SUBMITTED BY: NOTED:

QUANTITY
ITEM NO. DESCRIPTION REMARKS
PLANNED ACTUAL
NORMITA A. NOBLE
Engineer III
B.5 Project Billboard/Sign Board 3.00 each 3.00 each

B.7 Occupation Safety and Health Program 2.67 months 2.67 months
The indicated item of works
have been accomplished in
B.8 Traffic Management 2.67 months 2.67 months accordance with the plans,
specifications and program of
works.
B.9 Mobilization and Demobilization 1.00 ls 1.00 ls

506(1) Stone Masonry 38.00 m³ 38.00 m³

SUBMITTED BY: NOTED:

NORMITA A. NOBLE EMMANUEL


JOSUE B. CENA
A. ABAYGAR
Engineer III Engineer
Engineer
II III