KETERANGAN JML

FOOTPLAT 1
FP1 100 x 100 34 BH

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

12820

1017.5 900 900 900 600 900 900 642.5 500 642.5 900 900 600 900 900 717.5

FP1 FP1 FP1 FP1 FP1 FP1 FP1 FP1 FP1 FP1 FP1 FP1 FP1 FP1 FP1 FP1 FP1

KIOS KIOS KIOS KIOS KIOS KIOS KIOS KIOS KIOS KIOS KIOS KIOS KIOS KIOS KIOS KIOS KIOS KIOS KIOS KIOS KIOS KIOS KIOS KIOS KIOS KIOS KIOS KIOS KIOS KIOS KIOS KIOS KIOS KIOS KIOS KIOS
855

855
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36
( 1A ) ( 2A ) ( 3A ) ( 4A ) ( 5A ) ( 6A ) ( 7A ) ( 8A ) ( 9A ) ( 10A ) ( 1B ) ( 2B ) ( 3B ) ( 4B ) ( 5B ) ( 6B ) ( 7B ) ( 1C ) ( 2C ) ( 3C ) ( 1D ) ( 2D ) ( 3D ) ( 1E ) ( 2E ) ( 3E ) ( 4E ) ( 5E ) ( 6E ) ( 7E ) ( 1F ) ( 2F ) ( 3F ) ( 4F ) ( 5F ) ( 6F )
LORONG LORONG JALAN LORONG LORONG
I II UTAMA III IV

FP1 FP1 FP1 FP1 FP1 FP1 FP1 FP1 FP1 FP1 FP1 FP1 FP1 FP1 FP1 FP1 FP1

1017.5 900 900 900 600 900 900 642.5 500 642.5 900 900 600 900 900 717.5

12820

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

DENAH RENCANA FOOTPLAT

1 : 330
SELASAR SELASAR
±0.00 ±0.00

MUKA TANAH
±VARIAN

15
KOLOM 35 x 35

125
110
A
MUKA TANAH

165
150
TANAH URUG

32.5
D16 - 150

D16 - 150

10
100
35

40
D16 - 150

30
D16 - 150
D16 - 150
32.5

5 10
LANTAI KERJA t = 10cm

15
D16 - 150 PASIR URUG PADAT t = 5cm

32.5 35 32.5 32.5 35 32.5

100 100

DETAIL FOOTPLAT POTONGAN A

1 : 20 1 : 20
SCHEDULE KOLOM BETON
KETERANGAN KOLOM PEDESTAL FOOTPLAT 35 x 35

35
SKETSA

35

TULANGAN ATAS 4 D16

TULANGAN TENGAH 4 D16

TULANGAN BAWAH 4 D16

SENGKANG D10 - 100

SCHEDULE KOLOM BETON

1 : 10
KETERANGAN JML
KOLOM PIPA BAJA
K1 Ø4"
34 BH

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

12820

1017.5 900 900 900 600 900 900 642.5 500 642.5 900 900 600 900 900 717.5

K1 K1 K1 K1 K1 K1 K1 K1 K1 K1 K1 K1 K1 K1 K1 K1 K1

KIOS KIOS KIOS KIOS KIOS KIOS KIOS KIOS KIOS KIOS KIOS KIOS KIOS KIOS KIOS KIOS KIOS KIOS KIOS KIOS KIOS KIOS KIOS KIOS KIOS KIOS KIOS KIOS KIOS KIOS KIOS KIOS KIOS KIOS KIOS KIOS
855

855
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36
( 1A ) ( 2A ) ( 3A ) ( 4A ) ( 5A ) ( 6A ) ( 7A ) ( 8A ) ( 9A ) ( 10A ) ( 1B ) ( 2B ) ( 3B ) ( 4B ) ( 5B ) ( 6B ) ( 7B ) ( 1C ) ( 2C ) ( 3C ) ( 1D ) ( 2D ) ( 3D ) ( 1E ) ( 2E ) ( 3E ) ( 4E ) ( 5E ) ( 6E ) ( 7E ) ( 1F ) ( 2F ) ( 3F ) ( 4F ) ( 5F ) ( 6F )
LORONG LORONG JALAN LORONG LORONG
I II UTAMA III IV

K1 K1 K1 K1 K1 K1 K1 K1 K1 K1 K1 K1 K1 K1 K1 K1 K1

1017.5 900 900 900 600 900 900 642.5 500 642.5 900 900 600 900 900 717.5

12820

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

DENAH RENCANA KOLOM PIPA BAJA

1 : 330
KOLOM BAJA
PIPA Ø4"

35
BAUT ANGKUR
Ø16mm
JUMLAH 4 BH

BASEPLAT t = 10mm
SCHEDULE KOLOM BAJA
A A

35 KETERANGAN KOLOM BAJA K1

15

2.5 20 2.5

7.5

25
10
SKETSA

7.5
KOLOM PIPA BAJA
Ø4"

25
BAUT ANGKUR
Ø16mm
JUMLAH 4 BH

BASEPLAT t = 10mm

KOLOM PEDESTAL
FOOTPLAT
40

35cm x 35cm
KOLOM BAJA PIPA BAJA Ø4"

BASEPLAT PLAT TEBAL 10mm

ANGKUR 4 D16mm ~ 400mm

PLAT SIRIP -

35

DETAIL KOLOM BAJA K1 SCHEDULE KOLOM BAJA

1 : 10 1 : 10
KETERANGAN JML
KOLOM PIPA BAJA
K2 Ø4" ( MIRING ) 8 BH

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

12820

1017.5 900 900 900 600 900 900 642.5 500 642.5 900 900 600 900 900 717.5

KIOS KIOS KIOS KIOS KIOS KIOS KIOS KIOS KIOS KIOS KIOS KIOS KIOS KIOS KIOS KIOS KIOS KIOS KIOS KIOS KIOS KIOS KIOS KIOS KIOS KIOS KIOS KIOS KIOS KIOS KIOS KIOS KIOS KIOS KIOS KIOS
855

