm 16.960 ok
290 SPLY&LAY, FLOOR HARDENER
Grade Slab 1 Sq M 16.850 27.200 458.320
Deductions of Crystalizer Tanks -2 Sq M (π(3.833𝑥3.83))/4 -23.045
-2 Sq M (π(4.12𝑥4.12))/4 -26.667
Grade Slab -1 Sq M (π(2.75𝑥2.75))/4 -5.940
P1
P2 -1 Sq M 6.45 3.415 -22.027
-2 Sq M (π(2.815𝑥2.815))/4 -12.449
P3 -1 Sq M 1.3 2.3 -2.990
P4 -1 Sq M (π(1.76𝑥1.76))/4 -2.433
P5 -2 Sq M (π(1.56𝑥1.56))/4 -3.823
P6 -1 Sq M (π(2.71𝑥2.71))/4 -5.769
P7 -1 Sq M (π(1.9𝑥1.9))/4 -2.836
P8 -1 Sq M (π(1.8𝑥1.8))/4 -2.545
P9 -1 Sq M 2.71 1.42 -3.848
P10 -3 Sq M 0.300 0.400 -0.360
Extra 5KL tank foundation -4 Sq M 0.300 0.400 -0.480
Slope oil tank foundation -2 Sq M 3.100 0.500 -3.100
Dewaxing Building 1 Sq M 11.750 14.000 164.500
P1 Foundation -1 Sq M (π(4.0𝑥4.0))/4 -12.568
P2 Foundation -1 Sq M (π(2.9𝑥2.9))/4 -6.606
P3 Foundation -1 Sq M (π(4.9𝑥4.9))/4 -18.860
P4 Foundation -4 Sq M 1.1 2.1 -9.240
P5 Foundation -3 Sq M 1.01 1.3 -3.939
Total Sq M 453.295 ok
300 MISCELLANEOUS PLINTH PROTECTION
Dewaxing Building 1 Sq M 42.000 1.200 50.400
1 Sq M 32.000 1.200 38.400
1 Sq M 30.000 1.200 36.000
Control Panel Building 1 Sq M 11.250 1.200 13.500
1 Sq M 12.000 1.200 14.400
Deacidification Building 2 Sq M 14.150 1.200 16.980
2 Sq M 14.400 1.200 17.280
1 Sq M 14.400 1.200 17.280
Near Building 1 North side 1 Sq m 24.90 7.750 192.975
Near Building 2 North side 1 Sq m 11.93 4.450 53.089

Total Sq M 450.304 ok
310 12 mm thick johnson endura tile flooring
a Dewaxing Building
Grade Slab 1 Sq m 28.850 27.200 784.720
Deductions of Crystalizer Tanks -2 Sq m 3.33 Dia -8.710
-2 Sq m 3.833 Dia -11.540
-2 Sq m 4.12 Dia -13.333
Drain Side 2 Sq m 28.425 0.350 19.898
6 Sq m 16.120 0.350 33.852
P2 1 Sq m 19.73 0.3 5.919
2 Sq m 2.815 Dia 7.076
P3 1 Sq m 7.200 0.400 2.880
P4 1 Sq m 1.76 Dia 2.212
P5 2 Sq m 1.56 Dia 3.921
P6 1 Sq m 2.71 Dia 3.406
P7 1 Sq m 1.9 Dia 2.388
P8 4 Sq m 1.8 Dia 9.049
P9 1 Sq m 8.26 0.4 3.304
P10 3 Sq m 1.4 0.4 1.680
P10 3 Sq m 1.2 0.4 1.440
P11 1 Sq m 11.6 0.4 4.640
Extra 5KL tank foundation 4 Sq m 1.4 0.4 2.240
Slope oil tank foundation 2 Sq m 7.2 0.8 11.520
upcoming found 2 Sq m 15 1 30.000
2 Sq m 13 0.4 10.400
2 Sq m 4.5 0.4 3.600
SKIRTING 2 Sq m 28.850 0.300 17.310
2 Sq m 27.200 0.300 16.320
Crystalizer Tanks 2 Sq m 3.33 Dia 20.926
2 Sq m 3.833 Dia 24.087
2 Sq m 4.12 Dia 25.890
Control Panel 1 Sq m 9 12 108.000
SKIRTING 2 Sq m 9.000 0.300 5.400
2 Sq m 12.000 0.300 7.200
b Deacidification Building
Grade Slab 1 Sq m 11.750 14.000 164.500
Drain Side 2 Sq m 11.750 0.35 8.225
2 Sq m 14.000 0.35 9.800
2 Sq m 6.500 0.35 4.550
P1 1 Sq m 4 Dia 8.798
P2 2 Sq m 2.9Dia 12.757
P3 1 Sq m 4.9Dia 10.777
P4 4 Sq m 4 0.4 6.400
P5 3 Sq m 4.62 0.4 5.544
SKIRTING 2 Sq m 11.750 0.300 7.050
2 Sq m 14.000 0.300 8.400
Total Sq m 1382.493 ok
340 acrylic emulsion internal wall painting
Crystalizer Tanks 2 Sq M πx3.33 1.500 34.004
2 Sq M πx3.83 1.500 39.110
2 Sq M πx4.12 1.500 42.071
Total Sq M 115.186 ok
2 Grouting GP2
Building-1 chillers2 Cu m 1.300 0.250 0.040 0.026
4 Cu m 0.150 0.150 0.200 0.018
Building-2 chillers 4 Cu m 2.300 0.250 0.040 0.092
8 Cu m 0.150 0.150 0.200 0.036
Deck slab seperator found 1 Cu M 1.100 1.150 0.075 0.095
3 Cu M 0.900 1.150 0.075 0.233
old refinery 12 Cu M 0.200 0.200 0.250 0.120
Total Cu m 0.620 ok