Professional Documents
Culture Documents
QUANTITY
ITEM NO. DESCRIPTION REMARKS
PLANNED ACTUAL
NORMITA A. NOBLE
Engineer III
B.5 Project Billboard/Sign Board 3.00 each 3.00 each
B.7 Occupation Safety and Health Program 2.67 months 2.67 months
The indicated item of works
have been accomplished in
B.8 Traffic Management 2.67 months 2.67 months accordance with the plans,
specifications and program of
works.
B.9 Mobilization and Demobilization 1.00 ls 1.00 ls