855
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36
( 1A ) ( 2A ) ( 3A ) ( 4A ) ( 5A ) ( 6A ) ( 7A ) ( 8A ) ( 9A ) ( 10A ) ( 1B ) ( 2B ) ( 3B ) ( 4B ) ( 5B ) ( 6B ) ( 7B ) ( 1C ) ( 2C ) ( 3C ) ( 1D ) ( 2D ) ( 3D ) ( 1E ) ( 2E ) ( 3E ) ( 4E ) ( 5E ) ( 6E ) ( 7E ) ( 1F ) ( 2F ) ( 3F ) ( 4F ) ( 5F ) ( 6F )
LORONG LORONG JALAN LORONG LORONG
I II UTAMA III IV
K2 K2 K2 K2 K2 K2 K2 K2

1017.5 900 900 900 600 900 900 642.5 500 642.5 900 900 600 900 900 717.5

12820

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

DENAH RENCANA KOLOM PIPA BAJA MIRING

1 : 330
15

PASANGAN ACP 20cm x 20cm

KOLOM PIPA BAJA KOLOM PIPA BAJA


Ø4" Ø4" ( MIRING )

PLAT SAMBUNG t = 10mm

50°
BAUT ANGKUR
Ø16mm
JUMLAH 4 BH

10
BASEPLAT t = 10mm
KOLOM PEDESTAL

15
SELASAR FOOTPLAT
±0.00 35cm x 35cm

VARIAN
40

MUKA TANAH
±VARIAN

35

DETAIL KOLOM PIPA BAJA MIRING K2

1 : 10
KETERANGAN
BALOK PIPA BAJA
B1 Ø4"

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

12820

1017.5 900 900 900 600 900 900 642.5 500 642.5 900 900 600 900 900 717.5

B1 B1 B1 B1 B1 B1 B1 B1 B1 B1 B1 B1 B1 B1 B1

KIOS KIOS KIOS KIOS KIOS KIOS KIOS KIOS KIOS KIOS KIOS KIOS KIOS KIOS KIOS KIOS KIOS KIOS KIOS KIOS KIOS KIOS KIOS KIOS KIOS KIOS KIOS KIOS KIOS KIOS KIOS KIOS KIOS KIOS KIOS KIOS
855

855
B1

B1
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36
( 1A ) ( 2A ) ( 3A ) ( 4A ) ( 5A ) ( 6A ) ( 7A ) ( 8A ) ( 9A ) ( 10A ) ( 1B ) ( 2B ) ( 3B ) ( 4B ) ( 5B ) ( 6B ) ( 7B ) ( 1C ) ( 2C ) ( 3C ) ( 1D ) ( 2D ) ( 3D ) ( 1E ) ( 2E ) ( 3E ) ( 4E ) ( 5E ) ( 6E ) ( 7E ) ( 1F ) ( 2F ) ( 3F ) ( 4F ) ( 5F ) ( 6F )
LORONG LORONG JALAN LORONG LORONG
I II UTAMA III IV
B1 B1 B1 B1 B1 B1 B1 B1 B1 B1 B1 B1 B1 B1 B1

1017.5 900 900 900 600 900 900 642.5 500 642.5 900 900 600 900 900 717.5

12820

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

DENAH RENCANA BALOK PIPA BAJA ELV +2.35 & ELV +3.75 DARI SELASAR

1 : 330
KETERANGAN
BALOK PIPA BAJA
B1 Ø4"

BALOK PIPA BAJA MENEMPEL


KE BANGUNAN KIOS

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

12820

1017.5 900 900 900 600 900 900 642.5 500 642.5 900 900 600 900 900 717.5

B1 B1 B1 B1 B1 B1 B1 B1 B1 B1 B1 B1 B1 B1 B1 B1 B1 B1 B1 B1 B1 B1 B1 B1 B1

KIOS KIOS KIOS KIOS KIOS KIOS KIOS KIOS KIOS KIOS KIOS KIOS KIOS KIOS KIOS KIOS KIOS KIOS KIOS KIOS KIOS KIOS KIOS KIOS KIOS KIOS KIOS KIOS KIOS KIOS KIOS KIOS KIOS KIOS KIOS KIOS
B1 B1
855

855
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36
( 1A ) ( 2A ) ( 3A ) ( 4A ) ( 5A ) ( 6A ) ( 7A ) ( 8A ) ( 9A ) ( 10A ) ( 1B ) ( 2B ) ( 3B ) ( 4B ) ( 5B ) ( 6B ) ( 7B ) ( 1C ) ( 2C ) ( 3C ) ( 1D ) ( 2D ) ( 3D ) ( 1E ) ( 2E ) ( 3E ) ( 4E ) ( 5E ) ( 6E ) ( 7E ) ( 1F ) ( 2F ) ( 3F ) ( 4F ) ( 5F ) ( 6F )
LORONG LORONG JALAN LORONG LORONG
I II UTAMA III IV
B1 B1 B1 B1 B1 B1 B1 B1 B1 B1 B1 B1 B1 B1 B1 B1 B1 B1 B1 B1 B1 B1 B1 B1 B1

1017.5 900 900 900 600 900 900 642.5 500 642.5 900 900 600 900 900 717.5

12820

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

DENAH RENCANA BALOK PIPA BAJA ELV +2.35 & ELV +2.90 DARI SELASAR

1 : 330
+3.75

RANGKA CREMONA
85

PIPA BAJA Ø1,5"


