Machine Audits

On-site expert performance analysis with recommended actions

Husky experts work with customers to identify and resolve equipment performance issues.

Benefits Degradation back to its as-shipped condition. The audit


• Husky machine audits identify Studies of hundreds of machine audits have consists of a technical evaluation and a
performance gaps and provide shown that if not properly maintained the predictive audit to detect possible failure
solutions performance of injection molding machines sources that can affect machine reliability.
• Audits identify outstanding safety degrades over time. Our analysis has shown
bulletins and available upgrades
that over the course of a 10 year period, This is an opportunity for customers to gain
• Implementation of audit recom-
performance degradation averages 17%. insight into factors that may be affecting
mendations restore machines to as
The Husky® machine audit program identi- overall productivity targets. Prior to visiting
new performance condition
fies performance gaps and recommends the customer, performance data and other
courses of action to make a customer’s older information, such as safety and service
Features
machine perform like new again. bulletins, are gathered and call logs are
• Ideal for machines more than
3 years old reviewed. Any previously recommended
• Safety audit check points Husky machine audit upgrades or enhancements are examined
• Geometric inspection Machine audits are a valuable way for to see what may have already been imple-
• Thermal imaging of electrical customers to understand if their injection mented. In addition, model and serial
cabinet, pumps and motors molding machines are running at peak per- numbers for the machine are required,
• Energy utilization measurement formance. This is achieved by performing a allowing us to fully research any customiza-
• Field Bus signal and strength gap analysis, which helps to define recom- tions in advance.
robustness (where applicable) mended actions that will restore machinery
• Pump case drain flow testing
(where applicable)
• Oil contamination measurement
and analysis
• Recommended actions to help
restore machine to as-shipped
condition
Summary list of audit check points
Each audit check point is rated on a scale of
pass, fail, not applicable. In many categories
the technician will take photographs, appli-
cable screen shots or other images that
will be included in the report to support
the written documentation. Check points
range from safety focused elements to
specific measurements of the machine for
energy utilization and oil contamination.

Audit checkpoints include:


• Safety issues (verification of safety
interlocks, all applicable safety bulletins
examined)
• System visual inspection (hydraulic/water/ Performance analysis is a valuable tool to help maintain productivity.
air leakage, hoses, etc.)
• Control measurements (voltages, hydraulic
pressures, temperatures, levels, etc.) Post-visit reporting of issues found and the recommendation
• System level check and platen parallelism Following the audit, findings are presented for correction. If previous audits were per-
inspection to the customer in two ways, the first is the formed on the machines the report will
• Review of machine events (analysis of audit check list. The second is the system highlight what was recommended and
cycle interruptions/alarms) audit summary, which is a comprehensive implemented or not implemented since
• Repeatability (analysis of machine data post-visit report that includes the follow- that time.
logging) ing:
• Upgrades installation check (implementa- • Complete summary of system issues and Who should have machines audited?
tion verification) findings Machines that are more than three years of
• Energy measurement and consumption • Husky’s recommendations for immediate, age may no longer be running at optimal
• Oil particle analysis (contamination level medium and long-term solutions rates and are ideal candidates for an audit.
per ISO standard 4406) • An associated cost evaluation for the ad- The output may be slightly less than when
• Thermographic analysis (power pack/elec- vised corrective actions and improvement the machine was new. Machines that have
trical panels) opportunities not been maintained to the standards out-
• Field Bus testing—where applicable (ana- • Risk assessment chart detailing a ma- lined in the machine maintenance manual,
lyzes the integrity and signal quality levels chine’s low, medium, and high risk issues because of productivity demands, should
of the Profibus communications system with respect to safety, downtime and also be audited.
• Pump case drain flow testing—where reduced performance
applicable (measures the flow rate back to Contact Husky today for more information
tank on variable displacement pumps) This report typically includes visual images on machine audits.

Husky Injection Molding Systems


www.husky.ca

Head Office Canada • Tel. (905) 951 5000 • Fax (905) 951 5384 ® HUSKY, HUSKY KEEPING OUR CUSTOMERS IN THE LEAD & DESIGN are
registered trade-marks of Husky Injection Molding Systems Ltd. in the
Asia China • Tel. (86) 21 3850 8000 • Fax (86) 21 5048 4900 United States and other countries, and may be used by certain of its affiliated
companies under License. Other HUSKY product or service names or logos
Europe Luxembourg • Tel. (352) 52 11 51 • Fax (352) 52 60 10 referenced in these materials are trade-marks of Husky Injection Molding
Systems Ltd. and may be used by certain of its affiliated companies under
License.
© 2013 Husky Injection Molding Systems Ltd. All rights are reserved.

Please recycle. 13-062 September 2013

You might also like