85

85
+2.90
55

55

55
BANGUNAN +2.35

KIOS
360
375

BALOK PIPA BAJA Ø4"


290
220

MUKA TANAH SELASAR SELASAR MUKA TANAH

+0.15

±0.00
15

±VARIAN
165

-1.65

117.5 620 117.5

855

B A

DETAIL POTONGAN SAMPING

1 : 30
15

DINDING KOLOM PIPA BAJA


BANGUNAN KIOS Ø4"

BAUT ANGKUR
Ø16mm
JUMLAH 4 BH

BASEPLAT t = 10mm
KOLOM PEDESTAL

15
SELASAR KIOS FOOTPLAT
±0.00 35cm x 35cm

VARIAN

40
MUKA TANAH
±VARIAN

80 20 35

100 17.5

117.5

DETAIL KOLOM FASADE DAN BANGUNAN KIOS

1 : 10
ORNAMEN FIBERCEMENT KOLOM PIPA BAJA KOLOM PIPA BAJA Ø4"
DILAPISI ACP BERDIMENSI 20 x 20

LORONG LORONG JALAN LORONG LORONG


I II UTAMA III IV
1017.5 900 900 900 600 900 900 642.5 500 642.5 900 900 600 900 900 717.5

12820

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

TAMPAK DEPAN

1 : 330

RANGKA CREMONA KOLOM PIPA BAJA Ø4" KOLOM PIPA BAJA Ø4" KOLOM PIPA BAJA Ø4" KOLOM PIPA BAJA Ø4"
MIRING 50° MIRING 50° MIRING 50° MIRING 50°

LORONG LORONG JALAN LORONG LORONG


I II UTAMA III IV

1017.5 900 900 900 600 900 900 642.5 500 642.5 900 900 600 900 900 717.5

DETAIL 1 DETAIL 2 DETAIL 3 DETAIL 4 DETAIL 5 DETAIL 6 DETAIL 7 12820 DETAIL 9 DETAIL 10 DETAIL 11 DETAIL 12 DETAIL 13 DETAIL 14 DETAIL 15 DETAIL 16
DETAIL 8
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

PORTAL AS - A

1 : 330

RANGKA CREMONA

LORONG LORONG JALAN LORONG LORONG


I II UTAMA III IV

1017.5 900 900 900 600 900 900 642.5 500 642.5 900 900 600 900 900 717.5

DETAIL 1 DETAIL 2 DETAIL 3 DETAIL 4 DETAIL 5 DETAIL 6 DETAIL 7 12820 DETAIL 9 DETAIL 10 DETAIL 11 DETAIL 12 DETAIL 13 DETAIL 14 DETAIL 15 DETAIL 16
DETAIL 8
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

PORTAL AS - B

1 : 330
KETERANGAN
FOOTPLAT 100 x 100
FP &
KOLOM PEDESTAL 35 x 35

KOLOM PIPA BAJA


K1 Ø4"

BALOK PIPA BAJA


B1 Ø4"

1002.5
ELEVASI MUKA TANAH = VARIAN
102.5 102.5 102.5 102.5 100 100 100 97.5 97.5 97.5

B1 B1 B1 B1 B1 B1 B1 B1 B1 B1
+3.75
140

PIPA BAJA Ø1,5"


K1 K1

+2.35

B1 B1 B1 B1 B1 B1 B1 B1 B1 B1
220
235

K1 K1

+0.15
±0.00
15

±VARIAN

FP FP
165

150

-1.65

1017.5

1 2

DETAIL 1 PORTAL AS - A

1 : 50
KETERANGAN
FOOTPLAT 100 x 100
FP &
KOLOM PEDESTAL 35 x 35

KOLOM PIPA BAJA


K1 Ø4"

BALOK PIPA BAJA


B1 Ø4"

885
ELEVASI MUKA TANAH = VARIAN
98.8 96.9 96.9 100 100 100 98.8 96.9 96.8

B1 B1 B1 B1 B1 B1 B1 B1 B1
+3.75
140

PIPA BAJA Ø1,5"


K1 K1

+2.35

B1 B1 B1 B1 B1 B1 B1 B1 B1
220
235

K1 K1

+0.15
±0.00
15

±VARIAN

FP FP
165

150

-1.65

900

2 3

DETAIL 2 PORTAL AS - A

1 : 50
KETERANGAN
FOOTPLAT 100 x 100
FP &
KOLOM PEDESTAL 35 x 35

KOLOM PIPA BAJA


K1 Ø4"

BALOK PIPA BAJA


B1 Ø4"

885
ELEVASI MUKA TANAH = VARIAN
98.3 98.3 98.3 98.3 98.3 98.3 98.3 98.3 98.3

B1 B1 B1 B1 B1 B1 B1 B1 B1
+3.75
140

PIPA BAJA Ø1,5"


K1 K1

+2.35

B1 B1 B1 B1 B1 B1 B1 B1 B1
220
235

K1 K1

+0.15
±0.00
15

±VARIAN

FP FP
165

150

-1.65

900

3 4

DETAIL 3 PORTAL AS - A

1 : 50
KETERANGAN
FOOTPLAT 100 x 100
FP &
KOLOM PEDESTAL 35 x 35

KOLOM PIPA BAJA


K1 Ø4"

885 KOLOM PIPA BAJA


K2 Ø4" ( MIRING )
81.4 81.5 122.2 157.3 157.3 122.2 81.5 81.4
BALOK PIPA BAJA
B1 Ø4"
+5.68

ELEVASI MUKA TANAH = VARIAN

193.2
K2 K2

B1 B1 B1 B1 B1 B1 B1 B1
+3.75
140

PIPA BAJA Ø1,5"


K1 K1

+2.35

B1 B1 B1 B1 B1 B1 B1 B1

K2 K2
220
235

K1 K1

+0.15
±0.00
15

±VARIAN

FP FP
165

150

-1.65

450 450

900

4 5

DETAIL 4 PORTAL AS - A

1 : 50
KETERANGAN
FOOTPLAT 100 x 100
FP &
KOLOM PEDESTAL 35 x 35

KOLOM PIPA BAJA


K1 Ø4"

BALOK PIPA BAJA


B1 Ø4"

585
ELEVASI MUKA TANAH = VARIAN
97.5 97.5 97.5 97.5 97.5 97.5

B1 B1 B1 B1 B1 B1
+3.75

140
PIPA BAJA Ø1,5"
K1 K1

+2.35

B1 B1 B1 B1 B1 B1
220
235

K1 K1

+0.15
±0.00
15

±VARIAN

FP FP
165

150

-1.65

600

5 6

DETAIL 5 PORTAL AS - A

1 : 50
KETERANGAN
FOOTPLAT 100 x 100
FP &
KOLOM PEDESTAL 35 x 35

KOLOM PIPA BAJA


K1 Ø4"

BALOK PIPA BAJA


B1 Ø4"

885
ELEVASI MUKA TANAH = VARIAN
98.8 96.9 96.9 100 100 100 98.8 96.9 96.8

B1 B1 B1 B1 B1 B1 B1 B1 B1
+3.75
140

PIPA BAJA Ø1,5"


K1 K1

+2.35

B1 B1 B1 B1 B1 B1 B1 B1 B1
220
235

K1 K1

+0.15
±0.00
15

±VARIAN

FP FP
165

150

-1.65

900

6 7

DETAIL 6 PORTAL AS - A

1 : 50
KETERANGAN
FOOTPLAT 100 x 100
FP &
KOLOM PEDESTAL 35 x 35

KOLOM PIPA BAJA


K1 Ø4"

885 KOLOM PIPA BAJA


K2 Ø4" ( MIRING )
81.4 81.5 122.2 157.3 157.3 117.9 84.6 82.6
BALOK PIPA BAJA
B1 Ø4"
+5.68

ELEVASI MUKA TANAH = VARIAN

193.2
K2 K2

B1 B1 B1 B1 B1 B1 B1 B1
+3.75
140

PIPA BAJA Ø1,5"


K1 K1

+2.35

B1 B1 B1 B1 B1 B1 B1 B1

K2 K2
220
235

K1 K1

+0.15
±0.00
15

±VARIAN

FP FP
165

150

-1.65

450 450

900

7 8

DETAIL 7 PORTAL AS - A

1 : 50
KETERANGAN
FOOTPLAT 100 x 100
FP &
KOLOM PEDESTAL 35 x 35

KOLOM PIPA BAJA


K1 Ø4"

BALOK PIPA BAJA


B1 Ø4"

627.5
ELEVASI MUKA TANAH = VARIAN
104.6 104.6 104.6 104.6 104.6 104.6

B1 B1 B1 B1 B1 B1
+3.75

140 PIPA BAJA Ø1,5"


K1 K1

+2.35

B1 B1 B1 B1 B1 B1
220
235

K1 K1

+0.15
±0.00
15

±VARIAN

FP FP
165

150

-1.65

642.5

8 9

DETAIL 8 PORTAL AS - A

1 : 50
KETERANGAN
FOOTPLAT 100 x 100
FP &
KOLOM PEDESTAL 35 x 35

KOLOM PIPA BAJA


K1 Ø4"

KOLOM BETON
KB1 15 x 15

BALOK BETON
BB1 15 x 20

ELEVASI MUKA TANAH = VARIAN

+4.70

BB1
+3.75

KB1 KB1

K1 K1
375

KB1 KB1

+0.15
±0.00
15

±VARIAN

FP FP
100
165

-1.15
50

-1.65

75 350 75

500

9 10

DETAIL 9 PORTAL AS - A

1 : 50
KETERANGAN
FOOTPLAT 100 x 100
FP &
KOLOM PEDESTAL 35 x 35

KOLOM PIPA BAJA


K1 Ø4"

BALOK PIPA BAJA


B1 Ø4"

627.5
ELEVASI MUKA TANAH = VARIAN
104.6 104.6 104.6 104.6 104.6 104.6

B1 B1 B1 B1 B1 B1
+3.75

140 PIPA BAJA Ø1,5"


K1 K1

+2.35

B1 B1 B1 B1 B1 B1
220

K1 K1
250

+0.15
±0.00
15

±VARIAN

FP FP
150

150

-1.65

642.5

10 11

DETAIL 10 PORTAL AS - A

1 : 50
KETERANGAN
FOOTPLAT 100 x 100
FP &
KOLOM PEDESTAL 35 x 35

KOLOM PIPA BAJA


K1 Ø4"

885 KOLOM PIPA BAJA


K2 Ø4" ( MIRING )
81.4 81.5 122.2 157.3 157.3 122.2 81.5 81.4
BALOK PIPA BAJA
B1 Ø4"
+5.68

ELEVASI MUKA TANAH = VARIAN

193.2
K2 K2

B1 B1 B1 B1 B1 B1 B1 B1
+3.75
140

PIPA BAJA Ø1,5"


K1 K1

+2.35

B1 B1 B1 B1 B1 B1 B1 B1

K2 K2
220

K1 K1
250

+0.15
±0.00
15

±VARIAN

FP FP
150

150

-1.65

450 450

900

11 12

DETAIL 11 PORTAL AS - A

1 : 50
KETERANGAN
FOOTPLAT 100 x 100
FP &
KOLOM PEDESTAL 35 x 35

KOLOM PIPA BAJA


K1 Ø4"

BALOK PIPA BAJA


B1 Ø4"

885
ELEVASI MUKA TANAH = VARIAN
98.8 96.9 96.9 100 100 100 98.8 96.9 96.8

B1 B1 B1 B1 B1 B1 B1 B1 B1
+3.75
140

PIPA BAJA Ø1,5"


K1 K1

+2.35

B1 B1 B1 B1 B1 B1 B1 B1 B1
220

K1 K1
250

+0.15
±0.00
15

±VARIAN

FP FP
150

150

-1.65

900

12 13

DETAIL 12 PORTAL AS - A

1 : 50
KETERANGAN
FOOTPLAT 100 x 100
FP &
KOLOM PEDESTAL 35 x 35

KOLOM PIPA BAJA


K1 Ø4"

BALOK PIPA BAJA


B1 Ø4"

585
ELEVASI MUKA TANAH = VARIAN
97.5 97.5 97.5 97.5 97.5 97.5

B1 B1 B1 B1 B1 B1
+3.75

140
PIPA BAJA Ø1,5"
K1 K1

+2.35

B1 B1 B1 B1 B1 B1
220

K1 K1
250

+0.15
±0.00
15

±VARIAN

FP FP
150

150

-1.65

600

13 14

DETAIL 13 PORTAL AS - A

1 : 50
KETERANGAN
FOOTPLAT 100 x 100
FP &
KOLOM PEDESTAL 35 x 35

KOLOM PIPA BAJA


K1 Ø4"

885 KOLOM PIPA BAJA


K2 Ø4" ( MIRING )
81.4 81.5 122.2 157.3 157.3 122.2 81.5 81.4
BALOK PIPA BAJA
B1 Ø4"
+5.68

ELEVASI MUKA TANAH = VARIAN

193.2
K2 K2

B1 B1 B1 B1 B1 B1 B1 B1
+3.75
140

PIPA BAJA Ø1,5"


K1 K1

+2.35

B1 B1 B1 B1 B1 B1 B1 B1

K2 K2
220

K1 K1
250

+0.15
±0.00
15

±VARIAN

FP FP
150

150

-1.65

450 450

900

14 15

DETAIL 14 PORTAL AS - A

1 : 50
KETERANGAN
FOOTPLAT 100 x 100
FP &
KOLOM PEDESTAL 35 x 35

KOLOM PIPA BAJA


K1 Ø4"

BALOK PIPA BAJA


B1 Ø4"

885
ELEVASI MUKA TANAH = VARIAN
96.9 96.9 98.8 100 100 100 96.9 96.9 98.7

B1 B1 B1 B1 B1 B1 B1 B1 B1
+3.75
140

PIPA BAJA Ø1,5"


K1 K1

+2.35

B1 B1 B1 B1 B1 B1 B1 B1 B1
220

K1 K1
250

+0.15
±0.00
15

±VARIAN

FP FP
150

150

-1.65

900

15 16

DETAIL 15 PORTAL AS - A

1 : 50
KETERANGAN
FOOTPLAT 100 x 100
FP &
KOLOM PEDESTAL 35 x 35

KOLOM PIPA BAJA


K1 Ø4"

BALOK PIPA BAJA


B1 Ø4"

702.5
ELEVASI MUKA TANAH = VARIAN
97.5 97.5 97.5 102.5 102.5 102.5 102.5

B1 B1 B1 B1 B1 B1 B1
+3.75

140

PIPA BAJA Ø1,5"


K1 K1

+2.35

B1 B1 B1 B1 B1 B1 B1
220

K1 K1
250

+0.15
±0.00
15

±VARIAN

FP FP
150

150

-1.65

717.5

16 17

DETAIL 16 PORTAL AS - A

1 : 50
KETERANGAN
FOOTPLAT 100 x 100
FP &
KOLOM PEDESTAL 35 x 35

KOLOM PIPA BAJA


K1 Ø4"

BALOK PIPA BAJA


B1 Ø4"

ELEVASI MUKA TANAH = VARIAN

1002.5

102.5 102.5 102.5 102.5 100 100 100 97.5 97.5 97.5

B1 B1 B1 B1 B1 B1 B1 B1 B1 B1
+3.75

PIPA BAJA Ø1,5"


85

+2.90
140

K1 K1
55

+2.35

B1 B1 B1 B1 B1 B1 B1 B1 B1 B1
220
235

K1 K1

+0.30
±0.00
15

±VARIAN

FP FP
165

150

-1.65

1017.5

1 2

DETAIL 1 PORTAL AS - B

1 : 50
KETERANGAN
FOOTPLAT 100 x 100
FP &
KOLOM PEDESTAL 35 x 35

KOLOM PIPA BAJA


K1 Ø4"

BALOK PIPA BAJA


B1 Ø4"

ELEVASI MUKA TANAH = VARIAN

885

98.3 97.3 96.9 100 100 100 98.8 96.9 96.8

B1 B1 B1 B1 B1 B1 B1 B1 B1
+3.75
85

PIPA BAJA Ø1,5"


+2.90
140

K1 K1
55

+2.35

B1 B1 B1 B1 B1 B1 B1 B1 B1
220
235

K1 K1

+0.30
±0.00
15

±VARIAN

FP FP
165

150

-1.65

900

2 3

DETAIL 2 PORTAL AS - B

1 : 50
KETERANGAN
FOOTPLAT 100 x 100
FP &
KOLOM PEDESTAL 35 x 35

KOLOM PIPA BAJA


K1 Ø4"

BALOK PIPA BAJA


B1 Ø4"

ELEVASI MUKA TANAH = VARIAN

885

96.9 96.9 98.8 100 100 100 96.9 96.9 98.7

B1 B1 B1 B1 B1 B1 B1 B1 B1
+3.75
85

PIPA BAJA Ø1,5"


+2.90
140

K1 K1
55

+2.35

B1 B1 B1 B1 B1 B1 B1 B1 B1
220
235

K1 K1

+0.30
±0.00
15

±VARIAN

FP FP
165

150

-1.65

900

3 4

DETAIL 3 PORTAL AS - B

1 : 50
KETERANGAN
FOOTPLAT 100 x 100
FP &
KOLOM PEDESTAL 35 x 35

KOLOM PIPA BAJA


K1 Ø4"

BALOK PIPA BAJA


B1 Ø4"

ELEVASI MUKA TANAH = VARIAN

885

93.7 93.8 93.8 107.5 107.5 107.5 93.7 93.8 93.7

B1 B1 B1 B1 B1 B1 B1 B1 B1
+3.75
85

PIPA BAJA Ø1,5"


+2.90
140

K1 K1
55

+2.35

B1 B1 B1 B1 B1 B1 B1 B1 B1
220
235

K1 K1

+0.30
±0.00
15

±VARIAN

FP FP
165

150

-1.65

900

4 5

DETAIL 4 PORTAL AS - B

1 : 50
KETERANGAN
FOOTPLAT 100 x 100
FP &
KOLOM PEDESTAL 35 x 35

KOLOM PIPA BAJA


K1 Ø4"

BALOK PIPA BAJA


B1 Ø4"

ELEVASI MUKA TANAH = VARIAN

585

97.5 97.5 97.5 97.5 97.5 97.5

B1 B1 B1 B1 B1 B1
+3.75

85
PIPA BAJA Ø1,5"
+2.90

140
K1 K1
55 +2.35

B1 B1 B1 B1 B1 B1
220
235

K1 K1

+0.30
±0.00
15

±VARIAN

FP FP
165

150

-1.65

600

5 6

DETAIL 5 PORTAL AS - B

1 : 50
KETERANGAN
FOOTPLAT 100 x 100
FP &
KOLOM PEDESTAL 35 x 35

KOLOM PIPA BAJA


K1 Ø4"

BALOK PIPA BAJA


B1 Ø4"

ELEVASI MUKA TANAH = VARIAN

885

98.3 97.3 96.9 100 100 100 98.8 96.9 96.8

B1 B1 B1 B1 B1 B1 B1 B1 B1
+3.75
85

PIPA BAJA Ø1,5"


+2.90
140

K1 K1
55

+2.35

B1 B1 B1 B1 B1 B1 B1 B1 B1
220
235

K1 K1

+0.30
±0.00
15

±VARIAN

FP FP
165

150

-1.65

900

6 7

DETAIL 6 PORTAL AS - B

1 : 50
KETERANGAN
FOOTPLAT 100 x 100
FP &
KOLOM PEDESTAL 35 x 35

KOLOM PIPA BAJA


K1 Ø4"

BALOK PIPA BAJA


B1 Ø4"

ELEVASI MUKA TANAH = VARIAN

885

93.7 93.8 93.7 107.5 107.5 107.5 93.8 93.8 93.7

B1 B1 B1 B1 B1 B1 B1 B1 B1
+3.75
85

PIPA BAJA Ø1,5"


+2.90
140

K1 K1
55

+2.35

B1 B1 B1 B1 B1 B1 B1 B1 B1
220
235

K1 K1

+0.30
±0.00
15

±VARIAN

FP FP
165

150

-1.65

900

7 8

DETAIL 7 PORTAL AS - B

1 : 50
KETERANGAN
FOOTPLAT 100 x 100
FP &
KOLOM PEDESTAL 35 x 35

KOLOM PIPA BAJA


K1 Ø4"

BALOK PIPA BAJA


B1 Ø4"

ELEVASI MUKA TANAH = VARIAN

627.5

104.6 104.6 104.6 104.6 104.6 104.6

B1 B1 B1 B1 B1 B1
+3.75

85
PIPA BAJA Ø1,5"
140 +2.90

K1 K1
55
+2.35

B1 B1 B1 B1 B1 B1
220
235

K1 K1

+0.30
±0.00
15

±VARIAN

FP FP
165

150

-1.65

642.5

8 9

DETAIL 8 PORTAL AS - B

1 : 50
KETERANGAN
FOOTPLAT 100 x 100
FP &
KOLOM PEDESTAL 35 x 35

KOLOM PIPA BAJA


K1 Ø4"

ELEVASI MUKA TANAH = VARIAN

+3.75

K1 K1
375

+0.30
±0.00
15

±VARIAN

FP FP
165

150

-1.65

500

9 10

DETAIL 9 PORTAL AS - B

1 : 50
KETERANGAN
FOOTPLAT 100 x 100
FP &
KOLOM PEDESTAL 35 x 35

KOLOM PIPA BAJA


K1 Ø4"

BALOK PIPA BAJA


B1 Ø4"

ELEVASI MUKA TANAH = VARIAN

627.5

104.6 104.6 104.6 104.6 104.6 104.6

B1 B1 B1 B1 B1 B1
+3.75

85
PIPA BAJA Ø1,5"
140 +2.90

K1 K1
55
+2.35

B1 B1 B1 B1 B1 B1
220
235

K1 K1

+0.30
±0.00
15

±VARIAN

FP FP
165

150

-1.65

642.5

10 11

DETAIL 10 PORTAL AS - B

1 : 50
KETERANGAN
FOOTPLAT 100 x 100
FP &
KOLOM PEDESTAL 35 x 35

KOLOM PIPA BAJA


K1 Ø4"

BALOK PIPA BAJA


B1 Ø4"

ELEVASI MUKA TANAH = VARIAN

885

93.8 93.8 93.8 107.5 107.5 107.5 93.7 93.8 93.7

B1 B1 B1 B1 B1 B1 B1 B1 B1
+3.75
85

PIPA BAJA Ø1,5"


+2.90
140

K1 K1
55

+2.35

B1 B1 B1 B1 B1 B1 B1 B1 B1
220
235

K1 K1

+0.30
±0.00
15

±VARIAN

FP FP
165

150

-1.65

900

11 12

DETAIL 11 PORTAL AS - B

1 : 50
KETERANGAN
FOOTPLAT 100 x 100
FP &
KOLOM PEDESTAL 35 x 35

KOLOM PIPA BAJA


K1 Ø4"

BALOK PIPA BAJA


B1 Ø4"

ELEVASI MUKA TANAH = VARIAN

885

98.8 96.9 96.9 100 100 100 98.8 96.9 96.8

B1 B1 B1 B1 B1 B1 B1 B1 B1
+3.75
85

PIPA BAJA Ø1,5"


+2.90
140

K1 K1
55

+2.35

B1 B1 B1 B1 B1 B1 B1 B1 B1
220
235

K1 K1

+0.30
±0.00
15

±VARIAN

FP FP
165

150

-1.65

900

12 13

DETAIL 12 PORTAL AS - B

1 : 50
KETERANGAN
FOOTPLAT 100 x 100
FP &
KOLOM PEDESTAL 35 x 35

KOLOM PIPA BAJA


K1 Ø4"

BALOK PIPA BAJA


B1 Ø4"

ELEVASI MUKA TANAH = VARIAN

585

97.5 97.5 97.5 97.5 97.5 97.5

B1 B1 B1 B1 B1 B1
+3.75

85
PIPA BAJA Ø1,5"
+2.90

140
K1 K1
55 +2.35

B1 B1 B1 B1 B1 B1
220
235

K1 K1

+0.30
±0.00
15

±VARIAN

FP FP
165

150

-1.65

600

13 14

DETAIL 13 PORTAL AS - B

1 : 50
KETERANGAN
FOOTPLAT 100 x 100
FP &
KOLOM PEDESTAL 35 x 35

KOLOM PIPA BAJA


K1 Ø4"

BALOK PIPA BAJA


B1 Ø4"

ELEVASI MUKA TANAH = VARIAN

885

93.7 93.8 93.7 107.5 107.5 107.5 93.8 93.8 93.7

B1 B1 B1 B1 B1 B1 B1 B1 B1
+3.75
85

PIPA BAJA Ø1,5"


+2.90
140

K1 K1
55

+2.35

B1 B1 B1 B1 B1 B1 B1 B1 B1
220
235

K1 K1

+0.30
±0.00
15

±VARIAN

FP FP
165

150

-1.65

900

14 15

DETAIL 14 PORTAL AS - B

1 : 50
KETERANGAN
FOOTPLAT 100 x 100
FP &
KOLOM PEDESTAL 35 x 35

KOLOM PIPA BAJA


K1 Ø4"

BALOK PIPA BAJA


B1 Ø4"

ELEVASI MUKA TANAH = VARIAN

885

96.9 96.9 98.8 100 100 100 96.9 96.9 98.7

B1 B1 B1 B1 B1 B1 B1 B1 B1
+3.75
85

PIPA BAJA Ø1,5"


+2.90
140

K1 K1
55

+2.35

B1 B1 B1 B1 B1 B1 B1 B1 B1
220
235

K1 K1

+0.30
±0.00
15

±VARIAN

FP FP
165

150

-1.65

900

15 16

DETAIL 15 PORTAL AS - B

1 : 50
KETERANGAN
FOOTPLAT 100 x 100
FP &
KOLOM PEDESTAL 35 x 35

KOLOM PIPA BAJA


K1 Ø4"

BALOK PIPA BAJA


B1 Ø4"

ELEVASI MUKA TANAH = VARIAN

702.5

97.5 97.5 97.5 102.5 102.5 102.5 102.5

B1 B1 B1 B1 B1 B1 B1
+3.75

85
PIPA BAJA Ø1,5"
+2.90
140

K1 K1
55

+2.35

B1 B1 B1 B1 B1 B1 B1
220
235

K1 K1

+0.30
±0.00
15

±VARIAN

FP FP
165

150

-1.65

717.5

16 17

DETAIL 16 PORTAL AS - B

1 : 50
KETERANGAN
FOOTPLAT 100 x 100
FP &
KOLOM PEDESTAL 35 x 35

KOLOM PIPA BAJA


K1 Ø4"

BALOK PIPA BAJA


B1 Ø4"

840 ELEVASI MUKA TANAH = VARIAN

105 105 105 105 105 105 105 105

B1 B1 B1 B1 B1 B1 B1 B1
+3.75
140

PIPA BAJA Ø1,5"


K1 K1
+2.35

B1 B1 B1 B1 B1 B1 B1 B1
220

K1 K1
250

+0.15
±0.00
15

±VARIAN

FP FP
150

150

-1.65

855

B A

PORTAL AS - 1

1 : 50
KETERANGAN
FOOTPLAT 100 x 100
FP &
KOLOM PEDESTAL 35 x 35

KOLOM PIPA BAJA


K1 Ø4"

ELEVASI MUKA TANAH = VARIAN

+3.75
140

K1 K1
+2.35
220

K1 K1
250

+0.15
±0.00
15

±VARIAN

FP FP
150

150

-1.65

855

B A

PORTAL - AS 2 S/D PORTAL AS - 16

1 : 50
KETERANGAN
FOOTPLAT 100 x 100
FP &
KOLOM PEDESTAL 35 x 35

KOLOM PIPA BAJA


K1 Ø4"

BALOK PIPA BAJA


B1 Ø4"

ELEVASI MUKA TANAH = VARIAN

840

105 105 105 105 105 105 105 105

B1 B1 B1 B1 B1 B1 B1 B1
+3.75
85

PIPA BAJA Ø1,5"


+2.90
140

K1 K1
55

+2.35

B1 B1 B1 B1 B1 B1 B1 B1
220

K1 K1
250

+0.15
±0.00
15

±VARIAN

FP FP
150

150

-1.65

855

B A

PORTAL AS - 17

1 : 50
8 9 10 11

642.5 500 642.5


37.5

37.5
2 2
80

80
SELASAR SELASAR
DINDING DINDING
AS BANGUNAN TERLUAR KIOS TERLUAR KIOS

AS BANGUNAN

TERLUAR KIOS

TERLUAR KIOS

AS BANGUNAN

AS BANGUNAN
DINDING
DINDING
KIOS KIOS KIOS KIOS

KIOS

KIOS
KIOS

KIOS
855

620

620

855
19 20 21 22
( 2C ) ( 3C ) ( 1D ) ( 2D )

A C

B
DINDING DINDING
TERLUAR KIOS TERLUAR KIOS
80

80
SELASAR SELASAR

1 1
37.5

37.5
642.5 500 642.5

8 9 10 11

DENAH RENCANA GAPURA ENTRANCE

1 : 100
+4.85 +4.85 +4.85

BALOK BETON BALOK BETON


15 x 20 15 x 20

BALOK DILAPISI ACP


BERDIMENSI 30 x 30

BALOK BETON
15 x 20

KOLOM BETON KOLOM BETON


15 x 15 15 x 15
485

485

485
KOLOM DILAPISI ACP KOLOM DILAPISI ACP KOLOM DILAPISI ACP
BERDIMENSI 30 x 30 BERDIMENSI 30 x 30 BERDIMENSI 30 x 30

MUKA TANAH
±0.00 ±0.00 ±0.00 ±0.00

SLOOF 15 x 20 SLOOF 15 x 20
100

100
FONDASI
BATU KALI
FONDASI BATU KALI
-1.00 -1.00
50 50 50

150

350 50 50 50

150

POTONGAN A - A POTONGAN B - B POTONGAN C - C

1 : 40 1 : 40 1 : 40
DINDING TERLUAR KIOS
DINDING TERLUAR KIOS
50

50
15 SLOOF
30 L. ATAS ATU KALI
A
150

150
50

50
50 L. BAWAH ATU KALI
60 AANSTAMPING
50

50
KOLOM PEDESTAL
35 x 35
A A

KOLOM BAJA K1
H - BEAM 150.150.7.10
KOLOM BETON 15 x 15

42.5 75 350 75 42.5

500

9 10

DETAIL DENAH RENCANA FONDASI BATU KALI GAPURA ENTRANCE

1 : 30
30

15

KOLOM DILAPISI ACP


BERDIMENSI 30 x 30

KOLOM 15 x 15

MUKA TANAH MUKA TANAH


±0.00 ±0.00

20
SLOOF 15 x 20

ANGKUR Ø10

30
TRASRAM

60
30
PASANGAN BATU KALI

15
PASANGAN BATU KOSONG

20
LAPISAN PASIR t = 5 cm

5
MUKA TANAH

5 10 7.5 15 7.5 10 5

5 10 30 10 5

5 50 5

60

POTONGAN A

1 : 10
KETERANGAN
SLOOF
S1 15 x 20

DINDING TERLUAR KIOS


DINDING TERLUAR KIOS
50

50
S1 S1
150

150
50

50
S1 S1
50

50
KOLOM PEDESTAL S1 S1
35 x 35
A A

KOLOM BAJA K1
H - BEAM 150.150.7.10

42.5 75 350 75 42.5

500

9 10

DETAIL DENAH RENCANA SLOOF GAPURA ENTRANCE

1 : 30
SCHEDULE SLOOF
KETERANGAN SLOOF 15 x 20

20
SKETSA

15

TULANGAN ATAS 2 D13

TULANGAN TENGAH -

TULANGAN BAWAH 2 D13

SENGKANG D10 - 100

SCHEDULE SLOOF

1 : 10
KETERANGAN
KOLOM BETON
KB1 15 x 15
8 BH

DINDING TERLUAR KIOS


DINDING TERLUAR KIOS

KB1 KB1
50

50
KB1 KB1
150

150
50

50
KB1 KB1
50

50
KOLOM PEDESTAL
35 x 35
A A
KB1 KB1

KOLOM BAJA K1
H - BEAM 150.150.7.10

42.5 75 350 75 42.5

500

9 10

DETAIL DENAH RENCANA KOLOM BETON GAPURA ENTRANCE

1 : 30
SCHEDULE KOLOM BETON
KETERANGAN KOLOM BETON 15 x 15

15
SKETSA

15

TULANGAN ATAS 2 D13

TULANGAN TENGAH -

TULANGAN BAWAH 2 D13

SENGKANG D10 - 100

SCHEDULE KOLOM BETON

1 : 10
KETERANGAN
BALOK BETON
BB1 15 x 20

DINDING TERLUAR KIOS


DINDING TERLUAR KIOS

BB1
50

50
BB1 BB1
BB1
150

150
50

50
BB1 BB1
BB1
50

50
KOLOM PEDESTAL BB1 BB1
35 x 35 BB1
A A

KOLOM BAJA K1
H - BEAM 150.150.7.10

42.5 75 350 75 42.5

500

9 10

DETAIL DENAH RENCANA BALOK GAPURA ENTRANCE

1 : 30
SCHEDULE BALOK BETON
KETERANGAN BALOK BETON 15 x 20

20
SKETSA

15

TULANGAN ATAS 2 D13

TULANGAN TENGAH -

TULANGAN BAWAH 2 D13

SENGKANG D10 - 100

SCHEDULE BALOK BETON

1 : 10